JUN 211988
v
Docket No. 50-29
Yankee Atomic Electric Company
ATIN: Mr. Bruce L. Drawbridge
Vice President and
Acting Manager of Operations
1671 Worcester Road
Framingham, Massachusetts 01701
Gentlemen:
Subject: NRC Region I Inspection Report No. 50-29/88-09
This
refers . to
the
routine
resident
safety
inspection
condur.ted
by
Mr. H. Eichenholz
and
Mrs. C. Carpenter
of
this
office
on
April 1
-
- May 31,1988 at the Yankee Nuclear Power Station, Rowe, Massachusetts.
The
inspection consisted of observations of activities, interviews with personnel,
independent measurements and document reviews.
The results of the inspection
are described in the NRC Region I Inspection Report enclosed with this letter
and were discussed with Mr. N. St. Laurent of your staff at the conclusion of
the inspection.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
The violation, which
concerns the failure to maintain written meeting minutes for the Plant Opera-
tion Review Committee in accordance with Technical Specification 6.5.1.8
requirements, has been categorized by severity level in accordance with the
"General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR
,
Part 2, Appendix C (Enforcement Policy).
We note that immediate corrective
actions and actions to preclude recurrence were both timely and adequate, and
therefore, you are not required to respond to this letter.
Your cooperation with us is appreciated.
Sincerely,
Or1Mnd SIMM 8
.y.s.3 *:. McBa
James T. Wiggins, Chief
Reactor Projects Brancn No. 3
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report No. 50-29/88-09
0FFICIAL RECORD COPY
IR YR 88-09 - 0001.0.0 g{
06/21/88
,
8807010319 880621
g//
ADOCK 05000029
O
...
-__
___
.
.
Yankee Atomic Electric Company
2
g g y jggg
cc w/encls:
J. E. Tribble, President
N. N. St. Laurent, Plant Superintendent
G. J. Papanic, Jr., Senior Project Engineer - Licensing
P. W. Agnes, Assistant Secretary of Public Safety, Commonwealth of
l
l
Public Document Room (PDR)
i
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
bec w/encls:
Region I Docket Room (with concurrences)
M. Perkins, Management Assistant, DRMA (w/o enc 1)
D. Haverkamp, Section Chief, DRP
H. Eichenholz, SRI - Yankee (with concurrences)
G. Grant, SRI - Vermont Yankee
R. Bores, Technical Assistant, DRSS
RI:DRPf)lz/mjd
RI:
'
RI:DRP
'
Eic43bM
DHave 4mp
/Wiggins
f'
6/k//88
6/k//88
d 6///o68
0FFICIAL RECORD COPY
IR YR 88-09 - 0002.0.0
06/21/88
..
_ _ _ _ _ _