ML20076G184

From kanterella
Jump to navigation Jump to search
Rev 1 to ATP-5-Q, Procedure for Providing Project Orientation
ML20076G184
Person / Time
Site: Midland
Issue date: 01/28/1983
From:
MARK G. JONES ENGINEERING CONSULTANTS, INC.
To:
Shared Package
ML20076G013 List:
References
ATP-5-Q, NUDOCS 8306140566
Download: ML20076G184 (5)


Text

1_ ...u.

-........l

~b- -

i i

PROCEDURE FOR PROVIDING

& PROJECT ORIENTATION -

h A. .

A 9

k s

e %l R V

  • Y ADMINISTRATIVE TASK g jc i PROCEDURE NO: ATP-5-Q

> en .

! E t!

h REVISION NO: 1

% Y gy .*

DATE: January 28, 1983 l PAGE: 1 of 5

  • o D ./ E "2u G m

E x

gB1MEDE 010 PREPARED BY/DATE: #4- / '

/8

/ /

APPROVED BY/DATE: / *

/

b. ~

8306140566 830607 PDR ADOCK 05000 MARI G. JONES ENGINEERING CONSULTANTS, INC.

333 Hayes Street San Francisco, California 94102 L

. - - ~

ATP-5-Q Revision 1 Page 2 of 5 TABLE OF REVISIONS Revision 0, Date November 4, 1982 Original Issue.

Revision 1, Date January 28, 1983 Added new page 2. Table of Revisions; add new paragraph V Re quir ed Doc u m en ta ti on ; renumb er parag ra phs; added "Q" to procedure number.

W g

G l

I L... .

. t ATP-5-Q Revision 1 Page 3 of 5 PROCEDURE FOR PROVIDING PROJECT ORIENTATION I. SCOPE This procedure describes the steps to be followed for providing project orientation for the personnel working on quality related project tasks.

II. RESPONSIBILITY The project orientation shall be given by the Project Manager or his designee.

III. DEFINITIONS Quality related tas ks are th,se tasks that affect quality as de fine d in the MGJEC Q A Manual. T ho se task s are id entified by the P ro ject Manager and are listed in ATP-2, Procedure for Distributing Quality Related Procedures.

IV. PROCEDURE

. A. Provide or make available an information copy of any project procedures, manuals, descriptions or other project data.

The following points are discussed as appropriate:

1. Project objective
2. Documentation
3. General description of procedures
4. Project organization
5. Special client requirements B. Discuss project, requirements for documentation control on a general basis.

V. REQUIRED DOCUMENTATION A. Personnel Training Records (see Exhibit 1.0)

9 ATP-5-Q Revision 1 Page 4 of 5 VI. REFERENCES A. MGJEC Quality A su ra nc e Manual. (Revision 2, J an ua r y 12, 1983) 9 1

L

-o l

l l

k ___ _ _ _ _ _ _ . _ _

Sheet of

. . MARK G. JONES ENGINEERING CONSULTANT 5, INC. EXHIBIT 1.0 ATP-5-Q Revision 1 EMPLOYEE NAME PROJECT NO.

Fase 5 of 5 EMPLOYEE NO.

PERSONNEL TRAINING RECORD INSTRUCTIONS GIVEN RECEIVED

  • Description DATE BY BY

. o By initia11ing this column the employee acknowledges that he/she has received and understood the instructions for the items indicated.

__ - -_.