IR 07100014/2005004

From kanterella
Revision as of 17:36, 8 September 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Violation from Insp on 880401-0531.Violation Noted:Approved Written Meeting Minutes,Written Approvals or Disapprovals of Required Reviews & Ref Determinations Not Issued for Period 871014-0504
ML20196D172
Person / Time
Site: Yankee Rowe, 07100014
Issue date: 06/21/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20196D152 List:
References
50-029-88-09, 50-29-88-9, NUDOCS 8807010324
Download: ML20196D172 (1)


Text

_ - ________ _ ___ -__ __ _ _ - _ _ _ _ - _ _ - _ _ . __________ ___ ___ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

. .

. ,

APPENDIX A Notice of Violation Yankee Atomic Electric Company Docket No. 50-29 Yankee Nuclear Power Station License No. DPR-3 Ouring an NRC inspection conducted April 1 - May 31,1988, a violation of NRC requirements was identifie In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR 2, Appendix C (Enforcement Policy 1986), the violation is listed below.

,

Technical Specification (TS) 6.5.1.8 requires that the Plant Operation

Review Committee (PORC) maintain written minutes of each meeting and that copies be provided to the Manager of Operations and the Chairman of the Nuclear Safety Audit and Review Committee. TS 6.5.1.7.a requires that the PORC provide to the Plant Superintendent written approval or disapproval following the review of such items as p.-ocedures and changes thereto, pro-posed changes to the TS's, and all proposed changes or modifications to plant systems or equipment that affect nuclear safet In addition TS 4- 6.5.1.7.b requires the PORC to render determinations in writing with regard to whether or not each of the aforementioned items constitutes an unreviewed safety questio Contrary to the above, the requirements of Technical Specifications

6.5.1.8, 6.5.1.7.a and 6.5.1.7 b were not met from the period of October

. 14, 1987 through May 4, 1988 in that approved written meeting minutes,

! written approvals or disapprovals of required reviews, and determinations as to whether the items reviewed constituted unreviewed safety questions, were not issued for the various meetings held by the PORC during that period, i This is a Severity Level V violation (Supplement I),

i

'

Immediate corrective actions and actions to preclude recurrence were both timely and adequate, and therefore, no reply is required to this

! violation.

i (

,

I l

,

OFFICIAL RECORD COPY IR YR 88-09 - 0003. "

8807010324 880621 PDR ADOCK 05000029 O DCD

'

_-