COMANCHE PEAK STEAM ELECTRIC STATION UNIT 2 CODE CONTROL PROGRAM EBASCO

.=

ASME Ill DMSION 1

=

TIELECTMC SECTION:

SECTION TITLE:

REVISION: 2 1

1 2

nrurr puerimAL caoAw12Arim PAGE L OF L PREPARED BY:

SUPERSEDES:

DATE:

C. T. Anderson IRV1815 :

1 APPROVAL:

CONCURRENCE:

bbbb M

EBASCO DIRECTOR TUAtlTY ASSURANCE TU ELECTRIC, CHIE i ENGINEER (l

/

bahj 7/2t[tt up EBASCO. PROJECT QUALIT[A/hRANCE TU ELECTRIC, DikEchR QUALITY ASSURANCE PROGRAM MANAGER THIS SECTION ACCEPTED BY EBASCO AUTHORIZED INSPECTION AGENCY:

Julyt7 Tr.

AUTHORIZED S10 NATURE DATE

{gge2gggg4(zggg 6

,,-.-,,..,.-n~

,,---e.,.,.,n

,-.,r.--. -, - - -,,

-.n.n_.,. -

-.n

COMANCNE PEAK STEAM ELECTRIC STATION UNIT 2 CODE CONTROL PROGRAM

=

ASME lil DMSiON 1 T8uwI l

SECTION:

SECTION TITLE:

REVISION: 2 p~,

2 anycr FucrimAL agawlzArlm PAGE.2, op,1, i

l 1.0 WNERAL 1he pinpose of this section is to irullanta how Cm anche peak Staen Klectric Staticm

!CHEB) orgartimatims perfornirs Code-related activities are ftsettarmily orgardnad in relation to the Code Control l

Orcup (CDU) overview and oc fnation responsibilities.

4 i

l 2.1 Stane & Webster Ergineerire corpormtlan (5WEC),

as the Project

~

Syntama traineering omtreetor, has been designated as the Erwinneriss Orsartiantim (Ref.: Alps Code Section III. Table NA 3120-1, Itan 7a) responsible for the oversll implementation and annasement of orgineerire activities required to support the certification of CPSBB thit 2 N-5 Code Data Reporta.

SM is i

respmmible for oertifying the Pipire Desian Specificaties and sisrting W-6 Code Data Reporta as the Pipirs System Designer for Code Class 2 mrul 3 syntamm.

In adriitim, NE is responsible for verifring equipmumt qualifi::2t!

to the Design Specificatiari. oritaria for oude class 2 and 3 avnTr=iants not furnished ly Westinghouse.

teum piping-iruhmad landing omditican amoned original campcmmt qualifications, se is respcasible for resolving thane inoonsistancies.

2.2 Westinghouse Electric Oc. w.. tion (WE), as the Project NBSS

[

Engineering Contractor, has bem designated the tagineering i

Orsartimation (Ref.: AfDB code Section III. Thble NA 3130-1, Itan 7a) respansible for desian and analysis of Class 1 piping systmas j

and Class 1 equipment supporta e GM thit 2.

E is i

respannible for perfornirs engineering, design and stress l

analysis of all pipire and pipe angports within the Code class 1 l

strees problan bandaries, generation of the Strees Reporta for the Class 1 piping systmms and certifiontian of the Class I syntana N-6 Code Data Reporta as Piping System Designer.

As a i

mgplier of Code Class 1, 2, and 3 ocuponents and tw=Tr=umt supports. E is also respcasible for the qtalification of tha= a=rrwumta and tw=Tr=nent supports to the 1Minvr and evirtsummtal ocmditions defined in the Desian specifiantions.

?

m.na.

COMANCHE PEAK STEAM ELECTRIC STATION UNIT 2 I

4 Em CooE cowtRot PaocaAW

=

ASWE Ill DMSloN 1 hucwT SECTION:

SECTION TITLE:

REVISION:

I 4

2 m:pwr sucriant (nowizATIos PAGE_A OF.L 4

2.3 medtel Corpontia (BBC), as the Project pipe 8tmas and ap (P548) kgineerirs contmeter, is responsible for perfaming enginmaring, desiga and stress memlysia of all piping i

and pipe apports within the node Class 2 and 3 stmas greblem bowidsries. In additie, IE is mapansible far certifying the Pipe SW Design Specificaticsis.

e 2.4 Impell Corporatim (IM) _

as the Projaot Civil /Stasotarmi i

twinnering Contracter, is respesible for idsstifying antamal l

landinpa an Onde Class 2 and 3 systas/<==yn==ta chas to postadated in-plant hmmands (ie.,

hid amargy line breaks, modersta energy line

breaks, and meismic/non-eeismic intaractions).

IM is also responsible for verification of El versting qualifications of ASE III <==pa==ta for pipias-ima==d anchenical landiran, for verification of meimmic design ahta, and verificatie of ladiding etnactaarmi adespancy wider a: stas-l irar=d landinem at N-6 systan juriadictianal hr==dary loontians.

2.5 TU Electric Design higineering Organisation (IE) is responsible for verifying ndiation arme ocuiditions used as input for the qualification of ASE III syntams/aeponenta and for establishing radiati m evaditions for piping systamm outside of the ocatninment ind1 ding.

i 2.6 Brum & hoot (5t) as the site ASE M4 and Wf certifiesta Holder for GEEl thit 2 is rumsp esible for - the procurement, receipt.

ir.spection, field fatrientim, inswatim, and final inspectie I

of code tw=pr==ta and campesimmt supporta including piping systam gewasume tasting in acoordance with its Sality Assurance (GM) '

t Program.

2.7 W Ilactric is the owner and as sus is responsible for the coordination of activities an the G4EB project. 000 interfaces with the ower for the following hay activities:

Establishmsat of system griacities te ocupletim and certificatim.

Osnaration of overall N-6 schechde.

Coordinatie with the ' Deans Department of Licensing and Regulatian (1 tut) and the Nuolaar Regulatory commissian (MC).

Fame est

COWANCHE PEAK STEAM ELECTRIC STA110N 1

UNIT 2 l

M CODE CONTROL PROGRAW ASME lil DMSION 1 Wn.semic 1

i SECTION:

SECTION TITLE:

REVISION:

8 1

3EUK'T MBCf! GEL GEMBf12ATIm PAGE.__4 OF__4 j

Perrforunnae of Omar's zwiew of Stress Reporta.

Certifiantian and imamanna of the N-3 Code Data Report.

j 3.0 031B OCDim00 rame ACTIVITran q

3.1 3313 %

i 3.1.1 'IU 21actrio has designated BMKD as the Dunar's Agent j

I as defined in AfDsSection III for oveeview and I

ooordination of Code activities at GW thit 2 (Ref.:

I AfDE Code Section III, hhle NA 3120-1 Itan 13, pootnote 7).

'Ibe purpose of this designatim is to estahlimb a single organimation to overview and coordiante the mitiple organisations involved in the Code certification 1

4 3rnname and provide an additi m al level of amourance that all parties meet Project Code o m mitments using omtrol nonsures dich provide sufficient

revious, j

surveillances, verificaticais, sam 11ta and enlaotad overview inspections.

i l

l 3.1.. ! EBA800 has establiabad the Code control (kagi (GB) dich is organised as =hr== in tukibit 16.3 to acomplish this j

l task as defined in the 'IU Elaet.rio dootsant " Soape of j

Wortr for Ch-eita Services thit 2 code Omstrul Pregram".

t l

'the 000 will interface with unaltiple arpi==tions j

l involved with Code want te aco W ish the

-=y overview and coordination.

J 3.2 000 PKuner DerurAm Am MacrIr=as rur'_"Iv_' rim

'this overview and ca.m11mation przgrum requires 000 interfaces I

with the other GM assaniantians dich results in a fianotional arseniantion as abaisi in Rubibit 15.3.

3.3 IEIK3sIBILrtY 3.3.1 'the Project ENality Assurance Pregrum Manneur (RMI98) far Otn activities is rumpansible for implementatie of these overview and cooediantian activities.

3.3.2 In the parfatunnae of 000 m,t.ivities, the RMI90 may requnst the support of EE900 Oorporate office personnel.