' COMANCHE PEAK STEAM ELECTRIC STATION UNIT 2 CODE CONTROL PROGRAM ASME Ill DMSION 1

'E WELECTRIC s

SECTION:

SECTION TITLE:

REVISION:

2

,g 12 avant AND lannNDE PAGE _1 OF

_3 PREPARED BY:

SUPERSEDES:

DATE:

08/13/90 C. T. Anderson IIRVISIG4: 1 g

APPROVAL:

CONCURRENCE:

0 kOCliA EBASCO, DIRECT 0YQUALITYASSURANCE TU ELECTRIC, CHIEF UGINEER h f>1 ann &

1lwftc an.

5BASC0, PROJECT QUAlhSURANCE TU ELECTRIC, DIREfi0h Q' AL'ITY ASSURANCE U

PROGRAM MANAGER

's./

o.

THIS SECTION ACCEPTED BY EBASCO AUTHORIZED INSPECTION AGENCY:

i

]u$v 2 *t bc.

AUTHORIZED SIGNATURE MTE y@[2gg{@[ Ni C

A

E

. COMANCHE PEAK STEAM ELECTRIC STATION eL.J UNIT 2

^

nn

+

CODE CONTROL PROGRAM

=

"m m

ASME Ill DMSiON-1 3 S ta1T l

SECTION:

SECTION TITLE:

REVISION:

2 ACflVITIES IN SURCRT OF N-5 12 REVIEW ADO PF# MING PAGE 2._ OF 3._

1.0 GNIRAi, 1.1 %e M ject eumlity Assurance Pi % Manager (P9UM) ahall assure, through verification activities ard documentation reviews to the extmit deemed recessary, the completanssa and accuracy of the Installe1 's N-5 Code Data Report in mooortlanoe with this Section.

1.2 h PGAPM shall establish a file in mooornrice with Section 7 - of this Phnual for all Code control Group WF documumtatim and a method to assure that all COG activities hsw been ogleted and doo mented.

2.0 N-5 REVIEW 2.1 h PQMN shall verify that the following activities have been l.

satisfactorily conqpleted when an N-5 Code Data Report is submitted for signature:

2.1.1 All engineering and design activity for the system has been ocepleted including:

Design Specification updating.

Nonaanforsumoe Report (s) (NOR), Deficiency Report (s)-

(IR). and Design Qiange Authorisation(s)

(DCA) processing.

Final stress rimoonciliation for as-built conditions.

2.1.2 Fabrication and installation activities requiring confirmation for syntan including:

Pressure tasting.

As-built confinnation (see *x: tion 11 of this Manual).

Final documentation reviews (see Section 11 of this Manual).

2.1.3 000 activities requiring confirmation for the system including:

Ehgineering/ design surveillance and reviews (see Section 6 of this Manual).

Fema maa

COMANCHE PEAK STEAM ELECTRIC-STATION

' UNIT 2 i

EM C@E CONTROL PROGRAM d

g ASME lil DMSION 1 Etucm!T SECTION:

SECTION TITLE:

REVISION:

2 ACf1VITIES IN RNTGl? 0F N-5 12 asmet AND IgnryWIING PAGE.1.'OF.2_

Installer surveillances and reviews (see Sectim 8 of this Munal).

Firal doctmentatim reviews ( see Section 11-of this I

Phnual).

N-5 Code Data Report reviews includirs verification that N-5 entries are ocuplete, accurate and erw p===

all work and Code itmas within the N-5 bomdary.

2.2 h twoulta of 000 Surveillanose/ overviews conchaoted in l

acoordanoe with this

Section, including mentisfactory conditions, shall be documented on a Surveillance Report, Ruhibit l

, y 15.6 and controlled in accordance with 000 'Pav.)ect Pranarhass.

t maatisfactory concinions identified by 000_ ahall be assigned for-resolution by the responsible organisation in accordance with establiebed Comanche Peak Stmas Electric Station (@SES) pav=rknes.

If at the time of Surveillance Report issunnoe - an mentisfactory candition is not twoolved by the responsible l

organisation in a manner acceptable to the - 000,- the 000 shall initiate, as appropriate,. a Surveillance Observation Form-(SOF),

Exhibit 15.6 and/or a W Rvaluation (WE) Form in nocordance with Section 9 of this Marmal.

l 3.0 N-5 FINAL, penmutDC 3.1 k m the - ry review of the N-5 Code Data Report 'and supporting verifications of 000 activities are oogdete, the 14 MIN ahall process the N-5 for the approprir.te Piping Syst m I

Designer's signature.

l 3.2 After obtaining the Piping System Designer's signature, the 14MIM ahall sign and date the N-5 Compliance Statammt Exhibit 15.8 as the Owner's Agent and obtain the 000 ANI's signature and date for the AIA's monitoring activities.

I 3.3 h completed N-5 Code Data Report shall be formrded to the perunnent plant files and copies shall be distributed to the organimations signire the N-5, to W Electric and to others in acocedance with implementing pav =rbres.

'Ibe 54EIN shall maintain a copy of the N-5 Code Data Report with all attachments.