ML20056B386

From kanterella
Revision as of 09:25, 13 November 2023 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Rev 2 to Code Control Program Section 12, Activities in Support of N-5 Review & Processing
ML20056B386
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 08/13/1990
From:
EBASCO SERVICES, INC.
To:
Shared Package
ML20056B375 List:
References
PROC-900813-07, NUDOCS 9008280207
Download: ML20056B386 (3)


Text

- - - ._ . . ._ .

' COMANCHE PEAK STEAM ELECTRIC STATION I

UNIT 2 l CODE CONTROL PROGRAM ASME Ill DMSION 1  : 'E

, .' WELECTRIC l s

SECTION: SECTION TITLE: REVISION: 2

, ,g 12 avant AND lannNDE PAGE _1 OF _3 PREPARED BY: SUPERSEDES: DATE:

g C. T. Anderson IIRVISIG4: 1 08/13/90 ,

APPROVAL: CONCURRENCE:

, . 0 EBASCO, DIRECT 0YQUALITYASSURANCE kOCliA TU ELECTRIC, CHIEF UGINEER h f>1 ann &

an. 1lwftc 5BASC0, PROJECT QUAlhSURANCE TU ELECTRIC, DIREfi0h Q' AL'ITY U ASSURANCE PROGRAM MANAGER 's ./

o . .

THIS SECTION ACCEPTED BY EBASCO AUTHORIZED INSPECTION AGENCY:

i

]u$v 2 *t bc.

AUTHORIZED SIGNATURE MTE y@[2gg{@[ Ni C A

e E . COMANCHE PEAK STEAM ELECTRIC STATION L .J

^

UNIT 2 nn ,

+ -

CODE CONTROL PROGRAM - =

"m m - -

ASME Ill DMSiON-1 3 S ta1T l SECTION: SECTION TITLE: REVISION: 2 ACflVITIES IN SURCRT OF N-5 12 REVIEW ADO PF# MING PAGE 2._ OF 3._

1.0 GNIRAi, 1.1 %e M ject eumlity Assurance Pi % Manager (P9UM) ahall assure, through verification activities ard documentation reviews

!- to the extmit deemed recessary, the completanssa and accuracy of the Installe1 's N-5 Code Data Report in mooortlanoe with this Section.

1.2 h PGAPM shall establish a file in mooornrice with Section 7 - of this Phnual for all Code control Group WF documumtatim and a method to assure that all COG activities hsw been ogleted and doo mented.

2.0 N-5 REVIEW 2.1 h PQMN shall verify that the following activities have been

l. satisfactorily conqpleted when an N-5 Code Data Report is
submitted for signature

2.1.1 All engineering and design activity for the system has been ocepleted including:

Design Specification updating.

Nonaanforsumoe Report (s) (NOR), Deficiency Report (s)-

(IR) . and Design Qiange Authorisation(s) (DCA) processing.

Final stress rimoonciliation for as-built conditions.

2.1.2 Fabrication and installation activities requiring confirmation for syntan including:

Pressure tasting.

As-built confinnation (see *x: tion 11 of this Manual).

Final documentation reviews (see Section 11 of this Manual).

2.1.3 000 activities requiring confirmation for the system including:

Ehgineering/ design surveillance and reviews (see Section 6 of this Manual).

Fema maa

COMANCHE PEAK STEAM ELECTRIC-STATION

' UNIT 2 i EM C@E CONTROL PROGRAM g d ASME lil DMSION 1 Etucm!T SECTION: SECTION TITLE:

REVISION: 2 ACf1VITIES IN RNTGl? 0F N-5 12 asmet AND IgnryWIING PAGE.1.'OF.2_

Installer surveillances and reviews (see Sectim 8 of this Munal).

1 Firal doctmentatim reviews ( see Section 11- of this I Phnual) . .

N-5 Code Data Report reviews includirs verification that N-5 entries are ocuplete, accurate and erw p===

all work and Code itmas within the N-5 bomdary.

2.2 h twoulta of 000 Surveillanose/ overviews conchaoted in l acoordanoe with this Section, including mentisfactory conditions, shall be documented on a Surveillance Report, Ruhibit l ,y t

15.6 and controlled in accordance with 000 'Pav.)ect Pranarhass. '

maatisfactory concinions identified by 000_ ahall be assigned for-resolution by the responsible organisation in accordance with

! establiebed Comanche Peak Stmas Electric Station (@SES) pav=rknes. If at the time of Surveillance Report issunnoe - an '

l mentisfactory candition is not twoolved by the responsible organisation in a manner acceptable to the - 000,- the 000 shall '

initiate, as appropriate,. a Surveillance Observation Form-(SOF),

Exhibit 15.6 and/or a W Rvaluation (WE) Form in nocordance with Section 9 of this Marmal. ,

l 3.0 N-5 FINAL, penmutDC 3.1 k m the - ry review of the N-5 Code Data Report 'and supporting verifications of 000 activities are oogdete, the I

14 MIN ahall process the N-5 for the approprir.te Piping Syst m Designer's signature.

l 3.2 After obtaining the Piping System Designer's signature, the 14MIM ahall sign and date the N-5 Compliance Statammt Exhibit 15.8 as the Owner's Agent and obtain the 000 ANI's signature and date for the AIA's monitoring activities.

I 3.3 h completed N-5 Code Data Report shall be formrded to the perunnent plant files and copies shall be distributed to the organimations signire the N-5, to W Electric and to others in acocedance with implementing pav =rbres. 'Ibe 54EIN shall maintain a copy of the N-5 Code Data Report with all attachments.

mum man

-, .- .. - . - - - . .- - - . __ _ _ _ - _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ . _ _ _ _ _