U.S. NUCLEAR REGULATORY COMMISSION REGION 1
'
Docket No.
50-29 License No.
DPR-03 Report No.
50-29/98-03 l
Licensee:
Yankee Atomic Electric Company 580 Main Street Bolton, Massachusetts 01740-1398 Facility Name:
Yankee Nuclear Power Station Location:
Rowe, Massachusetts Dates:
June 1 - July 31,1998
.
Inspectors:
J. Nick, Radiation Specialist, Region I L. Pittiglio, Project Manager, NMSS E. Abelquist, ORISE J. Payne, ORISE Approved by:
Mark C. Roberts, Acting Chief Decommissioning and Laboratory Branch Division of Nuclear Materials Safety, RI kdOO{pjCK76 981001
-
05000029 G
-
--
. _ -
- _ _ _ -. -.
.-_- - - - -
.- _
-
-
- - -. - _.. _ - -. _
- -.. -. -
.
.
EXECUTIVE SUMMARY l
Yankee Rowe Facility l
NRC Ir.spection Report No. 50-29/98-03
!
These inspections were conducted to determine whether the decommissioning activities carried out at the Yankee Rowe facility were conducted safely and in accordance with NRC
,
!
requirements. This report covers a two month period of inspection. Areas reviewed included modifications to the spent fuel pool building, radiological controls, and decommissioning activities. This inspection period also included independent measurements conducted by the Oak Ridge Institute for Science and Education (ORISE) on behalf of the NRC to assess the adequacy of the licensee's final status survey plan. These survey results were received by NRC on July 24,1998.
In general, there were effective programs for protecting the safety of workers during dismantlement and decommissioning activities. The licensee's final status survey program was l
consistent with NRC guidance. However, several areas for improvement were noted for the final status survey program, including details in the survey documentation and the method for resurveying after a survey reading exceeds a guideline value.
The areas for improvement will be reviewed when the confirmatory survey process continues.
NRC and ORISE wi!! visit the site at least two more times to take additional measurements and compare data with the licensee's program.
ii
_.. _ _.
_
. _ _ _ _
_ _ _ -. _ _
_ _ _ --.-
_ _ _
_
,
.
l
,
,
.
SUMMARY OF SURFACE ACTIVITY LEVELS TURBINE BUILDING YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS Location'
Total Activity Removable Activity (dpm/100cm )
(dpm/100 cm')
Alpha Beta TB002-
530
-2
'
450
-1
2600
-3 TB005
930
-5
3100
3
6500
3 TB009 Grid Block 129 750
-1 Grid Block 038 750
-4 Grid Block 173-1100
-3 Grid Block 013 1000
-3 j
Grid Block 077 920
-3 Grid Block 047-330
-1 l
l Yankee Nucteer Power Station (705) - July 24,1998 e ssa p\\ reports \\ yank ee.rowe\\ yank ee.002 A2-11 l
l l
-
.
TABLE 3 RADIONUCLIDE CONCENTRATIONS IN SOIL SAMPLES UNAFFECTED SOIL AREA OG001 YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS Location Radionuclide Concentrctions (pCilg)
- 1
<0.04 0.05 " 0.03'
- 2
<0.04 0.03 " 0.02
- 3
<0.05 0.06 " 0.02
- 4
<0.04 0.08 " 0.03
- 5
<0.03 0.02 " 0.02
,
" Uncertainties are total propagated uncertainties at the 95% confidence level.
I I
I Yankee Nuclear Power Station (705) - July 24,1998 essap\\ reports \\ yankee.rowe\\ yankee.002 A2-12
_
.-
...
..... -......
..__...~..__...m..
_....., _.
.... _. _
.,.. -.. = _ _ _
.,
,
,'
t i
?
essapVeporta\\yenkee.rowe\\yonkee.002 Yankee Nuclear Power Station (705) July 24,1998