ML111190066
From kanterella
Revision as of 03:06, 4 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML111190066 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 04/29/2011 |
From: | Gibson L K Plant Licensing Branch IV |
To: | Edington R K Arizona Public Service Co |
Gibson, Lauren, NRR/DORL/LPL4, 415-1056 | |
References | |
TAC ME5233, TAC ME5234, TAC ME5235 | |
Download: ML111190066 (5) | |
Similar Documents at Palo Verde | |
---|---|
Category:Meeting Summary
MONTHYEARML23258A1402023-09-27027 September 2023
[Table view]Summary of August 31, 2023, Presubmittal Meeting with Arizona Public Service Company to Discuss Planned Submittal of License Renewal Commitment Regarding Alloy 600 Management Program Plan at Palo Verde Station, Units 1, 2, & 3 ML23150A1982023-06-0505 June 2023 Summary of 5/25/2023, Presubmittal Meeting with Arizona Public Service Company to Discuss ASME, Section XI Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde, Units 1, 2, and 3 ML23097A0692023-04-14014 April 2023 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request Regarding Containment Temperature and Safety Injection Tank Volume at Palo Verde Units 1, 2, and 3 ML23095A0932023-04-0606 April 2023 Summary of April 4, 2023, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station ML23072A0312023-03-14014 March 2023 March 1, 2023, Summary of Meeting with Arizona Public Service Company to Discuss Proposed 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML22314A2742022-11-15015 November 2022 October 27, 2022 Meeting with Arizona Public Service Company to Discuss Proposed LAR to Adopt TSTF-107, Revision 4, Separate Control Rods That Are Untrippable Versus Inoperable, for Palo Verde, Units 1, 2, & 3 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22098A0322022-04-20020 April 2022 Summary of April 6, 2022, Public Meeting with Arizona Public Service Company to Discuss Upcoming License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-487 (EPID L-LRM-0025) ML21347A9522021-12-14014 December 2021 Summary of December 9, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming LAR to Adopt TSTF-567, Add Containment TS to Address GSI-191 Issues for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21333A0022021-12-0202 December 2021 Summary of Pre-Submittal Meeting with Arizona Public Service Company RIPE Exemption for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21278A5462021-10-13013 October 2021 Summary of Meeting with Arizona Public Service Company to Discuss Relief Request No. 68 for Certain ASME Code Piping for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21245A4152021-09-0808 September 2021 Summary of Public Meeting with Arizona Public Service Company to Discuss Upcoming Exemption to Eliminate Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station ML21168A2632021-06-24024 June 2021 Summary of June 16, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming Relief Request No. 67, Extension of Containment Tendon Inservice Testing from 10 Years to 20 Years for Palo Verde Nuclear Generating Station, U ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21134A0002021-05-18018 May 2021 Summary of Public Meeting with Arizona Public Service Company to Discuss Upcoming Order License Transfer from Pnm to Salt River Project Agriculture Improvement and Power District for Palo Verde, Units 1 and 2 and the ISFSI ML21061A3202021-03-10010 March 2021 Summary of February 25, 2021, Public Meeting with Nuclear Energy Institute to Further Discuss the Inclusion of TSTF-425 Under the Risk-Informed Process for Evaluations Initiative ML21055A8502021-02-24024 February 2021 Public Meeting Summary ML21011A2742021-01-26026 January 2021 Summary of January 6, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming LAR Regarding Containment Integrated Leak Rate Test Permanent Extension to 15 Years for Palo Verde Nuclear Generating Station, Units 1, 2, an ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19219A6122019-08-13013 August 2019 Summary of July 11, 2019, Teleconference with APS to Discuss Proposed License Amendment Request to Revise the Emergency Plan for Palo Verde Nuclear Generating Station ML17353A1902017-12-29029 December 2017 Summary of 12/12/2017, Public Meeting with Arizona Public Service Company, on Proposed Relief Request 50 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML17003A0352017-01-0404 January 2017 Summary of Pre-Application Meeting with Arizona Public Service to Discuss a Proposed Second Emergency License Amendment Request to Revise Technical Specification 3.8.1, AC (Alternating Current) Sources - Operating, for Palo Verde Nuclear ML16088A0602016-04-15015 April 2016 3/24/16 Summary of Pre-application Meeting with Arizona Public Service Company to Discuss Next Generation Fuel License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML16028A3942016-02-12012 February 2016 Summary of Prelicensing Meeting with Arizona Public Service Company to Discuss Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML16011A0582016-01-21021 January 2016 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 ML15306A2352015-11-13013 November 2015 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Degraded Voltage Relay Setpoints License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15286A0282015-10-23023 October 2015 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Revised Methodology for Spent Fuel Pool Criticality Analysis and Associated Technical Specification Changes for Palo Verde, Units 1, 2, and 3 (CAC MF6600-MF6602) ML15268A1312015-10-0505 October 2015 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 ML15239B3222015-09-0909 September 2015 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 ML15244B0772015-09-0101 September 2015 Summary of Annual Assessment Meeting with Arizona Public Service Regarding Palo Verde Nuclear Generating Station 2014 Performance ML15173A2892015-06-30030 June 2015 June 9, 2015, Summary of Category 1 Public Meeting with Arizona Public Service Company to Discuss Palo Verde Nuclear Generating Station Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned NTTF Recommendation ML15140A3142015-06-16016 June 2015 Summary of Preapplication Meeting with Arizona Public Service Company to Discuss Revised Methodology for Spent Fuel Pool Criticality Analysis and Associated Technical Specification Changes for Palo Verde, Units 1, 2, and 3 (TAC MF5843-MF584 ML15117A0422015-04-29029 April 2015 Memorandum to File Summarizing 4/24/15 Telephone Conference Granting Verbal Relief for Relief Request 53, Request for Approval of an Alternative to ASME Code, Section XI, Requirements for Flaw Removal ML15078A0052015-03-25025 March 2015 Summary of 2/18/2015 Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3 on TSTF-505, Risk-Informed Technical Specifications ML14150A1772014-06-0202 June 2014 Summary of Conference Call Regarding Spring 2014 Steam Generator Tube Inspections ML14136A0582014-06-0202 June 2014 5/14/2014 Summary of Meeting with Arizona Public Service Company to Discuss Flooding Hazard Reevaluation Extension Request for Palo Verde, Units 1, 2, and 3; Near-Term Task Force Recommendation 2.1 ML14099A4692014-04-21021 April 2014 Summary of 4/2/2014 Pre-Application Meeting with Arizona Public Service Company to Discuss Extension of Authorized Repair to Palo Verde, Unit 3, Bottom Mounted Instrumentation to End-of-Unit Life ML13333B5742013-12-0505 December 2013 Summary of 11/1/2013 Conference Call Regarding the Fall 2013 Steam Generator Tube Inspections ML13330A5732013-12-0505 December 2013 Verbal Authorization of Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI Interval ML13312A5402013-11-18018 November 2013 11/5/2013 Summary of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 ML13311B1832013-11-18018 November 2013 Summary of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3 ML13234A0052013-08-26026 August 2013 8/21/2013 - Summary of Preapplication Meeting with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 ML13203A0852013-08-0505 August 2013 Summary of Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request Related to the Startup Test Activity Reduction Program at Palo Verde, Units 1, 2, and 3 (TAC Nos. MF1932-MF1934) ML13154A4502013-06-26026 June 2013 Summary of Meeting Via Conference Call with Arizona Public Service Co. to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME816 ML13161A2522013-06-26026 June 2013 Summary of Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF0831) ML13154A4322013-06-13013 June 2013 5/30/13 Summary of Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF083 ML12244A2152012-09-20020 September 2012 8/30/2012 Summary of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1115704912011-06-0202 June 2011 Meeting Summary for Public Meeting with Arizona Public Service to Discuss the Performance Results for Palo Verde, Units 1, 2 and 3 for the Period of January 1 Through December 31, 2010 ML1111900662011-04-29029 April 2011 3/27/11 Correction to Summary of Pre-Licensing Meeting with Arizona Public Service Company to Discuss Potential Submittal to Revise Technical Specification 3.7.4, Atmospheric Dump Valves, for Palo Verde, Units 1, 2, and 3 (TAC Nos. ME5233-M 2023-09-27 Category:Letter MONTHYEARML24019A2012024-01-19019 January 2024
[Table view]Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19 |
Retrieved from "https://kanterella.com/w/index.php?title=ML111190066&oldid=469741"