Turkey Point Unit 4 - Inservice Inspection Program Owner'S Activity Report for Fifth Inservice Inspection Interval
ML16202A150
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/12/2016
From: Summers T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ISI-PTN-4-2016, L-2016-138
Download: ML16202A150 (6)


Text

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-00001 Re: Turkey Point Unit 4 Docket No. 50-251 lnservice Inspection Program Owner's Activity Report (OAR-1) JUL 1 2 2016 L-2016-138 10 CFR 50.55a Attached find the Owner's Activity Report (Form OAR-1), for Turkey Point Unit 4 Fifth lnservice Inspection Interval, First Period, Second Outage (PTN 4-29). The Form OAR-1, Owner's Activity Report, implements Code Case N-532-4. Should there be any questions concerning this report, please contact Mr. Mitch Guth, Licensing Manag_er, at 305-246-6698. Sincerely, Vice President Turkey Point Nuclear Plant

  • SM Attachment cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9760 S.W. 344111 Street Homestead, FL 33035 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISl.,.PTN-4-2016 ) Plant: Turkey Point Nuclear Power Plant Unit 4 9760 SW-344th street Homestead, Florida 33035 EC-286459 Rev. O PTN-ENG-SESJ-16-009 Page 1 of5 Commercial Service Date: September 7. 1973 Refueling Outage No.: PTN 4-29 Current lnspectionlnterval: ISi-Fifth IWE*Second Current Inspection Period: ISi Fifth Interval-First and IWE-Third Edition and Addenda of Section XI applicable to the inspection plans: ISi Fifth lnterval-2007 Edition with Addenda through 2008 and IWE .. 2001 with Addenda through 2o03. * -* -* --Date and Revision of inspection plans: ISi Fifth Interval Effective-January 21. 2015 Rev.a and !WE-April 5, 2016. Rev.1 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: ASME Section XI 2007 Edition through 2008 Addenda
  • Code Cases Used: Approved Code Cases listed in lnspedion Plan CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) tne examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluation.s supporting the completion of PTN4-29 conform to the requirements of Section XI. Signed /d,,,r:.u;, £dt;f'Re'&uP( rr<"' Date --..... ..... rZ_z_c---+-__ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National B.oard of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by the Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the reqt:Jirements of Section XI. By signing this certificate neither the Inspector nor his employer mfilkes any warranty, expressed *or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with Commissions N_B 1¢2'1.2 .4,,,J, 1 &eol<l c,,4 98.:3 National Board, State, Province and
  • I, ' : . : : : '. I' : I ; : ' 1 : I .

FORM OAR-1 OWNER'S ACTIVITY REPORT r i. TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None None None

  • -3 --FORM OAR-1 OWNER'S ACTIVITY .REPORT TABLE2 ABSTRACT OF REPAIR/Rl;PLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date Repair/Replacement Description Of Work Completed Plan Number Steam 1 Generator Replace Bolt 04/25/2016 RR40350540-01 4E210A .. ** Steam 1 Generator Install Tube Plug 04/25/2016 RR40350547-01 4E210B 1 Snubber Replace bolting 04/08/2016 RR40364134-36 4-1053 on support 1 Safety Valve Replace one 04/25/2016 RR40365695-01 RV-4,.5518 stud aild nut -1 Piping at Pen-11 Prep for NOE 04/14/2016 RR40459962-01 . Piping Modify piping for 2 RCP 04/25/2016 RR40273327-18 4P200A modification Piping Modify piping for 2 RCP 04/25/2016 RR40361761-18. 4P200B modification Piping Modify piping for I 2 4P200C RCP 04/25/2016 RR40361762-21 modification .. 2 Control Valve Replace Bolting 04/25/2016 RR40273327-26 CV-4-303A

-*'. ! FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2-ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date Repair/Replacement

  • pescription Of Work Completed Plan.Number ',--2 Control Valve Replace Bolting 04/25/2016 RR40361761-26 cv4..:303s 2 Control Valve Replace Bolting 04/25/2016 RR40361762-26 CV-4-303C 2 Support Cut and weld 04/09/2016 RR40365364-06 4P214B support 2 Relief Valve Replace Bolting 04/25/2016 RR40303578-01 RV-4-1403 2 Snubber Support Modify Support 04/21/2016 RR40343601-01 4-1105, 4-1106 2 Snubber Support Replace 04/21/2016 RR4Q459254-01 4-1106 Sn_uobers 2 Relief Valve Replace Bolting 04/25/2016 RR40350593-01 RV-4-1407 *. 2 Flange Replace Bolting 04/25/2016 RR40368049-01 FE-4-127 2 Valve Replace Bolting 04/25/2016 RR40366792-01 CV-4-2902 Containment Cut and Reroute 2 Spray Full-Flow piping during 03/24/2016 RR40369651-54 Recirculation ccw Piping modification I i FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE2 ABSTRACT 0.F REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date ' Repair/Replacement Description Of Work Completed Plan Number Heat Exchanger Retube and 3 bolting 03/12/2015 RR40088999-01 4E207A replacement 3 Heat Exchanger Replace Bolting 12/24/2015 RR40397 457-02 4E207C 3 Heat Exchanger Replace Bolting 01/15/2016 RR40434157-01 4E207B Heat Exchanger Retube and 3 bolting ' 04/10/2015 RR40089001-01 4E207C replacement Fukushima 3 Tank Modification, 11/25/2014 RR40318922-05 4T8 Add Emergency Connection Piping Flange 3 ICW Crawl-thru Replace Bolting 04/21/.2016 RR40350677-01 Flanges Piping Flange 3 ICW Crawl-thru Replace Bolting . 04/21/2016 RR40350677-1 O Flanges