MONTHYEARML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20090L7491984-05-0404 May 1984 Rev 11 to Procedure 7220-C-230(Q), Tech Specs for Subcontract for Operating Onsite Batch Plant & Furnishing Concrete ML20090K7691984-05-0202 May 1984 Rev 6 to Procedure 7220-C-210, Tech Spec for Plant Foundation Excavation & Cooling Pond Dikes. Incomplete Rev 7 to Procedure 7220-C-211, Tech Spec for Backfill & Related Info,Including Spec Change Notices,Encl ML20090K7661984-05-0202 May 1984 Rev 7 to Procedure 7220-C-210, Tech Spec for Plant Foundation Excavation & Cooling Pond Dikes ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20076N1401983-07-15015 July 1983 Rept of Overhead Fluid Grouting Test Program ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20023D1331983-05-0505 May 1983 Evaluation of Pressures in Lines of Grouting Equipment - Crack Repair Borated Water Storage Tank Foundations. ML20081J6571983-04-12012 April 1983 Test Program Status & Rev 12 - Test Schedule ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl 1985-12-13
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20127N3891985-01-31031 January 1985 Rev 1 to Midland Energy Ctr Project Shutdown Plan ML20127N3941985-01-31031 January 1985 Rev 0 to Midland Energy Ctr,Surveillance & Maint Plan ML20092C8541984-06-15015 June 1984 Midland Idcvp Auxiliary Feedwater Sys Performance Requirements ML20090L7491984-05-0404 May 1984 Rev 11 to Procedure 7220-C-230(Q), Tech Specs for Subcontract for Operating Onsite Batch Plant & Furnishing Concrete ML20090K7691984-05-0202 May 1984 Rev 6 to Procedure 7220-C-210, Tech Spec for Plant Foundation Excavation & Cooling Pond Dikes. Incomplete Rev 7 to Procedure 7220-C-211, Tech Spec for Backfill & Related Info,Including Spec Change Notices,Encl ML20090K7661984-05-0202 May 1984 Rev 7 to Procedure 7220-C-210, Tech Spec for Plant Foundation Excavation & Cooling Pond Dikes ML20093D2131984-04-30030 April 1984 Rev 18 to Procedure RS-084-01, Interface Control for Interorganizational Processes ML20084E1701984-04-27027 April 1984 Instruction Manual for Model DSRV-12-4 Diesel Engine/ Generator,Midland Plants 1 & 2 ML20081C4031984-03-0707 March 1984 Plan to Conduct Independent Mgt Appraisal of Midland Nuclear Project ML20081A5991983-08-26026 August 1983 Rev 1 to Procedure ATP-12-Q, Procedure for Performing Calculations & Technical Studies ML20081A6141983-08-26026 August 1983 Rev 1 to Procedure 8301 WTP-4-Q, Procedure for Resolution of Spatial Sys Interaction Program/Seismic Postulated Interactions ML20081A6261983-08-26026 August 1983 Rev 1 to Procedure ATP-13-Q, Procedure for Preparation of Project Technical Repts ML20078K2941983-08-0505 August 1983 Rev 1 to Quality Control Instruction 15.01, Nonconformance Identification & Reporting ML20078K3061983-08-0505 August 1983 Rev 1 for third-party Const Implementation Overview Re QA Plan ML20078K2841983-08-0505 August 1983 Rev 1 to third-party Const Implementation Overview Approval ML20078K2781983-07-21021 July 1983 Rev 0 to Verification Attribute Checklist P-2.20V, Pipe Supports ML20024F6171983-07-15015 July 1983 Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program ML20024F6111983-07-15015 July 1983 Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program. ML20080A2521983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview Procedure ML20077D5271983-07-0505 July 1983 Rev 1 to Third-Party Const Implementation Overview ML20072L2411983-06-30030 June 1983 Offsite Dose Calculation Manual for Midland Plant ML20024C0941983-06-30030 June 1983 Core Damage Assessment Procedure Station 9918.1, Estimation of Extent of Core Damage ML20078K2701983-06-27027 June 1983 Rev 1 to Quality Control Instruction 10.01, Const Implementation Overview Assessment ML20024B6221983-06-27027 June 1983 Rev 1 to QC Instruction Qci 10.01, Const Implementation Overview Assessment ML20072J4781983-06-10010 June 1983 Rev 2 to Quality Verification Program ML20072J4681983-06-10010 June 1983 Rev 1 to Const Completion Program. Viewgraphs Encl ML20076G0401983-06-0606 June 1983 Rev 1 to Program Manual Spatial Sys Interaction Program/ Seismic Midland Energy Ctr ML20072A8501983-06-0303 June 1983 Const Completion Program ML20076G1211983-06-0101 June 1983 Rev 2 to 8301-WTP-3-Q, Procedure for Performing Walkdowns of Ssip/S Targets ML20076G2431983-06-0101 June 1983 Rev 2 to ATP-8-Q, Procedure for Control of Computer Programs ML20076G2211983-06-0101 June 1983 Rev 2 to ATP-7-Q, Procedure for Training Mgjec Audit Team Members ML20076G2041983-06-0101 June 1983 Rev 2 to ATP-6-Q, Procedure for Performing Internal QA Audits ML20076G1391983-06-0101 June 1983 Rev 3 to ATP-2-Q, Procedure for Distribution & Verifying Implementation of Quality Related Procedures ML20076G2591983-06-0101 June 1983 Rev 1 to ATP-10-Q, Procedure for Document Control ML20076G2671983-06-0101 June 1983 Rev 1 to ATP-11-Q, Procedure for Identification, Documentation & Corrective Action for Nonconformances ML20076G1061983-06-0101 June 1983 Rev 2 to 8301-WTP-2-Q, Procedure for Training of Ssip/S Walkdown Team Members ML20076G0941983-06-0101 June 1983 Rev 2 to 8301-WTP-1-Q, Procedure for Documentation of Postulated Interactions ML20076G0851983-06-0101 June 1983 Rev 2 to STD-1-Q, Qualifications of QA Audit Personnel ML20076G0671983-06-0101 June 1983 Rev 2 to 8301-PIP-1-Q, Procedure for Project Interface Control ML20072B2521983-06-0101 June 1983 Rev 2 to Field Instruction FIC-5.100, Excavation Permit Sys ML20076G1371983-05-26026 May 1983 Rev 2 to ATP-1-Q, Procedure for Control of Project Correspondence ML20076G2521983-05-26026 May 1983 Rev 1 to ATP-9-Q, 10CFR21-Procedure for Reporting of Defects & Noncompliance ML20023D5201983-05-18018 May 1983 Rev 2 to Engineering Program Plan Project Instruction PI-3201-009 Midland Independent Design & Const Verification Program,Project 3201. ML20071D6161983-03-0909 March 1983 Reactor Protection Sys Setpoint Methodology ML20071D6371983-03-0909 March 1983 Safety-Related Instrument Setpoint Methodology for Balance of Plant Equipment ML20072B2031983-02-0909 February 1983 Engineering Program Plan,Project Instruction PI-3201-009, Midland Independent Design & Const Verification Program, Project 3201. Corrected Pages Encl ML20071D9031983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Centrifugal Pump ML20071D9271983-02-0202 February 1983 Rev 1 to Reactor Bldg Spray Sys Hydrazine Addition Positive Displacement Pump ML20071D9361983-02-0202 February 1983 Rev 1 to Hydraulic Snubbers 1985-12-13
[Table view] |
Text
'
~
- f, PROCEDURE FOR PROVIDING ORIENTATION TO THE h
MGJEC QUALITY ASSURANCE PROGRAM p
7 N
Y M
l s
U ADMINISTRATIVE TASK PROCEDURE NO:
ATP-4-Q g
> 05
,E E
REVISION NO:
1 b
DATE:
January 28, 1983 g$
o PA GE:
1 of 5
[
R s
8 i
2 8
e m
PREPARED BY/DATE:
/
/ff[3 T-
/
APPROVED BY/DATE:
//
A
/ 2.@[O i
y EUE1ATION OH.Y
- MARK G.
JONES ENGINEERING CONSULTANTS, INC.
333 Hayes Street San Francisco, California 94102 M6188RJ888li; A
e
ATP-4-Q Revision 1 Page 2 of.5 TABLE OF REVISIONS Revision 0, Date November 4, 1982 Original Issue Revision 1, Date January 28, 1982 Add page 2, Table of Revisions; renumbered paragraphs; added "Q" to procedure number.
O e
0 W
e O
e S
i L.
ATP-4-Q Revision 1 Page 3 of 5 Procedure for Providing Orientation to the M GJ EC Quality Assurance Program.
I.
SCOPE This procedure provides a general description of the steps to be followed in providing orientation to the MGJEC Quality Assurance
,Ma nu al.
The orientation applies to all personnel w or king on quality related tasks.
II.
RESPONSIBILITIES The Pr oj ec t Manager or his d es ig n e e shall be responsible for providing this Quality Assuran ce orien ta tion to all employ ees involved in tasks that are quality related.
III.
DEFINITION Quality rela te d ta sk s - Those tasks that must conform to th e requirements of A p pe nd ix B of 10 CFR 50, "Qu alit y Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants",
and those defined by client requirements.
IV.
PROCEDURE A.
A controlled copy of the MGJEC Quality Assurance Manual shall be assigned or made available to the employee.
B.
The following items shall be discussed in the orientation:
1.
Project Or ga niz a tion (QA Manual paragraph 2.0) 2.
Inter face Control (QA Manual paragraph 5.0) 3.
Document Control (QA Manual paragraph 10.0) 4.
Audits (QA Manual paragraph 11.0) 5.
Training (QA Manual paragraph 2.3.5)
Design Control (QA 6.
Checking and verifying activities Manual par,agraph 3.0) 7.
Personnel training records C.
Provide time for the employee to read the entire manual.
D.
Review any questions that may arise.
L
ATP-4-Q Revision 1 Page 4 of 5 V.
REQUIRED DOCUMENTATION A.
The MGJEC personnel training record shall list the date of the orientation session.
(Exhibit-1.0)
V.
REFERENCE 1.
MGJEC Quality Assurance Manual.
(Revision 2, 1/12/83).
A w
f e
e g
.0
. MARK G. JONES ENGINEERING CONSULTANTS, INC.
Revision 1 Page 5 of 5 EMPLOYEE NAME PROJECT NO.
EMPLOYEE NO.
PERSONNEL TRAINING RECORD INSTRUCTIONS GIVEN RECEIVED
0 By 'initia11ing this column the employee acknowledges that he/she has received and understood the instructions for the items indicated
_