|
---|
Category:Environmental Monitoring Report
MONTHYEARML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24036A1852024-02-0505 February 2024 Correction to 2022 Annual Radioactive Effluent Release Report - Report 46 ML23116A0352023-04-24024 April 2023 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radiological Effluent Release Report 65 (January 1, 2022 Through December 31, 2022) ML22133A0682022-05-13013 May 2022 Independent Spent Fuel Storage Installation (ISFSI) - Independent Spent Fuel Storage Installation (ISFSI) ML22118A5502022-04-28028 April 2022 Annual Environmental Operating Report 2021 ML22116A2602022-04-26026 April 2022 2021 Annual Radiological Environmental Operating Report ML22115A2652022-04-25025 April 2022 2021 Annual Radioactive Effluent Release Report - Report 45 ML22112A1052022-04-22022 April 2022 Annual Radioactive Effluent Release Report 64 ML21190A1462021-07-0808 July 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report for June 8, 2020 to June 7, 2021 ML21118A8782021-04-29029 April 2021 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report 63 January 1, 2020 Through December 31, 2020 ML21119A2932021-04-29029 April 2021 2020 Annual Radioactive Effluent Release Report - Report 44 ML21118A8202021-04-28028 April 2021 2020 Annual Radiological Environmental Operating Report ML21116A1992021-04-23023 April 2021 Annual Environmental Operating Report for 2020 ML20118D0732020-04-26026 April 2020 2019 Annual Radiological Environmental Operating Report ML20118D1302020-04-26026 April 2020 Annual Environmental Operating Report 2019 ML19154A5802019-05-31031 May 2019 Annual Radiological Environmental Operating Report ML19156A0572019-05-23023 May 2019 Correction to Wolf Creek Generating Station 2017 Annual Radioactive Effluent Release Report - Report 41 ML19126A0862019-04-30030 April 2019 Transmittal of 2018 Annual Radioactive Effluent Release Report - Report 42 ML19123A0982019-04-29029 April 2019 (WCGS) - 2018 Annual Radiological Environmental Operating Report ML19119A0582019-04-26026 April 2019 Annual Radioactive Effluent Release Report 61 January 1, 2018 Through December 31, 2018 and Independent Spent Fuel Storage Installation ML18152A8692018-05-31031 May 2018 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radiological Environmental Operating Report 75 January 1, 2017 Through December 31, 2017 ML18122A1752018-04-25025 April 2018 (WCGS) - 2017 Annual Radiological Environmental Operating Report ML18121A1352018-04-25025 April 2018 Submittal of 2017 Annual Radioactive Effluent Release Report - Report 41 ML18123A3472018-04-24024 April 2018 Annual Environmental Operating Report 2017 ML17125A1962017-04-28028 April 2017 Submittal of Annual Radioactive Effluent Release Report 59, January 1, 2016 Through December 31, 2016 ML17121A4202017-04-25025 April 2017 Submittal of 2016 Annual Radioactive Effluent Release Report - Report 40 ML17121A0372017-04-24024 April 2017 Submittal of 2016 Annual Radiological Environmental Operating Report ML17121A3772017-04-24024 April 2017 Annual Environmental Operating Report 2016 ML19007A3312017-02-28028 February 2017 Final Report for Post-EPU Thermal and Biological Monitoring ML16153A1902016-05-31031 May 2016 Annual Radiological Groundwater Protection Program Report 1 January 2015 Through 31 December 2015 ML16153A1892016-05-27027 May 2016 Annual Radiological Environmental Operating Report No. 73; January 1, 2015 Through December 31, 2015 ML16126A3712016-04-29029 April 2016 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Annual Radioactive Effluent Release Report 58 January 1, 2015 Through December 31, 2015 ML16126A2392016-04-28028 April 2016 2015 Annual Radioactive Effluent Release Report-Report 39 ML16120A5222016-04-25025 April 2016 Transmittal of 2015 Annual Radiological Environmental Operating Report ML16120A5212016-04-21021 April 2016 Transmittal of 2015 Annual Environmental Operating Report ML15154A5132015-05-29029 May 2015 Annual Radiological Environmental Operating Report 72, January 1, 2014 Through December 31, 2014 ML15121A7202015-04-29029 April 2015 ISFSI - Annual Radioactive Effluent Release Report No. 57, January 1, 2014 Through December 31, 2014 ML15128A1572015-04-27027 April 2015 2014 Annual Radioactive Effluent Release Report - Report 38 ML15124A4302015-04-23023 April 2015 Annual Radiological Environmental Operating Report for the Period of January 1, 2014, Through December 31, 2014 ML15107A0812015-04-0606 April 2015 Submittal of Annual Environmental Operating Report 2014 ML14188C0762014-06-25025 June 2014 Correction to Wolf Creek Generating Station 2012 Annual Radioactive Effluent Release Report - Report 36 ML14126A0102014-04-25025 April 2014 Annual Environmental Operating Report ML14119A1052014-04-23023 April 2014 Submittal of 2013 Annual Radiological Environmental Operating Report ML13262A2842013-09-12012 September 2013 Corrections to Wolf Creek Generating Station, Annual Radioactive Effluent Release Report - Reports 28 Through 35 ML13225A0092013-08-0707 August 2013 Correction to 2012 Annual Radioactive Effluent Release Report 36 ML13155A0032013-05-30030 May 2013 Annual Radiological Environmental Operating Report 70, January 1, 2012 Through December 31, 2012 2024-06-26
[Table view] Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 IR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement 2024-09-06
[Table view] |
Text
Dustin T. Hamman Director Nuclear and Regulatory Affairs
June 26, 2024 000 519
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Reference:
Letter 000457 (NRC ADAMS No. ML24118A003), Wolf Creek Generating Station 2023 Annual Radioactive Effluent Release Report - Report 47,
dated April 27, 2024, from D. T. Hamman, WCNOC, to USNRC
Subject:
Docket No. 50-482 and 72-79: Correction to 202 3 Annual Radioactive Effluent Release Report - Report 47
Commissioners and Staff:
The reference submitted the Wolf Creek Generating Station Annual Radioactive Effluent Release Report - 47, for the period of January 1 to December 31 of 2023. Subsequent to the submittal of this report, the table in Section VI.C (page 6) Dose to a Member of the Public from Activities Inside the Site Boundary was updated. The total dose value for the last row ISFSI Dry Cask South (at nuisance fence on south side) was reduced from the initially reported value of 1.01E+02 mrem (101 mrem) to the new value of 2.51E+01 mrem (25.1 mrem).
The reduction in dose leading to a revision of the report was identified and documented in the Wolf Creek Generating Station corrective action program under condition report 10033834.
The enclosure to this letter includes two updated pages. The first is an updated title page reflecting Revision 1 of the 2023 Report No. 47. The second is an updated page 6 which contains the corrected dose value within the table as described above.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.
Sincerely,
Dustin T. Hamman
DTH/ jkt
P.O. Box 411 l Burlington, KS 66839 l 620-364-8831 000519 Page 2 of 2
Enclosure:
Updated Title Page and Corrected Page 6 of Letter 000457 (NRC ADAMS ML24118A003), Wolf Creek Generating Station 2023 Annual Radioactive Effluent Release Report - Report 47
cc: S. S. Lee (NRC), w/e J. D. Monninger (NRC), w/e G. E. Werner (NRC), w/e Senior Resident Inspector (NRC), w/e WC Licensing Correspondence, RA 24-000 519, w/e
Enclosure to 000519
Enclosure:
Updated Title Page and Corrected P age 6 of Letter 000457 (NRC ADAMS ML24118A003), Wolf Creek Generating Station 2023 Annual Radioactive Effluent Release Report - Report 47
(3 pages including this page)
WOLF CREEK NUCLEAR
OPERATING CORPORATION
2023 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT
Wolf Creek Generating Station
Docket Numbers 50-482 and 72-79 Renewed Facility Operating License NPF-42 Report Number 47, Rev 1 Records Decommissioning File - RRS ID 05C.100
C. Dose to a Member of the Public from Activities Inside the Site Boundary Total Dose Personnel making deliveries to the plant 2.22E-01 mrem Public use of the cooling lake during times when fishing was 2.86E-02 mrem allowed Workers at the William Allen White Building located outside the 4.80E-03 mrem protected area boundary Pipe Fab Shop (nearest occupied building)
- 6.62E+00 mrem ISFSI Dry Cask East (at ISFSI RCA fence on east side)
- 1.44E+01 mrem ISFSI Dry Cask South (at ISFSI RCA fence on south side)
- 8.45E+01 mrem ISFSI Dry Cask South (at nuisance fence on south side) ** 2.51E+01 mrem
The plant delivery calculations were based on deliveries being made 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> per week for 50 weeks per year. The dose to anglers on the lake was based upon 3,600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> a day for 300 days, based on the number of days that the lake was open to anglers).
The William Allen White Building occupancy was based on normal working hours of 2,000 per year. The Submersion, Inhalation and Ground Plane pathway doses were added to derive the total dose. All calculations were performed in accordance with the methodology and parameters in the ODCM.
- The Radiation Protection (RP) department monitors various locations and buildings in the vicinity of the ISFSI area to verify exposure is within regulatory limits in addition to the monitoring done by REMP. The calculated doses here are based on a conservative 2,000 working hours per year and do not subtract off background readings.
- This fence is designed to delay any potential entry into the Dry Cask Area. It is identified as the nuisance fence on the south side of the storage area.
VII. METEOROLOGICAL DATA Appendix B documents WCGS meteorological data for wind speed, wind direction and atmospheric stability.
2023 Annual Radioactive Effluent Release Report