MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
._ . ..- _- . . - - - . - . . -. . . . - - .
COMANCHE PEAK STEAM ELECTRIC STATION
. UNIT 2 CODE CONTROL PROGRAM .
EBASCO ASME Ill DMSION 1
- - =
=
TIELECTMC SECTION: SECTION TITLE: REVISION: 2 1 2 nrurr puerimAL caoAw12Arim 1
PAGE L OF L PREPARED BY: SUPERSEDES: DATE:
C. T. Anderson IRV1815 : 1 APPROVAL:
CONCURRENCE:
EBASCO DIRECTOR TUAtlTY ASSURANCE bbbb M TU ELECTRIC, CHIE i ENGINEER (l
/ bahj up 7/2t[tt EBASCO. PROJECT QUALIT[A/hRANCE TU ELECTRIC, DikEchR QUALITY ASSURANCE PROGRAM MANAGER THIS SECTION ACCEPTED BY EBASCO AUTHORIZED INSPECTION AGENCY:
Julyt7 Tr.
AUTHORIZED S10 NATURE DATE
, {gge2gggg4(zggg 6
. - , , ,,-.-,,..,.-n~ , ,,---e.,.,.,n ,-.,r.-- . - , - - - , , - , , , -.n.n_., . - -.n . , - ,
COMANCNE PEAK STEAM ELECTRIC STATION ;
UNIT 2 CODE CONTROL PROGRAM = $
ASME lil DMSiON 1 T8uwI l SECTION: SECTION TITLE: REVISION: 2 p~, 2 anycr FucrimAL agawlzArlm PAGE.2, op,1, >
i l 1.0 WNERAL 1he pinpose of this section is to irullanta how Cm anche peak Staen Klectric Staticm !CHEB) orgartimatims perfornirs Code-related :
activities are ftsettarmily orgardnad in relation to the Code Control l Orcup (CDU) overview and oc fnation responsibilities. :
4 i
l
~ 2.1 Stane & Webster Ergineerire corpormtlan (5WEC), as the Project Syntama traineering omtreetor, has been designated as the Erwinneriss Orsartiantim (Ref.: Alps Code Section III. Table NA 3120-1, Itan 7a) responsible for the oversll implementation and annasement of orgineerire activities required to support the certification of CPSBB thit 2 N-5 Code Data Reporta. SM is i
respmmible for oertifying the Pipire Desian Specificaties and sisrting W-6 Code Data Reporta as the Pipirs System Designer for Code Class 2 mrul 3 syntamm. In adriitim, NE is responsible '
for verifring equipmumt qualifi::2t! ;. to the Design Specificatiari . oritaria for oude class 2 and 3 avnTr=iants not furnished ly Westinghouse. teum piping-iruhmad landing omditican amoned original campcmmt qualifications, se is
- respcasible for resolving thane inoonsistancies.
2.2 Westinghouse Electric Oc. w .. tion (WE), as the Project NBSS [
i Engineering Contractor, has bem designated the tagineering ;
Orsartimation (Ref.: AfDB code Section III. Thble NA 3130-1, Itan 7a) respansible for desian and analysis of Class 1 piping systmas and Class 1 equipment supporta e GM thit 2.
j E is i
respannible for perfornirs engineering, design and stress l analysis of all pipire and pipe angports within the Code class 1 '
l strees problan bandaries, generation of the Strees Reporta for the Class 1 piping systmms and certifiontian of the Class I syntana N-6 Code Data Reporta as Piping System Designer. As a i mgplier of Code Class 1, 2, and 3 ocuponents and tw=Tr=umt
' supports. E is also respcasible for the qtalification of
- tha= a=rrwumta and tw=Tr=nent supports to the 1Minvr and evirtsummtal ocmditions defined in the Desian specifiantions. ?
m.na.
COMANCHE PEAK STEAM ELECTRIC STATION 4 UNIT 2 I Em CooE cowtRot PaocaAW =
ASWE Ill DMSloN 1 hucwT ;
SECTION:
4 SECTION TITLE: REVISION: : I 2 m:pwr sucriant (nowizATIos PAGE_A OF.L 4
2.3 medtel Corpontia (BBC), as the Project pipe 8tmas and ap (P548) kgineerirs contmeter, is responsible for :
perfaming enginmaring, desiga and stress memlysia of all piping i and pipe apports within the node Class 2 and 3 stmas greblem '
bowidsries. In additie, IE is mapansible far certifying the Pipe SW Design Specificaticsis. '
e 2.4 Impell Corporatim (IM) _ as the Projaot Civil /Stasotarmi i
twinnering Contracter, is respesible for idsstifying antamal l landinpa an Onde Class 2 and 3 systas/<==yn==ta chas to '
postadated in-plant hmmands (ie., hid amargy line breaks, modersta energy line breaks, and meismic/non-eeismic '
intaractions). IM is also responsible for verification of El versting qualifications of ASE III <==pa==ta for pipias-ima==d anchenical landiran, for verification of meimmic design ahta, and verificatie of ladiding etnactaarmi adespancy wider a: stas-l irar=d landinem at N-6 systan juriadictianal hr==dary loontians. ,
! 2.5 TU Electric Design higineering Organisation (IE) is responsible for verifying ndiation arme ocuiditions used as input for the qualification of ASE III syntams/aeponenta and for establishing radiati m evaditions for piping systamm outside of the ocatninment ind1 ding.
i 2.6 Brum & hoot (5t) as the site ASE M4 and Wf certifiesta Holder for GEEl thit 2 is rumsp esible for - the procurement, receipt.
ir.spection, field fatrientim, inswatim, and final inspectie I of code tw=pr==ta and campesimmt supporta including piping systam gewasume tasting in acoordance with its Sality Assurance (GM) '
t Program.
2.7 W Ilactric is the owner and as sus is responsible for the coordination of activities an the G4EB project. 000 interfaces with the ower for the following hay activities:
Establishmsat of system griacities te ocupletim and certificatim.
Osnaration of overall N-6 schechde.
Coordinatie with the ' Deans Department of Licensing and Regulatian (1 tut) and the Nuolaar Regulatory commissian (MC).
Fame est
. COWANCHE PEAK STEAM ELECTRIC STA110N 1 UNIT 2 M CODE CONTROL PROGRAW l
1 ASME lil DMSION 1 Wn.semic 1
! i SECTION: SECTION TITLE: 8 REVISION: i 1 :
3EUK'T MBCf! GEL GEMBf12ATIm j PAGE.__4 OF__4 Perrforunnae of Omar's zwiew of Stress Reporta. ;
Certifiantian and imamanna of the N-3 Code Data Report.
j!
q 3.0 031B OCDim00 rame ACTIVITran .
1 3.1 3313 % '
i 3.1.1 'IU 21actrio has designated BMKD as the Dunar's Agent I j
! as defined in AfDs Section III for oveeview and I ooordination of Code activities at GW thit 2 (Ref.: I AfDE Code Section III, hhle NA 3120-1 Itan 13, pootnote '
7). 'Ibe purpose of this designatim is to estahlimb a single organimation to overview and coordiante the .
mitiple organisations involved in the Code certification l 1
4 3rnname and provide an additi m al level of amourance that all parties meet Project Code o m mitments using omtrol nonsures dich provide sufficient revious, j surveillances, verificaticais, sam 11ta and enlaotad overview inspections. i l l 3.1.. ! EBA800 has establiabad the Code control (kagi (GB) dich l l
is organised as =hr== in tukibit 16.3 to acomplish this j task as defined in the 'IU Elaet.rio dootsant " Soape of j Wortr for Ch-eita Services thit 2 code Omstrul Pregram". t l
l
'the 000 will interface with unaltiple arpi ==tions j involved with Code want te aco W ish the -=y !
overview and coordination. '
J 3.2 000 PKuner DerurAm Am MacrIr=as rur'_"Iv_' rim l
'this overview and ca.m11mation przgrum requires 000 interfaces I with the other GM assaniantians dich results in a fianotional l arseniantion as abaisi in Rubibit 15.3. ,
3.3 IEIK3sIBILrtY 3.3.1 'the Project ENality Assurance Pregrum Manneur (RMI98) far Otn '
activities is rumpansible for implementatie of these overview and cooediantian activities.
3.3.2 In the parfatunnae of 000 m,t.ivities, the RMI90 may requnst the support of EE900 Oorporate office personnel.
- j t
n= ==
l I
,___._____m - _
__ _ . _ _ _ . . _ _ _ _ _ _ _ . , _ _ _ . _ . _ _ _ _ _ _ _ _ . . . . _ . _ - - _ _ _ _ _ _ .