MONTHYEARML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20090L7491984-05-0404 May 1984 Rev 11 to Procedure 7220-C-230(Q), Tech Specs for Subcontract for Operating Onsite Batch Plant & Furnishing Concrete ML20090K7691984-05-0202 May 1984 Rev 6 to Procedure 7220-C-210, Tech Spec for Plant Foundation Excavation & Cooling Pond Dikes. Incomplete Rev 7 to Procedure 7220-C-211, Tech Spec for Backfill & Related Info,Including Spec Change Notices,Encl ML20090K7661984-05-0202 May 1984 Rev 7 to Procedure 7220-C-210, Tech Spec for Plant Foundation Excavation & Cooling Pond Dikes ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20076N1401983-07-15015 July 1983 Rept of Overhead Fluid Grouting Test Program ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20023D1331983-05-0505 May 1983 Evaluation of Pressures in Lines of Grouting Equipment - Crack Repair Borated Water Storage Tank Foundations. ML20081J6571983-04-12012 April 1983 Test Program Status & Rev 12 - Test Schedule ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl 1985-12-13
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20090L7491984-05-0404 May 1984 Rev 11 to Procedure 7220-C-230(Q), Tech Specs for Subcontract for Operating Onsite Batch Plant & Furnishing Concrete ML20090K7691984-05-0202 May 1984 Rev 6 to Procedure 7220-C-210, Tech Spec for Plant Foundation Excavation & Cooling Pond Dikes. Incomplete Rev 7 to Procedure 7220-C-211, Tech Spec for Backfill & Related Info,Including Spec Change Notices,Encl ML20090K7661984-05-0202 May 1984 Rev 7 to Procedure 7220-C-210, Tech Spec for Plant Foundation Excavation & Cooling Pond Dikes ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl ML20071D9031983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Centrifugal Pump ML20071D9271983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Hydrazine Addition Positive Displacement Pump ML20071D9361983-02-0202 February 1983 Rev 1 to Hydraulic Snubbers 1985-12-13
[Table view] |
Text
__ _
' 9t l s
...E PROCEDURE FOR PERFORMING INTERNAL M'
QUALITY ASSURANCE AUDITS 1
\\
l S
N a
N y
v c
E o
1
)N b
ADMINISTRATIVE
(
g p
TASK PROCEDURE NO:
ATP-6-Q 5
e y
R REVISION NO:
2 e
D E
o M
${i-G 2'
DATE:
June 01, 1983 v
m x
PAGE:
1 of 8
!FORMATOf D D o.
2&Lswe d ~ /- f8 PREPARED BY/DATE:
g
./. b APPROVED BY/DATE:
y 8306140573 830607 PDR ADOCK 05000329 A
PDR MARK G.
JONES ENGINEERING CONSULTANTS, INC.
333 Hayes Street San Francisco, California 94102
ATP-6-Q Revision 2 Page 2 of 8 TABLE OF REVISIONS Revision 0, Date January 28. 1983 Original Issue Revision 1, Date May 26. 1983 Revised Secticns II and IV.
Revision 2, Date June 01, 1983 Revised Sections IVA, IVE,, IVF, V,
Revised Exhibit 1.0 I
-um e
e l
ATP-6-Q Revision 2 Page 3 of 8 Procedure for Performing Internal Quality Assurance Audits I.
SCOPE This procedure provides the guidelines for performing internal QA Audits of MGJEC Projects that are covered by the MGJEC QA Program (Reference 1).
II.
RESPONSIBILITIES The President or his designee shall be responsible f or initiating CA Audits according to this procedure.
The Project Manager shall determine and implement, corrective action for all audit findings.
III.
DEFINITIONS A.
Audit
- A documented activity performed in accordance with written procedures or checklists to verify, by examination and evaluation of objective
- evidence, that applicable elements of the Quality Assurance Assurance Program have been developed, documented and effectively implemented in accordance with specified requirements.
B.
Audit Team Leader - An individual not directly responsible for the project, who is qualified to organize and direct an aucit, report findings and evaluate corrective actions.
C.
Audit Team Member - Any individual, not directly working on the task being audited, who performs any portion of an audit.
ATP-6-Q Revision 2 Page 4 of 8
/
IV.
PROCEDURE A.
An Audit shall be conducted of all elements of the MGJEC QA Program (see IVC below) at least once during the duration of a project or every 6 months for projects lasting over 6 months.
The elements of the MGJEC QA Program may, at the option of MGJEC management, be audited through a series of audits during the 6 month period.
B.
Audit Team Leaders / Members s' all be trained in accordance h
with ATP-7-Q; " Procedure for Training MGJEC Audit Team Members".
C.
In accordance with the audit check list prepared by MGJEC management personnel, the following areas of the MGJEC QA Program will be subject to the audit:
._..c
ATP-6-Q Revision 2 Page 5 of 8 1)
Project Files 2)
Design Criteria
'3)
Calculations 4)
Computer Programs 5)
Drawings 6)
Field Investigations 7)
Interface Control 8)
Reports 9)
Specifications 10)
Design Reviews 11)
Procedures D.
The Audit ~
shall be conducted to determine if the requirements of the Quality Assurance Manual (Reference 1).
are being met and to determine the effectiveness of the program.
E.
The Audit shall be conducted as f ollows with the methods f or verification determined by the Audit-Team Leader:
1)
Obtain specific instruction from MGJEC Management Personnel.
i.e.,
specific areas to be audited.
~
2)
Verify that MGJEC personnel have the procedures that were assigned to them.
3)
Verify that the procedures are being followed in performing the assigned tasks.
4)
Verify that project documents are identified and filed in accordance with the procedures and O.
A.
Manual.
5)
Verify that MGJEC personnel understand the project organization with regard to reporting relationships.
Follow-up corrective action is deemed required and page 2 of the Quality Assurance Audit Report (Exhibit 1.0) is completed whenever a
condition is noted which deviates from~ the requirements and procedures of the Audit Check List.
Corrective actions and scheduled l
completions shall be documented by the Project Manager on Page 2
of Exhibit 1.0.
Verification of follow-up corrective action is performed by an Audit Team Member and documented on the Quality Assurance Audit Report.
The completed-Audit report is forwarded to the President for l
final review and signature.
ATP-6-0 Revision 2 Page 6 of 8 V.
REQUIRED DOCUMENTATION A.
Quality Assurance Audit Report Form QA-1 (Exhibit 1.0)
VI.
REFERENCE 1.
MGJEC Quality Assurance Manual (latest revision).
w 4
e e
j f
l I
mark g. Jones Page 1 of engineering consultants, Inc.
EXHIBIT 1.0 ATP-6-Q FORM QA-1 Revision 2 QUALITY ASSURANCE AUDIT REPORT Page 7 of a d
AUDIT REPORT NO, Client Proj ect l
Audit No.
Audit Date QA Manual Rev.
Audit Team Members AREAS AUDITED:
O Project Files O Field Investigation O Design Review
[.J Design Criteria O Interface Control O other:
O Calculations O Reports O Computer Programs O Specifications O Drawings O Subcontractor CORRECTIVE ACTION REQUIRED: O No O Yes, see page 2 COMMENTS:
l Audit Team Leader Date Audit Reviewed:
Project Manager Date Follow-up Review Completed:
Auditor Date Approved:
President Date
mark g. jones Enkineering consultants, inc.
> ee 2 or FORM OA-1, PAGE 2 Exhibit 1.0 CORRECTIVE ACTION REPORT ATP-6-0 AUDIT REPORT NO.
Revision 2 Page 8 of 8 I. Auditor's Report A. Audit Finding:
4 B. Recommended Corrective Action:
II. Project Response A. Proposed Corrective Action:
l I
B. Corrective Action Completi,on Date:
Project Manager Date 1
- - - _ - - _.