ML23146A101

From kanterella
Revision as of 13:11, 14 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary of May 25, 2023, Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Reduction of the Sites Exclusion Area Boundary
ML23146A101
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 05/31/2023
From: James Kim
Plant Licensing Branch 1
To: Carr E
Public Service Enterprise Group
Kim J
References
EPID L-2023-LRM-0033
Download: ML23146A101 (4)


Text

May 31, 2023

LICENSEE: PSEG Nuclear LLC

FACILITY: Hope Creek Generating Station Salem Nuclear Generating Station, Units 1 and 2

SUBJECT:

SUMMARY

OF MAY 25, 2023, PR E-SUBMITTAL PUBLIC MEETING WITH PSEG NUCLEAR LLC TO DISCUSS REDUCTION OF THE SITES EXCLUSION AREA BOUNDARY (EPID L-2023-LRM-0033)

On May 25, 2023, an observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of PSEG Nuclear LLC (PSEG or the licensee) by teleconference. The purpose of the meet ing was to discuss PSEGs intended license amendment request (LAR) submittal to r educe the Hope Creek Generating Station (Hope Creek) and Salem Nuclear Generating Station, Units 1 and 2 (Salem), Exclusion Area Boundary (EAB) in support of Wind Port. The meeting notice and agenda, dated May 10, 2023, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML23130A181. A list of attendees is enclosed.

The licensee presented information from the slides contained in ML23144A007 to provide an overview of New Jersey Wind Port Project, the purpose for reducing EAB, accident dose analyses to justify EAB reduction, support ing technical analyses, modified EAB and LAR technical evaluation.

During the meeting, the NRC staff asked how the iodine partition coefficient increased from 1 to 100 for modeling of radioactivity in bulk water since the last Alternative Source Term evaluation for Hope Creek and Salem was done in 2005 or 2006 time frame. PSEG staff explained the change from 1 to 100 in iodine partition coefficient was previously performed under Title 10 of the Code of Federal Regulations 50.59 for primary to secondary leakage in the intact steam generators consistent with Regulatory Guide 1.183.

The NRC staff recommended that the most lim iting dose analysis calculation should be made available in a reading room for review. Also, the NRC staff suggested a table of current analysis of record input and parameters along with the methodology changes in loss-of-coolant accident dose consequence analysis should be provided in the LAR.

There were no comments from members of the public. No public meeting feedback forms were received.

Please direct any inquiries to me at (301) 415-4125 or email James.Kim@nrc.gov.

/RA/

James S. Kim, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket Nos. 50-354, 50-272, and 50-311

Enclosure:

List of Attendees

cc: Listserv

LIST OF ATTENDEES

MAY 25, 2023, PRE-SUBMITTAL PUBLIC MEETING WITH PSEG NUCLEAR LLC

TO DISCUSS REDUCTION OF THE SITES EXCLUSION AREA BOUNDARY

HOPE CREEK GENERATING STATION AND

SALEM NUCLEAR GENERATING STATION UNITS 1 AND 2

ATTENDEES ORGANIZATION Elijah Dickson U.S. Nuclear Regulatory Commission (NRC)

David Garmon NRC Sean Meighan NRC Michael Norris NRC Jeffrey Herrera NRC Neil Sheehan NRC James Kim NRC Jamie Mallon PSEG Nuclear LLC (PSEG)

David Mannai PSEG Jason Jennings PSEG Richard Montgomery PSEG Michael Wiwel PSEG Paul Duke PSEG Coley Chappell PSEG Emily Bauer PSEG Philip Quick PSEG Rick Heathwaite PSEG Steve Barr PSEG Craig Stewart PSEG Elizabeth Chalfant Sargent & Lundy David Gennardo Sargent & Lundy

Enclosure

ML23146A101 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME JKim KEntz HGonzalez JKim DATE 5/30/2023 5/26/2023 5/31/2023 5/31/2023