Insp Rept 50-029/99-01 on 990101-0411.No Violations Noted. Major Areas Inspected:Cold Weather Preparations for Spent Fuel Pool,Radiological Controls & self-assessment & Auditing & Corrective Actions for Decommissioning ActivitiesML20206R341 |
Person / Time |
---|
Site: |
Yankee Rowe |
---|
Issue date: |
05/05/1999 |
---|
From: |
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
---|
To: |
|
---|
Shared Package |
---|
ML20206R329 |
List: |
---|
References |
---|
50-029-99-01, 50-29-99-1, NUDOCS 9905200088 |
Download: ML20206R341 (39) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000029/19990021999-08-0404 August 1999 Insp Rept 50-029/99-02 on 990411-0714.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Safe Operation of Sf Pool,Radiological Controls,Organization & Mgt Controls & Auditing & C/As for Decommissioning Activities IR 05000029/19990011999-05-0505 May 1999 Insp Rept 50-029/99-01 on 990101-0411.No Violations Noted. Major Areas Inspected:Cold Weather Preparations for Spent Fuel Pool,Radiological Controls & self-assessment & Auditing & Corrective Actions for Decommissioning Activities IR 05000029/19980031998-10-0101 October 1998 Insp Rept 50-029/98-03 on 980601-0731.No Violations Noted. Major Areas Inspected:Decommissioning Activities,Including Mods to Spent Fuel Pool Bldg & Radiological Controls IR 05000029/19980011998-06-24024 June 1998 Insp Repts 50-029/98-01 & 50-029/98-02 on 980101-0331.No Violations Noted.Major Areas Inspected:Mod to SFP Bldg, Radiological Controls & Decommissioning Activities IR 05000029/19970021997-09-23023 September 1997 Insp Rept 50-029/97-02 on 970401-0814.No Violations Noted. Major Areas Inspected:Licensee Activities Re Decommissioning IR 05000029/19970011997-05-16016 May 1997 Insp Rept 50-029/97-01 on 970301-31.No Violations Noted. Major Areas Inspected:Facility Operations IR 05000029/19960041997-01-24024 January 1997 Insp Rept 50-029/96-04 on 961119-21.No Violations Noted. Major Areas Inspected:Insp Verified by Observation, Documentation Review &/Or Discussions W/Responsible or Involved Plant Staff IR 05000029/19960031996-10-16016 October 1996 Insp Rept 50-029/96-03 on 960827-29.No Violations Noted. Major Areas Inspected:Operations,Rp Program,Including Operations,Staffing,Mgt & Licensee Experience in Identifying & Correcting Weaknesses Re Control of Radioactive Matls IR 05000029/19930071993-12-28028 December 1993 Insp Rept 50-029/93-07 on 930826-1118.Violation Noted. Major Areas Inspected:Posting of Radiological Areas & Other Controls,Organization & Staffing,Exposure ALARA Program & Radiological Info Available to Workers IR 05000029/19930081993-11-0909 November 1993 Insp Rept 50-029/93-08 on 931018-19.No Violations Noted. Major Areas Inspected:Mgt Support & Audits Protected Area Barriers,Detection & Assessment Aids Protected Area Access Control of Personnel,Alarm Stations & Communications IR 05000029/19930051993-08-18018 August 1993 Insp Rept 50-029/93-05 on 930510-0731.No Violations Noted. Major Areas Inspected:Operations,Maint Engineering & Plant Support,Including Radiological Controls,Security,Fire Protection & Housekeeping & Administration IR 05000029/19920111993-02-0505 February 1993 Insp Rept 50-029/92-11 on 921114-930201.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Security,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000029/19920101992-11-23023 November 1992 Insp Rept 50-029/92-10 on 921104-06.One Open Items Noted. Major Areas Inspected:Contamination Monitoring of Guardhouse,Postings & Other Controls,Radiological Control of Work in Progress & Organization & Staffing ML20127F1051992-11-23023 November 1992 Corrected Cover Page for Insp Rept 50-029/92-10 on 921104-06.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Contamination Monitoring at Guardhouse,Postings & Other Controls Observed During Tours IR 05000029/19900231990-12-0505 December 1990 Insp Rept 50-029/90-23 on 901105-09.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Controls & Radiological Environ Monitoring Programs ML20062H0801990-11-19019 November 1990 Insp Rept 50-029/90-21 on 901015-19.Noncited Violation Noted.Areas Inspected:Response to Bulletin 79-14 Re Seismic Analysis of as-built safety-related Piping Sys IR 05000029/19900161990-11-0606 November 1990 Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security IR 05000029/19900811990-09-28028 September 1990 Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted.Major Areas Inspected:Maint Program IR 05000029/19900121990-09-24024 September 1990 Insp Rept 50-029/90-12 on 900619-0820.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Security,Engineering/Technical Support,Safety Assessment/Quality Verification & Repts ML20058D3651990-09-14014 September 1990 Insp Rept 50-029/90-17 on 900730-0803.No Violations Noted. Major Areas Inspected:Audit of Licensee Action in Response to Recommendation Described in Generic Ltr 88-17 ML20059K7171990-09-0707 September 1990 Insp Rept 50-029/90-14 on 900802-27.Violations Noted Re Failure to Demonstrate Emergency Diesel Generators Operability at Required Capacity Under Design Basis Conditions.Major Areas Inspected:Emergency Diesel Generator IR 05000029/19900131990-08-0303 August 1990 Insp Rept 50-029/90-13 on 900709-13.One Noncited Violation Noted.Major Areas Inspected:Implementation of Radiation Protection Program During Current Refueling Outage & Review of Training & Qualification of Contractor Technicians IR 05000029/19900111990-08-0101 August 1990 Insp Rept 50-029/90-11 on 900619-22.No Violations or Deviations Noted.Major Areas Inspected:Safety Injection Tank Design & Replacement Procedures Together W/Walkdown of Safety Injection Sys Pumps,Valves & Piping IR 05000029/19900091990-07-16016 July 1990 Insp Rept 50-029/90-09 on 900515-0618.No Violations Noted. Major Areas Inspected:Operational Safety,Plant Operations, Radiological Controls,Maint & Surveillance,Emergency Preparedness,Security & Engineering/Technical Support IR 05000029/19900051990-02-16016 February 1990 Physical Security Insp Rept 50-029/90-05 on 900207-09.No Violations Noted.Major Areas Inspected:Implementation of Safeguards Info & Personnel Access Control Programs at Corporate Ofc IR 05000029/19890111989-08-28028 August 1989 Insp Rept 50-029/89-11 on 890626-0731.Unresolved Items Noted Re Plant Operations Review Committee Actions to Address Task Force Investigation Results of 890725 Loss of Emergency Bus.Areas Investigated:Security & LERs IR 05000029/19890131989-08-23023 August 1989 Physical Security Insp Rept 50-029/89-13 on 890724-28.No Violations Noted.Major Areas Inspected:Action on Findings of NRC Regulatory Effectiveness Review,Mgt Support,Security Program Plan,Audits & Protected & Vital Area Physical IR 05000029/19890151989-08-15015 August 1989 Emergency Preparedness Insp Rept 50-029/89-15 on 890731-0803.No Violations Noted.Major Areas Inspected: Changes to Emergency Preparedness Program & Facilities, Equipment,Instrumentation & Supplies ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods IR 05000029/19890121989-08-0101 August 1989 Insp Rept 50-029/89-12 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys, Transportation & Liquid & Gaseous Effluents Programs, Including:Mgt Controls,Audits,Qa & Program Implementation IR 05000029/19890091989-07-25025 July 1989 Insp Rept 50-029/89-09 on 890522-0625.No Violations Noted. Major Areas Inspected:Daytime & Backshifts of Previous Insp Findings,Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & LERs IR 05000029/19890101989-07-20020 July 1989 Insp Rept 50-029/89-10 on 890705-07.No Violations Noted. Major Areas Inspected:Operational Radiological Environ Monitoring Program Including Mgt Controls & Licensee Program for QC of Analytical Measurements IR 05000029/19890061989-07-14014 July 1989 Insp Rept 50-029/89-06 on 890410-0521.Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890081989-07-0606 July 1989 Insp Rept 50-029/89-08 on 890530-0601.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention Program, Including Program Admin & Organization,Admin Control & Combustibles & Admin Control of Ignition Sources IR 05000029/19890071989-06-0707 June 1989 Insp Rept 50-029/89-07 on 890524-26.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Changes in Radiation Protection Program & ALARA IR 05000029/19890021989-05-0404 May 1989 Insp Rept 50-029/89-02 on 890228-0410.No Unacceptable Conditions Noted.Major Areas Inspected:Operation Safety, Security,Plant Operation,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890051989-05-0202 May 1989 Insp Rept 50-029/89-05 on 890403-07.No Violations Noted. Major Areas Inspected:Review of Util Actions on NRC Identified Previous Concern Re Generic Ltr 83-28,Item 2.2.2, Vendor Interface & commercial-grade Item Program IR 05000029/19890041989-04-25025 April 1989 Partially Deleted Insp Rept 50-029/89-04 on 890403-07 (Ref 10CFR73.21).Noncompliance Noted.Major Areas Inspected: Licensee Action on Findings in NRC Rer,Mgt Support,Security Program Plans & Audits & Power Supply IR 05000029/19890011989-03-29029 March 1989 Insp Rept 50-029/89-01 on 890118-0227.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Operational Safety Verification,Radiological Controls & Events Requiring Telephone Notification of NRC ML20235Y7951989-03-0202 March 1989 Insp Rept 50-029/88-22 on 881115-890117.Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety Verification,Esf Sys Walkdown & Licensee Response to Selected Safety Issues ML20206C5391988-11-0202 November 1988 Onsite Regular & Backshift Insp Rept 50-29/88-16 on 880802- 1003.Major Areas Inspected:Licensee Action on Previous Inspector Findings,Operational Safety Verification, Radiological Controls,Plant Events & Maint Observations IR 05000029/19880191988-09-30030 September 1988 Insp Rept 50-029/88-19 on 880909.No Violations Noted.Major Areas Inspected:Circumstances Surrounding Waste Shipments 88-15 & 88-16 from Licensee Facilities to Barnwell,Sc IR 05000029/19880171988-09-23023 September 1988 Insp Rept 50-029/88-17 on 880815-18.No Violations Noted. Major Areas inspected:pre-outage Evaluation,Review of Prior Insp Findings & Observation of in-plant Radiological Controls,Including Mgt & Organization & Personnel Training IR 05000029/19880101988-09-13013 September 1988 Insp Rept 50-029/88-10 on 880601-0801.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Inspector Findings,Operational Safety Verification,Radiological Controls & Events Requiring Telephone Notification to NRC IR 05000029/19880151988-09-0707 September 1988 Insp Rept 50-029/88-15 on 880815-18.No Violations Noted. Major Areas Inspected:Radiochemical Measurements Program Using NRC Mobile Measurements Lab & Licensee Whole Body Counting Facility,Including Confirmatory Measurements IR 05000029/19880141988-08-11011 August 1988 Insp Rept 50-029/88-14 on 880718-22.No Violations Noted. Major Areas Inspected:Implementation of Provisions of Inservice Test Program for Pumps & Valves,Test Procedures & Results & Results of May 1987 Integrated Leak Rate Test IR 05000029/19880131988-08-0303 August 1988 Partially Deleted Physical Security Insp Rept 50-029/88-13 on 880711-15 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Organization,Locks,Keys & Combinations,Physical Barriers & Vital Areas IR 05000029/19880121988-07-15015 July 1988 Insp Rept 50-029/88-12 on 880620-24.No Violation Noted.Major Areas Inspected:Radwaste Insp Program,Including Training of Personnel,Procurement of Packaging,Delivery to Carriers, Records & Repts,Waste Classification & Labeling IR 05000029/19880091988-06-21021 June 1988 Onsite Regular & Backshift Insp Rept 50-029/88-09.Violations Noted.Major Areas Inspected:Previous Insp Findings,Bimonthly Safety Sys Verification,Operational Safety Verification, Radiological Controls & Emergency Exercise IR 05000029/19880081988-06-0202 June 1988 Insp Rept 50-029/88-08 on 880426-28.No Violations Noted. Major Areas Inspected:Emergency Preparedness Insp & Observation of Licensee Annual Emergency Exercise Performed on 880426 1999-08-04
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000029/19990021999-08-0404 August 1999 Insp Rept 50-029/99-02 on 990411-0714.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Safe Operation of Sf Pool,Radiological Controls,Organization & Mgt Controls & Auditing & C/As for Decommissioning Activities IR 05000029/19990011999-05-0505 May 1999 Insp Rept 50-029/99-01 on 990101-0411.No Violations Noted. Major Areas Inspected:Cold Weather Preparations for Spent Fuel Pool,Radiological Controls & self-assessment & Auditing & Corrective Actions for Decommissioning Activities IR 05000029/19980031998-10-0101 October 1998 Insp Rept 50-029/98-03 on 980601-0731.No Violations Noted. Major Areas Inspected:Decommissioning Activities,Including Mods to Spent Fuel Pool Bldg & Radiological Controls IR 05000029/19980011998-06-24024 June 1998 Insp Repts 50-029/98-01 & 50-029/98-02 on 980101-0331.No Violations Noted.Major Areas Inspected:Mod to SFP Bldg, Radiological Controls & Decommissioning Activities IR 05000029/19970021997-09-23023 September 1997 Insp Rept 50-029/97-02 on 970401-0814.No Violations Noted. Major Areas Inspected:Licensee Activities Re Decommissioning IR 05000029/19970011997-05-16016 May 1997 Insp Rept 50-029/97-01 on 970301-31.No Violations Noted. Major Areas Inspected:Facility Operations IR 05000029/19960041997-01-24024 January 1997 Insp Rept 50-029/96-04 on 961119-21.No Violations Noted. Major Areas Inspected:Insp Verified by Observation, Documentation Review &/Or Discussions W/Responsible or Involved Plant Staff IR 05000029/19960031996-10-16016 October 1996 Insp Rept 50-029/96-03 on 960827-29.No Violations Noted. Major Areas Inspected:Operations,Rp Program,Including Operations,Staffing,Mgt & Licensee Experience in Identifying & Correcting Weaknesses Re Control of Radioactive Matls IR 05000029/19930071993-12-28028 December 1993 Insp Rept 50-029/93-07 on 930826-1118.Violation Noted. Major Areas Inspected:Posting of Radiological Areas & Other Controls,Organization & Staffing,Exposure ALARA Program & Radiological Info Available to Workers IR 05000029/19930081993-11-0909 November 1993 Insp Rept 50-029/93-08 on 931018-19.No Violations Noted. Major Areas Inspected:Mgt Support & Audits Protected Area Barriers,Detection & Assessment Aids Protected Area Access Control of Personnel,Alarm Stations & Communications IR 05000029/19930051993-08-18018 August 1993 Insp Rept 50-029/93-05 on 930510-0731.No Violations Noted. Major Areas Inspected:Operations,Maint Engineering & Plant Support,Including Radiological Controls,Security,Fire Protection & Housekeeping & Administration IR 05000029/19920111993-02-0505 February 1993 Insp Rept 50-029/92-11 on 921114-930201.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Security,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000029/19920101992-11-23023 November 1992 Insp Rept 50-029/92-10 on 921104-06.One Open Items Noted. Major Areas Inspected:Contamination Monitoring of Guardhouse,Postings & Other Controls,Radiological Control of Work in Progress & Organization & Staffing ML20127F1051992-11-23023 November 1992 Corrected Cover Page for Insp Rept 50-029/92-10 on 921104-06.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Contamination Monitoring at Guardhouse,Postings & Other Controls Observed During Tours IR 05000029/19900231990-12-0505 December 1990 Insp Rept 50-029/90-23 on 901105-09.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Controls & Radiological Environ Monitoring Programs ML20062H0801990-11-19019 November 1990 Insp Rept 50-029/90-21 on 901015-19.Noncited Violation Noted.Areas Inspected:Response to Bulletin 79-14 Re Seismic Analysis of as-built safety-related Piping Sys IR 05000029/19900161990-11-0606 November 1990 Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security IR 05000029/19900811990-09-28028 September 1990 Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted.Major Areas Inspected:Maint Program IR 05000029/19900121990-09-24024 September 1990 Insp Rept 50-029/90-12 on 900619-0820.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Security,Engineering/Technical Support,Safety Assessment/Quality Verification & Repts ML20058D3651990-09-14014 September 1990 Insp Rept 50-029/90-17 on 900730-0803.No Violations Noted. Major Areas Inspected:Audit of Licensee Action in Response to Recommendation Described in Generic Ltr 88-17 ML20059K7171990-09-0707 September 1990 Insp Rept 50-029/90-14 on 900802-27.Violations Noted Re Failure to Demonstrate Emergency Diesel Generators Operability at Required Capacity Under Design Basis Conditions.Major Areas Inspected:Emergency Diesel Generator IR 05000029/19900131990-08-0303 August 1990 Insp Rept 50-029/90-13 on 900709-13.One Noncited Violation Noted.Major Areas Inspected:Implementation of Radiation Protection Program During Current Refueling Outage & Review of Training & Qualification of Contractor Technicians IR 05000029/19900111990-08-0101 August 1990 Insp Rept 50-029/90-11 on 900619-22.No Violations or Deviations Noted.Major Areas Inspected:Safety Injection Tank Design & Replacement Procedures Together W/Walkdown of Safety Injection Sys Pumps,Valves & Piping IR 05000029/19900091990-07-16016 July 1990 Insp Rept 50-029/90-09 on 900515-0618.No Violations Noted. Major Areas Inspected:Operational Safety,Plant Operations, Radiological Controls,Maint & Surveillance,Emergency Preparedness,Security & Engineering/Technical Support IR 05000029/19900051990-02-16016 February 1990 Physical Security Insp Rept 50-029/90-05 on 900207-09.No Violations Noted.Major Areas Inspected:Implementation of Safeguards Info & Personnel Access Control Programs at Corporate Ofc IR 05000029/19890111989-08-28028 August 1989 Insp Rept 50-029/89-11 on 890626-0731.Unresolved Items Noted Re Plant Operations Review Committee Actions to Address Task Force Investigation Results of 890725 Loss of Emergency Bus.Areas Investigated:Security & LERs IR 05000029/19890131989-08-23023 August 1989 Physical Security Insp Rept 50-029/89-13 on 890724-28.No Violations Noted.Major Areas Inspected:Action on Findings of NRC Regulatory Effectiveness Review,Mgt Support,Security Program Plan,Audits & Protected & Vital Area Physical IR 05000029/19890151989-08-15015 August 1989 Emergency Preparedness Insp Rept 50-029/89-15 on 890731-0803.No Violations Noted.Major Areas Inspected: Changes to Emergency Preparedness Program & Facilities, Equipment,Instrumentation & Supplies ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods IR 05000029/19890121989-08-0101 August 1989 Insp Rept 50-029/89-12 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys, Transportation & Liquid & Gaseous Effluents Programs, Including:Mgt Controls,Audits,Qa & Program Implementation IR 05000029/19890091989-07-25025 July 1989 Insp Rept 50-029/89-09 on 890522-0625.No Violations Noted. Major Areas Inspected:Daytime & Backshifts of Previous Insp Findings,Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & LERs IR 05000029/19890101989-07-20020 July 1989 Insp Rept 50-029/89-10 on 890705-07.No Violations Noted. Major Areas Inspected:Operational Radiological Environ Monitoring Program Including Mgt Controls & Licensee Program for QC of Analytical Measurements IR 05000029/19890061989-07-14014 July 1989 Insp Rept 50-029/89-06 on 890410-0521.Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890081989-07-0606 July 1989 Insp Rept 50-029/89-08 on 890530-0601.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention Program, Including Program Admin & Organization,Admin Control & Combustibles & Admin Control of Ignition Sources IR 05000029/19890071989-06-0707 June 1989 Insp Rept 50-029/89-07 on 890524-26.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Changes in Radiation Protection Program & ALARA IR 05000029/19890021989-05-0404 May 1989 Insp Rept 50-029/89-02 on 890228-0410.No Unacceptable Conditions Noted.Major Areas Inspected:Operation Safety, Security,Plant Operation,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890051989-05-0202 May 1989 Insp Rept 50-029/89-05 on 890403-07.No Violations Noted. Major Areas Inspected:Review of Util Actions on NRC Identified Previous Concern Re Generic Ltr 83-28,Item 2.2.2, Vendor Interface & commercial-grade Item Program IR 05000029/19890041989-04-25025 April 1989 Partially Deleted Insp Rept 50-029/89-04 on 890403-07 (Ref 10CFR73.21).Noncompliance Noted.Major Areas Inspected: Licensee Action on Findings in NRC Rer,Mgt Support,Security Program Plans & Audits & Power Supply IR 05000029/19890011989-03-29029 March 1989 Insp Rept 50-029/89-01 on 890118-0227.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Operational Safety Verification,Radiological Controls & Events Requiring Telephone Notification of NRC ML20235Y7951989-03-0202 March 1989 Insp Rept 50-029/88-22 on 881115-890117.Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety Verification,Esf Sys Walkdown & Licensee Response to Selected Safety Issues ML20206C5391988-11-0202 November 1988 Onsite Regular & Backshift Insp Rept 50-29/88-16 on 880802- 1003.Major Areas Inspected:Licensee Action on Previous Inspector Findings,Operational Safety Verification, Radiological Controls,Plant Events & Maint Observations IR 05000029/19880191988-09-30030 September 1988 Insp Rept 50-029/88-19 on 880909.No Violations Noted.Major Areas Inspected:Circumstances Surrounding Waste Shipments 88-15 & 88-16 from Licensee Facilities to Barnwell,Sc IR 05000029/19880171988-09-23023 September 1988 Insp Rept 50-029/88-17 on 880815-18.No Violations Noted. Major Areas inspected:pre-outage Evaluation,Review of Prior Insp Findings & Observation of in-plant Radiological Controls,Including Mgt & Organization & Personnel Training IR 05000029/19880101988-09-13013 September 1988 Insp Rept 50-029/88-10 on 880601-0801.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Inspector Findings,Operational Safety Verification,Radiological Controls & Events Requiring Telephone Notification to NRC IR 05000029/19880151988-09-0707 September 1988 Insp Rept 50-029/88-15 on 880815-18.No Violations Noted. Major Areas Inspected:Radiochemical Measurements Program Using NRC Mobile Measurements Lab & Licensee Whole Body Counting Facility,Including Confirmatory Measurements IR 05000029/19880141988-08-11011 August 1988 Insp Rept 50-029/88-14 on 880718-22.No Violations Noted. Major Areas Inspected:Implementation of Provisions of Inservice Test Program for Pumps & Valves,Test Procedures & Results & Results of May 1987 Integrated Leak Rate Test IR 05000029/19880131988-08-0303 August 1988 Partially Deleted Physical Security Insp Rept 50-029/88-13 on 880711-15 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Organization,Locks,Keys & Combinations,Physical Barriers & Vital Areas IR 05000029/19880121988-07-15015 July 1988 Insp Rept 50-029/88-12 on 880620-24.No Violation Noted.Major Areas Inspected:Radwaste Insp Program,Including Training of Personnel,Procurement of Packaging,Delivery to Carriers, Records & Repts,Waste Classification & Labeling IR 05000029/19880091988-06-21021 June 1988 Onsite Regular & Backshift Insp Rept 50-029/88-09.Violations Noted.Major Areas Inspected:Previous Insp Findings,Bimonthly Safety Sys Verification,Operational Safety Verification, Radiological Controls & Emergency Exercise IR 05000029/19880081988-06-0202 June 1988 Insp Rept 50-029/88-08 on 880426-28.No Violations Noted. Major Areas Inspected:Emergency Preparedness Insp & Observation of Licensee Annual Emergency Exercise Performed on 880426 1999-08-04
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000029/19990021999-08-0404 August 1999 Insp Rept 50-029/99-02 on 990411-0714.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Safe Operation of Sf Pool,Radiological Controls,Organization & Mgt Controls & Auditing & C/As for Decommissioning Activities IR 05000029/19990011999-05-0505 May 1999 Insp Rept 50-029/99-01 on 990101-0411.No Violations Noted. Major Areas Inspected:Cold Weather Preparations for Spent Fuel Pool,Radiological Controls & self-assessment & Auditing & Corrective Actions for Decommissioning Activities IR 05000029/19980031998-10-0101 October 1998 Insp Rept 50-029/98-03 on 980601-0731.No Violations Noted. Major Areas Inspected:Decommissioning Activities,Including Mods to Spent Fuel Pool Bldg & Radiological Controls IR 05000029/19980011998-06-24024 June 1998 Insp Repts 50-029/98-01 & 50-029/98-02 on 980101-0331.No Violations Noted.Major Areas Inspected:Mod to SFP Bldg, Radiological Controls & Decommissioning Activities IR 05000029/19970021997-09-23023 September 1997 Insp Rept 50-029/97-02 on 970401-0814.No Violations Noted. Major Areas Inspected:Licensee Activities Re Decommissioning IR 05000029/19970011997-05-16016 May 1997 Insp Rept 50-029/97-01 on 970301-31.No Violations Noted. Major Areas Inspected:Facility Operations PNO-I-97-026, on 970427,Yankee Atomic Electric Will Begin Shipment of Reactor Vessel for Disposal.First Phase of Shipment Will Involve Heavy Haul Truck from Rowe,Ma Site to Railway Approx Six Miles Away Near Hoosac Tunnel1997-04-25025 April 1997 PNO-I-97-026:on 970427,Yankee Atomic Electric Will Begin Shipment of Reactor Vessel for Disposal.First Phase of Shipment Will Involve Heavy Haul Truck from Rowe,Ma Site to Railway Approx Six Miles Away Near Hoosac Tunnel IR 05000029/19960041997-01-24024 January 1997 Insp Rept 50-029/96-04 on 961119-21.No Violations Noted. Major Areas Inspected:Insp Verified by Observation, Documentation Review &/Or Discussions W/Responsible or Involved Plant Staff IR 05000029/19960031996-10-16016 October 1996 Insp Rept 50-029/96-03 on 960827-29.No Violations Noted. Major Areas Inspected:Operations,Rp Program,Including Operations,Staffing,Mgt & Licensee Experience in Identifying & Correcting Weaknesses Re Control of Radioactive Matls ML20059D6441993-12-28028 December 1993 Notice of Violation from Insp on 930826-1118.Violation Noted:On 930826,inspector Found Several Examples of High Radiation Areas Where Licensee Did Not Barricade or Properly Control Access to Prevent Inadvertent Entry IR 05000029/19930071993-12-28028 December 1993 Insp Rept 50-029/93-07 on 930826-1118.Violation Noted. Major Areas Inspected:Posting of Radiological Areas & Other Controls,Organization & Staffing,Exposure ALARA Program & Radiological Info Available to Workers PNO-I-93-070, on 931208,last Four SGs from Yankee Rowe Plant Transported by Heavy Hauler Truck & Trailer to Rail Line Approx Six Miles from Plant.One Protester Observed.States of Ma & VT Informed1993-12-0909 December 1993 PNO-I-93-070:on 931208,last Four SGs from Yankee Rowe Plant Transported by Heavy Hauler Truck & Trailer to Rail Line Approx Six Miles from Plant.One Protester Observed.States of Ma & VT Informed PNO-I-93-067, on 931207,painted-over School Bus Containing Protestors from Citizen Awareness Network & Greenpeace Blocked Yankee Rowe Access Route in Effort to Prevent Off Site Transport of Third of Four SGs1993-12-0707 December 1993 PNO-I-93-067:on 931207,painted-over School Bus Containing Protestors from Citizen Awareness Network & Greenpeace Blocked Yankee Rowe Access Route in Effort to Prevent Off Site Transport of Third of Four SGs ML20059M5771993-11-15015 November 1993 PNO-1-93-064A:on 931116 & 17,util Plans to Ship Two of Four Steam Generators from Plant to Radwaste Depository at Barnwell,Sc.Licensee Will Evaluate Weather Conditions on Morning of Transportation.Commonwealth of Ma Informed IR 05000029/19930081993-11-0909 November 1993 Insp Rept 50-029/93-08 on 931018-19.No Violations Noted. Major Areas Inspected:Mgt Support & Audits Protected Area Barriers,Detection & Assessment Aids Protected Area Access Control of Personnel,Alarm Stations & Communications IR 05000029/19930051993-08-18018 August 1993 Insp Rept 50-029/93-05 on 930510-0731.No Violations Noted. Major Areas Inspected:Operations,Maint Engineering & Plant Support,Including Radiological Controls,Security,Fire Protection & Housekeeping & Administration IR 05000029/19920111993-02-0505 February 1993 Insp Rept 50-029/92-11 on 921114-930201.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Security,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000029/19920101992-11-23023 November 1992 Insp Rept 50-029/92-10 on 921104-06.One Open Items Noted. Major Areas Inspected:Contamination Monitoring of Guardhouse,Postings & Other Controls,Radiological Control of Work in Progress & Organization & Staffing ML20127F1051992-11-23023 November 1992 Corrected Cover Page for Insp Rept 50-029/92-10 on 921104-06.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Contamination Monitoring at Guardhouse,Postings & Other Controls Observed During Tours IR 05000029/19900231990-12-0505 December 1990 Insp Rept 50-029/90-23 on 901105-09.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Controls & Radiological Environ Monitoring Programs ML20062H0801990-11-19019 November 1990 Insp Rept 50-029/90-21 on 901015-19.Noncited Violation Noted.Areas Inspected:Response to Bulletin 79-14 Re Seismic Analysis of as-built safety-related Piping Sys PNO-I-90-096, on 901109,reactor Manually Tripped Following Receipt of Alarms Indicating Automatic Scram Occurred1990-11-0909 November 1990 PNO-I-90-096:on 901109,reactor Manually Tripped Following Receipt of Alarms Indicating Automatic Scram Occurred ML20197H7151990-11-0606 November 1990 Notice of Violation from Insp on 900821-1001.Violation Noted:Corrective Action Implemented as Result of Failures of Emergency Lighting Surveillance Test Failed to Preclude Repetition of Failures IR 05000029/19900161990-11-0606 November 1990 Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security ML20058D2871990-10-19019 October 1990 Notice of Violation from Insp on 900802-27.Violation Noted:Failure to Adequately Test EDGs After Major Overhaul IR 05000029/19900811990-09-28028 September 1990 Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted.Major Areas Inspected:Maint Program IR 05000029/19900121990-09-24024 September 1990 Insp Rept 50-029/90-12 on 900619-0820.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Security,Engineering/Technical Support,Safety Assessment/Quality Verification & Repts ML20058D3651990-09-14014 September 1990 Insp Rept 50-029/90-17 on 900730-0803.No Violations Noted. Major Areas Inspected:Audit of Licensee Action in Response to Recommendation Described in Generic Ltr 88-17 ML20059K7171990-09-0707 September 1990 Insp Rept 50-029/90-14 on 900802-27.Violations Noted Re Failure to Demonstrate Emergency Diesel Generators Operability at Required Capacity Under Design Basis Conditions.Major Areas Inspected:Emergency Diesel Generator IR 05000029/19900131990-08-0303 August 1990 Insp Rept 50-029/90-13 on 900709-13.One Noncited Violation Noted.Major Areas Inspected:Implementation of Radiation Protection Program During Current Refueling Outage & Review of Training & Qualification of Contractor Technicians IR 05000029/19900111990-08-0101 August 1990 Insp Rept 50-029/90-11 on 900619-22.No Violations or Deviations Noted.Major Areas Inspected:Safety Injection Tank Design & Replacement Procedures Together W/Walkdown of Safety Injection Sys Pumps,Valves & Piping IR 05000029/19900061990-07-24024 July 1990 Exam Rept 50-029/90-06OL on 900619-21.Exam Results:All Three Candidates Passed Exams & Issued Licenses IR 05000029/19900091990-07-16016 July 1990 Insp Rept 50-029/90-09 on 900515-0618.No Violations Noted. Major Areas Inspected:Operational Safety,Plant Operations, Radiological Controls,Maint & Surveillance,Emergency Preparedness,Security & Engineering/Technical Support PNO-I-90-042, on 900519,security Discovered Unauthorized Firearm Behind Seat of Contractor Truck in Protected Area. Driver Stated Weapon Hidden Under Numerous Other Items & Slipped His Mind.Firearm Almost Rusted Closed1990-05-21021 May 1990 PNO-I-90-042:on 900519,security Discovered Unauthorized Firearm Behind Seat of Contractor Truck in Protected Area. Driver Stated Weapon Hidden Under Numerous Other Items & Slipped His Mind.Firearm Almost Rusted Closed IR 05000029/19900051990-02-16016 February 1990 Physical Security Insp Rept 50-029/90-05 on 900207-09.No Violations Noted.Major Areas Inspected:Implementation of Safeguards Info & Personnel Access Control Programs at Corporate Ofc IR 05000029/19890111989-08-28028 August 1989 Insp Rept 50-029/89-11 on 890626-0731.Unresolved Items Noted Re Plant Operations Review Committee Actions to Address Task Force Investigation Results of 890725 Loss of Emergency Bus.Areas Investigated:Security & LERs PNO-I-89-073, on 890825,when Tagging Removed on 5-inch Diameter Bypass Line,Pressure Boundary Leakage Discovered from Defect in Socket Weld Connection Between Vent & Bypass Lines.Plant Shutdown.Leakage Rate Less than 1 Gpm1989-08-25025 August 1989 PNO-I-89-073:on 890825,when Tagging Removed on 5-inch Diameter Bypass Line,Pressure Boundary Leakage Discovered from Defect in Socket Weld Connection Between Vent & Bypass Lines.Plant Shutdown.Leakage Rate Less than 1 Gpm IR 05000029/19890131989-08-23023 August 1989 Physical Security Insp Rept 50-029/89-13 on 890724-28.No Violations Noted.Major Areas Inspected:Action on Findings of NRC Regulatory Effectiveness Review,Mgt Support,Security Program Plan,Audits & Protected & Vital Area Physical PNO-I-89-071, on 890816,licensee Began Controlled Power Reduction to 20% of Rated Power to Investigate Leaking Inlet Flange of Safety Valve Located on Bypass Line of Main Coolant Loop 2.Flange Become Encrusted W/Solidified Boron1989-08-17017 August 1989 PNO-I-89-071:on 890816,licensee Began Controlled Power Reduction to 20% of Rated Power to Investigate Leaking Inlet Flange of Safety Valve Located on Bypass Line of Main Coolant Loop 2.Flange Become Encrusted W/Solidified Boron IR 05000029/19890151989-08-15015 August 1989 Emergency Preparedness Insp Rept 50-029/89-15 on 890731-0803.No Violations Noted.Major Areas Inspected: Changes to Emergency Preparedness Program & Facilities, Equipment,Instrumentation & Supplies ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods IR 05000029/19890031989-08-0909 August 1989 Requalification Exam Rept 50-029/89-03OL on 890620-30.Exam Results:Six Senior Reactor Operators (SRO) & Six Reactor Operators Passed Exams.Three SROs Failed One or More Portions of Exams IR 05000029/19890121989-08-0101 August 1989 Insp Rept 50-029/89-12 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys, Transportation & Liquid & Gaseous Effluents Programs, Including:Mgt Controls,Audits,Qa & Program Implementation IR 05000029/19890091989-07-25025 July 1989 Insp Rept 50-029/89-09 on 890522-0625.No Violations Noted. Major Areas Inspected:Daytime & Backshifts of Previous Insp Findings,Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & LERs IR 05000029/19890101989-07-20020 July 1989 Insp Rept 50-029/89-10 on 890705-07.No Violations Noted. Major Areas Inspected:Operational Radiological Environ Monitoring Program Including Mgt Controls & Licensee Program for QC of Analytical Measurements ML20247B0801989-07-14014 July 1989 Notice of Violation from Insp on 890410-0521.Violation Noted:Licensee Failed to Properly Restore Circuitry Configuration of Module in Control Room Main Fire Panel During Surveillance Testing IR 05000029/19890061989-07-14014 July 1989 Insp Rept 50-029/89-06 on 890410-0521.Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890081989-07-0606 July 1989 Insp Rept 50-029/89-08 on 890530-0601.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention Program, Including Program Admin & Organization,Admin Control & Combustibles & Admin Control of Ignition Sources IR 05000029/19890071989-06-0707 June 1989 Insp Rept 50-029/89-07 on 890524-26.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Changes in Radiation Protection Program & ALARA IR 05000029/19890021989-05-0404 May 1989 Insp Rept 50-029/89-02 on 890228-0410.No Unacceptable Conditions Noted.Major Areas Inspected:Operation Safety, Security,Plant Operation,Maint & Surveillance,Engineering Support & Radiological Controls 1999-08-04
[Table view] |
Text
.
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Docket N License N DPR-03 Report N /99-01 Licensee: Yankee Atomic Electric Company 580 Main Street Bolton, Massachusetts 01740-1398 Facility Name: Yankee Nuclear Power Station Location: Rowe, Massachusetts Dates: January 1 - April 11,1999 Inspector: J. Nick, Radiation Specialist, Region i Approved by: Ronald R. Bellamy, Chief Decommissioning and Laboratory Branch Division of Nuclear Materials Safety, RI
"
t 9905200008 990505 PDR ADOCK 05000029 0 PDR g
. _ _ _ _ _ - _ _ _ _ _ _ _
.
.
'
.
EXECUTIVE SUMMARY Yankee Facility l
NRC Inspection Report No. 50-29/99-01 j l
l
Inspections were conducted to determine whether the decommissioning activities carried out at the l Yankee (Rowe) facility were conducted safely and in accordance with NRC requirements. This report covers a three-month period of inspection. Areas reviewed included cold weather j preparations for the spent fuel pool, radiological controls, and self-assessment, auditing and l corrective actions for decommissioning sctivities, in general, there were effective programs for protecting the safety of workers during dismantlement and decommissioning activitie The licensee had provided good controls for radiation exposure and very good controls for radioactive materials and contamination, surveys and monitoring during decommissioning work {
activities. No violations or significant safety concems were identifie J
!
The licensee performed very good quality assurance audits in various areas of decommissioning work. The inspector noted that the quality assurance auditors were identifying many items that the line organization could reasonably have been expected to identify. The licensee implemented a i condition report system that should allow employees to report conditions adverse to safety or )
quality. Although the new reporting system should help in identifying problems, the inspector noted l that there was no formal self-assessment process to identify issues before they become a bigger !
problem. The Nuclear Safety Assessment Review Committee continued to provide excellent {
oversight and assessment comments to the licensee's managemen !
)
Effective procedures and processes to protect the safety of the spent fuel during extreme cold weather were implemented by the licensee. A broken distillate line on the radwaste processing skid was attributed to freezing conditions and the licensee implemented effective corrective actions to prevent recurrence. The licensee's self-audit for Information Notice 98-02, " Nuclear Power Plant Cold Weather Problems and Protective Measures," was adequate. The inspector noted several upgrades to the spent fuel pool building that will enhance protection from extreme cold weathe l
l
~ ii
l
.
.
.
REPORT DETAILS 01 Summary Of Facility Operations l l
On October 12,1995, the NRC served Memorandum and Order CLl-95-14 to Yankee Atomic '
'
Electric Company (YAEC) conceming activities at the Yankee Nuclear Power Station (NPS) in Rowe, Massachusetts. The Order states, in part, that "the NRC's approval of the Yankee NPS Decommissioning Plan cannot be accorded further legal effect, pending an (adjudicatory] hearing j opportunity," and, that in accordance with the pre-1993 interpretation of the decommissioning j regulations, "the Commission expects YAEC not to conduct any further ' major' dismantling or i decommissioning activities until final approval of its [ decommissioning] plan after completion of the l hearing process." Subsequently, the Commission issued an Order (CLI-96-9), dated October 18, >
1996, which granted YAEC's Motion for Summary Disposition in a hearing convened to determine l whether the decommissioning plan should be approved. Since YAEC had originally submitted the 1 decommissioning plan before the Commission amended its decommissioning regulations, and the i decommissioning plan was approved by the NRC in February 1995, YAEC had been given approval {
to conduct decommissioning activities at the Yankee site per a letter from the NRC (reference ;
correspondence, dated October 28,1996, from Mr. Morton Fairtile to Mr. James Kay). I During the decommissioning process, the licensee removed the major primary components from the plant including the pressurizer, four steam generators, and the reactor vessel. Other '
decommissioning work performed included asbestos abatement, tank removals, piping and conduit l removal, removal of the waste evaporator, and removal of the secondary side equipment (turbine, electrical generator, other components, and piping). The licensee also completed relocation of the control room and modifications to allow operation of the spent fuel pool building (SFPB) without dependency on other buildings (spent fuel poolisland concept). When all decommissioning work is completed, the licensee plans to return the site to a " green field" condition with no structures standing on the sit }
O2 Operations O Facility Tours The inspector toured most of the radiological controlled areas (RCAs) outside the vapor j containment including the primary auxiliary building (PAB), the service building, the radioactive waste processing (compactor) building, the potentially contaminated area (PCA) storage building (a storage / staging area for potentially contaminated equipment and materials), the PCA warehouse attached to the radwaste processing building, and the SFPB. The PAB and the compactor building l had been completely cleared of equipment, conduit, and piping. Decontamination and removal of !
pipe penetrations and pipe chases were complete. Underground /underfloor piping was dug up and removed. Posting and labeling of radioactive materials continued to be excellent. All radiation areas (ras) and high radiation areas (HRAs) were posted and barricaded as required. There were i no locked HRAs in use at the site during the period of this inspection. Areas that were turned over 4 for the final survey process were maintained through administrative controls to prevent re- ,
contamination. The PCA warehouse had a significant number of storage boxes filled with mixed l
hazardous waste. The material was staged in the warehouse while the licensee was negotiating with a disposal facility to accept the hazardous waste. There were also numerous storage / transport ;
containers (cargo-vans) staged in areas around the controlled are t
!
.
-
.
.
Areas inside the vapor containment (VC) were also toured by the inspector. Most of the piping and conduit had been removed in the VC. All ras were posted as required. Housekeeping in contaminated areas was very good. Areas that had previously presented a challenge due to work conditions continued to show improvement since the last period of inspection. Contamination control was evident by the use of " step-off pads", personnel monitoring equipment (friskers), and contaminated area postings at the boundaries. No significant safety or NRC regulatory concems were noted by the inspector during tours of the facilit .2 Current Activities l Most mechanical and structural components have been removed from areas in the VC. Workers continued the chipping and removal of conciete in the shield tank cavity. Decontamination work l was continuing in the VC in the reactor cavity and loop areas. Asbestos abatement on building l surfaces continued in the loop areas of the VC. Modifications to the SFPB and an upgrade to the l
'
yard area crane had been completed to allow the handling of spent fuel cask The licensee was experiencing delays in their decommissioning schedule due to the identification of PCBs in the paint on many metal surfaces. Many painted surfaces inside and cutside the VC contained PCBs. Pieces of painted metal were temporarily stored in cargo vans end storage boxes at the site while the licensee worked with the Environmental Protection Agency (EPA) regarding removal and disposal methods for the contaminated pain Other work planned for 1999 includes completion of the items mentioned above. Also, dives in the spent fuel pool are planned to remove the fuel up-ender and other miscellaneous equipment to make more room in the pool for spent fuel transfer casks. The final site survey project was continuing in various buildings and was slated to be completed in the year 2000 The licensee planned to complete final surveys in the turbine building and the safe shutdown building so these buildings would be available for dismantlement. The licensee had not made any final decisions regarding which buildings would be dismantled in 199 Occupational safety awareness was evident among the workers at the site. The use of protective l equipment and safety processes were observed in all areas. The inspector noted that the site had l recently passed a significant record for occupational safety. Site employees had worked over two l
'
million hours without a lost time accident. The number of recordable and minor injuries in 1998 was not significan R1 Plant Support - Radiological Protection and Chemistry (RP&C) Controls R Exoosure Control Insoection Scope (83750)
The inspector reviewed the controls for radiation exposure through observation of work activities, tours of the facility, interviews v!ith personnel, and a review of licensee document l Qbservations and Findinas A significant portion of the radiological source term (not including spent fuel) had been removed from the Yankee facility. Average area dose rates were typically under 5 miliirem per hour in most areas. There were only three areas at the site still designated as HRAs (dose rates in excess of 100 millirem per hour). Two of the areas were in the vicinity of the Radwaste Warehouse where l radioactive material was temporarily stored prior to transportation to a disposal or processing j facility. The third area was a sump area in the building used for decontamination processes that !
contained high levels of residual contamination from previous activities. Also, a transient area was I controlled as an exclusionary (locked) HRA when a source was used in the instrument calibration facility.
Due to the reduced source term, the total occupational radiation dose to workers was also lower than in previous years. The tot &l occupational radiation exposure to workers during 1908 was 4.6 person-rem. For comparison purposes, the total radiation dose to workers was approximately 96 person-rem in 1995 and 65 person-rem in 1997. Conclusions l
The licensee had provided good controls for radiation exposure. No violations of NRC regulations l and no safety concems were note l R1.2 Control of Radioactive Materials and Contamination. Surveys and Monitorina 4 Insoection Scope (83750)
The inspector reviewed the controls for radioactive materials and contamination, surveys and monitoring through observation of work activities, tours of the facility, interviews with personnel and a review of licensee documents, Observations and Findinas The inspector verified that there was an adequate supply of radiation survey and monitoring equipment. All equipment checked by the inspector was operable and within the current calibration period. Portal monitors and frisking instruments were located throughout the facility for use by workers as they left radioactive materials areas or contaminated areas. Current radiological sunteys of various work locations were reviewed by the inspector. The surveys contained detailed information regarding current radiological dose rates and hazards in the work areas. Surveys were posted at the main control point for the RCA and at the VC control point. Appropriate licensee management personnel had reviewed the radiological surveys.
Radiological housekeeping was good throughout the plant with appropriate controls established to minimize the spread of contamination. Pbsting of radioactive material areas and labeling of radioactive materials was excellent. Continued good performance was noted by the inspector as a result of major efforts by the licensee's radiation protection staff to keep items labele . Conclusions The licensee provided very good controls for radioactive materia!s and contamination, surveys and monitoring during decommissioning work activities. No violations or significant safety concems were identifie >
R8 Miscellaneous issues R Self-Assessment. Auditina. and Corrective Actions insoection Scope (40801)
The inspector reviewed the effectiveness of licensee controls in identifying, resolving, and q preventing issues that degrade safety or the quality of decommissioning through interviews with j personnel and a review of licensee document I Observations and Findinas The inspector reviewed the audits performed by the Quality Assurance (QA) group. The QA audits ] '
documented the review of various areas including radiation protection, corrective actions, radioactive waste, emergency preparedness, personnel training, final status survey, control of special nuclear material, plant operations, adherence to technical specifications, environmental monitoring, and implementation of the offsite dose calculation manual. The audits were performed
'
by qualified personnelin the QA group. Recommendations, deficiencies, and opportunities for improvement were noted in most areas. The inspector found that the audits were very good quality i and brought management attention to very relevant areas of the program. A selected review of the l responses to the audits showed that deficiencies were reviewed and corrective actions were implemented in a timely manner. However, the inspector noted that the QA group was identifying l some issues that should have been identified by the line organizations during the implementation of i the decommissioning pla l The licensee's staff implemented a new corrective action tracking system, called the condition report program, in March 1999. The process was designed to identify, evaluate, disposition, correct, and track to completion any adverse condition. Any employee could initiate a condition report regarding a concem, problem, or unacceptable condition. The program was not intended to include employee concems or minor repairs addressed by a maintenance request. All reports were to be discussed by a management review team to determine the significance of the problem, review the immediate corrective actions taken, determine the need for additional corrective actions, and determine if the problem was reportable to regulatory agencies.
The inspector reviewed the radiological occurrence reports (RORs) that were generated by the radiation protection group during the last year. There were four RORs generated in 1998. Three of the RORs were written to document workers who disassembled high efficiency particulate (HEPA)
vacuum cleaners without clearance by the radiation protection group. The separate incidents occurred over a nine-month period. This is a problem due to the unknown radiological conditions that could be generated by the contaminated contents of the HEPA vacuums. Although the
._
.
.
individuals or the work areas were not significantly contaminated, these incidents had the potential for unplanned radiation exposures. The inspector reviewed the corrective actions for the incidents and verified that they had been implemented, The actions should prevent a similar recurrence of the proble ,c The inspector discussed the self-assessments performed by the licensee's staff with site management. Tours (surveillance) of the facility and work-in-progress were documented by various managers and supervisors and included tours done on night and evening shifts. The documentation of problems and good practices was considered a benefit to the organizatio However, the inspector noted that there was no formal self-assessment program to identify and correct adverse conditions / problems before they became bigger problems. The licensee's manaoement stated that the new condition report program would allow workers to identify some problems before they became bigger issue The licensee also received feedback from the Nuclear Safety Assessment Review (NSAR)
Committee. The NSAR Committee evaluated the effectiveness of various activities performed at the site to provide safety of the spent fuel. Members of the NSAR Committee were experienced nuclear professionals who were outside the operating organization. The NSAR Committee met four times in 1998 to provide feedback to the site management. The inspector reviewed the minutes from the last meeting held in 1998 and determined that the NSAR Committee asked very good questions and provided excellent comments to the licensee's staf .Qonclusions The licensee performed very good QA audits in various areas of decommissioning work. QA auditors were identifying many items that the line organization should reasonably have been expected to identify. This was considered a weakness in self-identification and corrective actio The licensee implemented a condition report system that should allow employees to report conditions adverse to safety or quality. Although the new reporting system should help in identifying ,
problems, the inspector noted that there was no formal self-assessment process to identify issues before they become a bigger problem. The NSAR Committee continued to provide excellent oversight and assessment comments to the licensee's managemen R8.2 Cold Weather Preoarations Insoection Scooe (71714)
The inspector reviewed the licensee's program to protect safety-related systems against extreme cold weather through tours of the facility, interviews with personnel and a review of licensee documents, Observations and Findinas The inspector reviewed the licensee's procedures for protecting the spent fuel pool systems from extreme cold weather. Procedure No. OP-2115, " Warm or Cold Weather Operation," provided instructions for preparing the plant for cold weather operation. The licensee implemented this procedure in October to prepare the plant systems for winter weather. The procedure included a
-. - _ _ _ _ _ _ _ _ _
.
checklist to ensure that all items were reviewed / implemented. Procedure No. OP-5751, " Freeze l Protection Inspection," provided direction for the inspection of freeze protection equipment to ensure it was operable. The inspector found that the procedures provided adequate direction to workers to provide protective measures against freezing. In addition, the operators had inspection items on the operator log sheet to require examination of the equipment during the tour of the facility on each shif i The inspector reviewed the adequacy of the cold weather program and determined that it had provided for the safety of the spent fuel pool systems through the coldest part of the winter. No reports were generated to indicate the failure of any systems with the exception of a frozen line on the radwaste processing skid. Although the skid was not used for the spent fuel cooling, it was used to process radioactive water. The line had frozen and burst when an outer door was left ajar during l cold weather conditions. The small amount of slightly radioactive water that leaked was contained within the processing area containment. No water was released to the environment. The inspector l reviewed the corrective actions implemented by the licensee's staff and found that they were adequate to prevent a recurrence. No violations or significant safety concerns were identified.
The licensee had performed an internal assessment for compliance with a recent NRC Information Notice (IN). NRC IN No. 98-02, " Nuclear Power Plant Cold Weather Problems and Protective Measures" was written to ensure that power plants addressed potential common-cause failure l mechanisms of safety-related systems from extreme cold weather. The licensee performed a l review of previously implemented corrective actions and the applicability for decommissioning.
Some actions were still applicable and the corrective actions were incorporated in the existing procedures mentioned above. No other corrective actions were determined to be necessary. The inspector found that the self-assessment was appropriate and provided an adequate review of the potential problems from extreme cold weathe l The licensee had also implemented some recent upgrades to the spent fuel pool building (SFPB) to help maintain moderate temperatures. These upgrades included more insulation on the SFPB walls and new electrical space heaters. Conclusions Effective procedures and processes to protect the safety of the spent fuel du-ing extreme cold weather were implemented by the licensee. A broken distillate line on the radwaste processing skid was attributed to freezing conditions and the licensee implemented effective corrective actions to prevent recurrence. The licensee's self-audit for Information Notice 98-02, " Nuclear Power Plant Cold Weather Problems and Protective Measures", was adequate. The inspector noted several upgrades to the SFPB that will enhance protection from extreme cold weathe ~
-
.
'
'
IV. Mananoment Meetings X1 Exit Meeting Summary The inspector met with the licensee representatives denoted below at the conclusion of the on-site inspection on March 18,1999 and via a telephone conference on May 3,1999. The inspector summarized the purpose, scope, and findings of the inspection. The licensee representatives acknowledged the inspection finding X2 Management Meeting Summary LI:ensee representatives met with the NRC staff in Rockville, Maryland on April 7,1999 to discuss proposed changes to the Yankee Nuclear Power Station Security Plan and other process simplification efforts. The NRC staff was briefed regarding the licensee's plans to implement pilot programs for corrective actions, quality assurance, and security processes. Other programs would be integrated to eliminate redundancies and simplify responsibilities. The licensee's staff restated their commitment for safe storage of the spent nuclear fuel and to maintain the safety focus consistent with the risk involved with these activities. A copy of the licensee's hand-outs are included as an attachment to this repor ,
>
.
.
PARTIAL LIST OF PERSONS CONTACTED q l
M. Atkins, Licensing
G. Babineau, Support
W. Blackadar, Radiation Protection Engineer E. Cummings, Lead Engineer C. Ellis, Radiological Engineer R. Grippardi, Quality Ascurance Supervisor
E. Heath, Radiation Protection and Chemistry Manager
S. Litchfield, Health and Safety Supervisor S. Mullet, Radiation Protection Technician
D. Reid, Site Manager
M. Terrel, Assistant Site Manager
F. Williams, Plant Superintendent
R. Yetter, Final Status Survey Manager
Denotes those individuals participating in the exit briefing held on Mr.rch 18,1999 LIST OF ACRONYMS EPA Environmental Protection Agency HEPA High Efficiency Particulate i HRA High Radiation Area !
IN information Notice NPS Nuclear Power Station NSAR Nuclear Gafety Assessment Review PAB Primary Auxiliary Building PCA Potentially Contaminated Area '
QA Quality Assurance RA Radiation Area RCA Radiological Controlled Area ROR Radiological Occurrence Report RP&C Radiological Protection & Chemistry SFPB Spent Fuel Pool Building VC Vapor Containment YAEC Yankee Atomic Energy Company
_
i-e
.
INSPECTION PROCEDURES USED lP 40801: Self-Assessment, Auditing, and Corrective Action IP 71714: Cold Weather Preparations IP 83750: Occupational Radiation Exposure ITEMS OPENED, CLOSED, AND DISCUSSED Ooened NONE Closed NONE Discussed NONE I
!
l i
9
1
,
l i
r N
p A ,
g n
O I
i M
t e
e C
T N A y
n R
N a
O C p m t o
GIF99 C c
je o
pr NI 9 i c
r g n
I L1 t i n
TP7 E
,
l E
c e i i
s o
s E MI L c m
m i o IR m c
e MSP S A t
A o o s
e u
C S e e
v RE k n
'
%'
NC Y a
O 3 ,
_
._
x_
.
R P dj
.
_
.
_
_
.
_
(y
.
_ .
. -
-
-
. .
~
._ ,
-
9
,
l i
r p
A ,
g i
n t
e e
M w C R
i e N r
v e .
v
.
t c -
.
-
je O s o
r a mt u P
g n
m
%
d a a s e
i n
o
%
-
-
_
n e
r gS t g n
i i
s s
-
-
-
-
-
o
_
m a
s g r g m o
_
.
.
nh -
A c
P e nC
_
_
i D .
_
-
n S P
.
.
n oio m N Y
.
.,
-
,
oi s a
-
t i
t ai s r y .
_
_
c ic uf i mgo r a
-
.
._
.
c
.,
-
mr
.
_
.
-
d l m
-.
-
-
o p o P
-
.
_
_
mce
_
r m _
A u
-
.
.
t _
_
ni S D QS
_
__
I
- -
-
- - -
_
_
.
_
.
..
9
1
,
l i
r p
A ,
g i
n t
e e
g M C
r n R N
e g r i n
a e o O n g
a i r e t E a n s
s g n n CMa r a ta t
i c e nl u e o gMa g m j
,
o t
n m a s p r
i t
c d e i n
ni t
e n a o c
Mno i g
n n
u i
s e i oS t s
Me y D i gC n y i o
s s
d r s n s t i
m P a t A
o ,
i mt ss i
r ni r e u m
o t
r n
C A
H miuQ o AS c
s c
e a s
,
i L
c
,
S c
e o, s
e c
I s s ,
m e
_
Y,Dl a n
_
,
l
,
i e r i n a
_
_
_
_
_
s e v u kt g i
,
r r o r vi d a
r e a Be r A o DR e T G h gl l M
.
e d i pa i r g n nk n e n r e o oi a s 'a e r DDMS JoMMG
- - - - - - - @y
-
.
_
( 9
9
1
,
l i
r p
A ,
g i
n t
e e
M n, C m o R
N a i t
r g c o A t c
e je r v o pr P i t
c s g
n n
i n
e s n o i
o r r mi t o i i
s s
t o) a ac m m
_
a c
Cy t ( i ri f gi o
c e
_
_
_
o i r o c s f
i mu ac r e p e u
e P l v S
p r gS d l s
s e
a r m od r t e
a i c mu a d hnR i
Pn
.
r e S t r
A ge c A g
o c
o e S r r l
i oat n T F P P PQI - - -
@y
.
.
- -
( 9
,
s r
). o s
t m i v
n a r e
r o g o
p u
C ( r S s e ks P o c r s n T u iR m o y o a
r i
t i
l t s e i e
t g a c
i b RS -
i d
o i f xe e n r c O i t l l P p e F e g c te oi nj n i mn a a r n P ia i
o S il ir p ph t _
t r m a f o moi o pWR r e c
_
p i nC o A t
n e z
f i n e i
_
.
.
_
_
a de n
_
i i t
.
_
l t s p
.
at ni i g vi v s n o _
o c m ia t r o e :
oMP
_
i CR S M - - -
.
d e
-
_
- - - R i S hMxMEMsE t
i
.
e o c a x c a k e r l
.x l x P m v e u s s d e p e t d r l nha o o o o i i i
t o n n se n e ps s f i
f 6 Af Af e c owe l r r o er o c r
t a s e a ma mv s e i t i
ok ba o
bs e o fs ud e op u e n s a n nn p v e a dc a o dt a fu r P
nirl y mr o
<m( y e t
a f b u l l
g e e i
s 3 e r 0 s v l
f c o 0o i
0e a or 2n i 0n t os l r n )f t a m t
e t (
a mge < th e
i gnf f C a v e
0 at o c
t i
o n
t
0 n n a 1 .t s t r )
i t e n h m e
'
c -
R m MAe a v e x e
-
vNw<S nd o at eg
-
t e
a i
s k
S i
m
.
g r
a t s e r p y d P e pl g s e
n e g i
5ms n t r
s i f
o n a p e
r n b a mt e e i c
a ba l s
-
a s oke fu c a
-- a r
i t
e i
s ve u e ti ve t
i e
a i n
r a uwp f
p l o
d d p e a o (
o C n
-. o i i l i
.
s e
v i
d d
f t
e r
l t o P r
u u e n i-i r
a t a l
e l
q r
e p
m ).t g o
e p u i- < d o o i e
r r
- 1 s e
o l
r e a t a
-
d u
< d r t o
r e m m1 a (
r e 2 i
n m<
a C
-- mm
/
h r e d
o i n
t
5
o n
r w a
.
m n i n F t
.
y
/ )
, r
- .
) l ll
-
y@( - - - C B F AAF u e i np l u r g
ia p l e r e
n l n
it S
r o Ml xjoa P n t
D e
n a io o c g g e
mr a S l
I A
c o S s t y s t t e l a i m
Oy m-m a l s v e
s g f t
e n i o e 3 d t
, s R 0 m i e i c
o Oe 0 s s s m
m f mP A s i
e e i
s s B d r n o u d n
i o i s
n i
n ia l t o C i g
p r
d i
n in o
n n o n g
jo e g e l p m
c t
D Oo n S e n t m S
- e n a t
o t N
R C
l i
t i
i t
e s
R u
s M e e
e o g
t i
n n m
,
A o p
r i
l v
e
,7
9 d
9
.
y -
F DT
-
DP E
-
VT u t
D e
e r r r s a u u mn a y p e t a p r c o sf Ca r b l
o r
b i
n r
e o l
e a a i i
t i r s k
t i
s h Ce o
A c
m o F o n B t m n u St n I S t u i i Y
N P
Oe f
l o r OFS a
i iv i l
n di ti s
s T a f r gn e S I e i D
e Ro e
g e p S I s o c
o mD Aenp mSh D n a yr m i e e m
i s i r
e t F
l e l m n si o niC n a a
u mlRo g n
i n g s Ce l e e n
l i
S o t a mo g k i P S s n P t
t jo r
e c
t r
u s
r o t o t iv o
o n a t
t c u l n a l u t c u
r t
i T s e o e a (
n N
R s
m C C
M o g,
e e
t i
n n A p r
i l
)
,7
9
9
s * - !
n
"
.
i
_
D
" 5
" 1
""
1
!
e n
c
_
V " t o
C i D _
E C
O NE i
N n u
O DT E R I
T EEE A7E EN t
!
m m
=
' m m_
i
=U B B u dS ER L U n MB E I OTWP EU L V
C 7D I
WD i
7EN S O E E
I NG n
!
i Y
N H
E B
U H
B U
I L
I
,
D E
v i
i s
P S
I S
F I
,
R E
D DD I
N M G O I
M O
I I
T i
i s
s i
s i
WCI O D D o S V E E I 1 O
D O A
l M
OO M N 1
e P
,
N L L R
!
n I
S T T E i
c T R
D O I P i
o O 1 U N N i rSFT m S F
P R C
H O
5 i A
n
S N m
i C S
s s S 5N i
D F E
g
!
E s
i OC WR I
C O
R
s s
o N D
/ I v
i n @'CW R AvM E
S F
S N S
i n
I T
E OV i
_
n g OS R F A s
3S iE L _i P uE lR V I
P S _!
t a
5R I E s r aMOP 7V C R u s
jo I
C E E mI A E B M i e sSeSGBC D B U P
E D N c =P F
S E U I
.
D A I
t u
= T L i t =BU R u M O D GN OT D
I I
n
=n L I i
=D u i
=
Ea T OD D E N I
!
U s
I t a
R O C E7A W70 D E
S N
E M O N
r i
_
A E O i
C ST I S
wR0 T
O R
S E
D u I
S u
O DE N
S I
l mE O O N
M V
1 (
C n RC U P A
_
v N P P
O S
ON A L S
i
!
R O A R . I I
o I
C T N
B U
l i
_
M T R
I U b n
e U X e C I
N n t O i i U D n n R E i
g E !
, D M s O
A E
MU i
i
.t p
r i
l O DO U
D O
N 1
)
P ,7 N 1
g a 1 e 9 1 9 0 9
.
E
.
.
s -
D e
C o e H
c o
n t
r a
Mtal c P ah n
t e O i a& l d R gS t
o C e r a ef D
m t
E y*
&
S o N m_
r O C S o p Mon A 1 t
h e as R e
r r
a nt r C ti I
a I a o g m p n e t p s r n
i n
i% _
Y N
o v
e d
s _
_
_
P S
c o
t a
c n
r S
S p
u e
Mic a e n
L s
i%
o e r i P a n
~Cimn I
t o c g i s C o aY D r ur tnl en a I en MM a aD h .
e
_
i rg e nt n n t _
y d fpk a aw ae _
e Ogg c n * perei v Ene xy o A t
er/
r (/ ii e cpi a ur v iaMcA l'
ie m%
t t m M R o n n st >..
s a no
)ga vsa edi -
n P Oe E m
i ai t
n M/
aC nh Mn E
g er sin Sg f t e if nl c e ot i cat s a n ] ae gn r I ai nn ae f
e, _ en r do r
s g
I n ei ge r _
c r ts ei i e r o y
r gn n i
[ *
gn
_
O S
Meti aS n
Si t
eAs
_
.
P a er 1 r
jo e
g v ei r c e
s
Ms asi nt a a n gt e
r I
r g
c *
a
-
t C or C ~~
n oT or
^
m e a u di ~
n in ni I
c an ,
~
-
a tg o D Q m%
t o
i r e u n O c a s A O wM ~ i ytlD MO Sn e-r S I Qa .i As at n
~
-
Aer s c i
a e nr as v
z N
a vi sg .- st g ig it ce e
ie2 uor or r eh r
R s n i
n a
n t
C * g* c e
M * t e i%
o e
t i
g, n
p A
r i
l n
P ,7 g
a 1 e 9 1 9 1 9
y( - - -
Q
)g c E TaEns u u v r apoDAEp
- -
o dt a a
l r l eQs s i i e u r s at c Vb t na t t a
iP t
Aub r l a i a
l e ls r
i y i
o c ns h on l
wgf n o c e a n e Rmh e e A l
dp od n a s e o l
a n t
f iP r s m r oYo c u g a tr t
s u P
S v s e i l
i s e r n Ya a r D
e omy l i t o me t
a k ps nT a c
o fp e ( Dt e li ko ep n c
m i
m s
r i
s l
i f
i x
i s
De Qc i
n e ci e
s kc t
Ao a P
i o
Pm19 i
n i
a n l g
n t i
o a )
m9 R r P
r o n s
i i
s s
8 e p
g o
j e i m i o o c
t n
i l
n r r
a r
g i
n t
f a 9 f o o
9 r Q r m N
R m u Y C
M e
e b
a t
o a
l i
t a
n H
i t
s a y s n k i
g, n
e e t p
A r
i l
d o
e o r
,7 I n y
.
( c
- - - - -
y& naoMap s r s oc s
ngiRMM I
e a a e r nd t
r n i
s c s se e a
iu f
c i
n i
n D ot t t Q
i l
aims s c e a a e e e a a ii an n n n d n n A dap t (s fo t f D P
) ic
.
e u imo t
e c Q F Qp i u
m u o r ,. s misn A oS P a c o s s o P ci S
D e
c lp ir t
y i on r
rp t
r a n p
o n
um sp o a e e t viu r / l m
m i
s Ae s
t c t
i r
f o
e bl i
s k
Ofi s
i o
s uv l
e v e r b
u i
c hic e a n s i i
n r e a m r a ng i
g al c a d n ct i P
r jo no c f t
i n e n
d i f to i
e e o c e i vn c
t oM n e am o
n p mcan e va e n no l l t sPr s yo e
r a dn i a o N sg s e c R i g e s t e o r e t i c C
M hme l r i s s v e s
e e
t i
n t f- i n k a f
i t
i s g,
A n
t g e t
e s
p r
i l
y
9
~
O
_
- - - - - -
(& pAAUCAAI p nop p p dnp e e e tr e e t yc p gi C
p h il P
o n n r o n n e d d 1 l d d e S x x 0s xiinx ii t a
DC Cf
- : FroBAr : :
Ct e i D m
P AY7p RS AQe t m e Q a r S
D e
d mk n 2e nd d Aina t A c
o i n e t
Fo i
t i MD P m
e a e S m
i s
s i
s t C un e a n a
t a t i
o r l l g
i r
n a a l l s
g i
n t i
ve s
s S
o Me t u P
r i
f a r n e m c t
jo e
i a
g a n u c
t Cc o a eg t r
n t
i o
e Q e t
r n Amu c e a N
R o
l s t i n l i
C s vt i
f i
M e t c et i
n i
e a t
g, s i p
A o r
i l
n .
1l
_
-
O
N 0 o C D F O R A 5 P ,0 A A i Q
p p pl p e
ci a n di u
ti o x n B a
l P
a i
- - - - r
0 t Y
ti al D
O C
F R
y N A A
P A A 1 P p p
p p
p
8 P
,
I S e e p
e C A S
u D
e n
d n
d n
d r
i t
e p
p p b
r o
i i i x x x r l
a ci c D C A ai a t r
o t i
o H D m
m n O A F g i
s C P
P S
A R r s
i o
n i
o n
pl e
r
0 C
y ol i
c a
gn P
t e
D O
F R
,2 m
r A S
I S
jo P u A
e p p b
t c p a t l i
c a
r t
G r ti o
n u c
t N
R C
-
R
- -
p S
-
O D
A u M F a
d e
t n P G
r a r g
e e
t i
n r
e o
i P
r ai ti o
n P
a d
R w
u F
el W
A s
G u
d e
d Q
i e
A
, i t
e a d p
A c r
o t
s t
e t
a n
P r
t i
e e S c i o c e l n t t
o
,7 oi r a
n g e
m
O
- - - - - -
y@(,1AcACARrErS 0 d a dl a Neqis Cd kd r s f el umpm ei Fg So iop s a iIc i Ru t ody f
Su s rnni e a s l
f D 7i 2da at
,
rdgi a
t r ac no mt e e iy b
ia Q Sngi e o d uc n e a dmnr t e l r i i A
be pf a
l d rms di di us t d e s t
P a o m n r e
s o r r mQs a Aoe t t
m d a
e a P r
e c
o m
t d Gyr nP a a r t g
dn n c
y mo l
i p c epy t n m
i s
s a
s mp c o o f
e o s
i o k e ciaR l
a o n
i gn s n a s e kg d r
g e p
t o
t c
t is u m a d r
r o o toal n C
i jo
-
e a n n rt n i z
c t g t a o i s a h e r g r t t c ol ey a r o i
a o
n s
f G
u t
i v
n a n g
N R
s o i e l
C M
i d
e r d e
e s
e e
r d s t
i r
g
,
n i n y a p
A g n r
i l
d
1li ' !
l l!
. ll l
.
.
.
.
.
s - - -
I S N mu p b R l
e mC miC e
t t o S n o m c t t r h m h Y e v
e u e N
P i Ni n d S
D e
s e
d Ra c u l
o c Ct i e
m D - o m
i s
si QJ n s o f
o Aun -
g n
P n
i P e
-
A p
A c
t jo- A r i
t i
e c
t u g
l v
i u
s t
i N
t e
s R
C M
e e
t i
g n
,
p A
r i
l P ,7 g
a 1 e 9 1 9 7 9 I!
.
.
.
.
.
-
_
- S i
MImeRRAm a
ip g dg e l i p n
t r
o uu c l n l
i f
a i ve a t e S i c
n a S Ey oUf r
n e a
t f t i t
a f n y o f
f i
c uc i
Be F n
,
Ae n r e o ds c P S n c na dy e s s
u r o
u s yr P A Cg r m u n Ao n a b d m l
i c
Cf e E
f mim d
i n e s
s t
a r
y o c in s
n f
t i
t r
t iv a W d e t i i e
n n v t h
c e s
e e s R Ai n s d k s
.
.
-
&(
Y Y
a N n
k P e
e S
m S
-
P S A D
e t
o E c
o m
m i
c C m
i s E U s
i o
n i
n l
e c
t R
I -
g r P
r i
c T jo e
c t
C o Y -
m p P -
a n L y A n
C M
e c
N d -
n, p
A r
i l
,7
9
9
-
_
i
.
O G - - -
.
Q VWS e e h
i m
i c ap p l e o l i f
n ci Bs a a t r i M r o P i e n S
D e
c r o f
A _
o m S G _
m i
s e
c E _
s i
o n u r N D
i g
n i t
P r
jo e
c y
P A
t l
a n
N R
c M
e e
n n,
Md I
- 7
, 1 m 9
.
,
.
~
.
.
y - - -
S r P I
-
Ne Re q r S
e M
. ] AF c o c c o d e up o c
u P e u Vf i r o i r i
L I
s s n e si t mny F i
s t o a e I a n l eg c u
t S A P ne o C Y
hp o e r
e o r t l n A N
P S
r i n a t s e s i mr t T
D z t c
f r a I e
c a
t F u t on i
c t
O o i e N
-
m m
o n
e l d mat i
o r
i s
s p P Alio n O i
o n
r o
i t
r c n e o F i
n g e no w S g
P r a
a s f E r
jo b e o e
c m o F w C t
p a u F n U p n Ds f R l
i d I e
s a i r T r e N
R t
o y a Y C
M C
o r P e
e n P m t
i n
g, t
i n
u A s L p
A ri e
d A N
l
1
9
,
.-
.
.
.
y
.
' m i m
e s
! ii ]
a Y g N
~ I P ~
~
.
g S
&
_
S ,
_-
I
!' . B !! ,! !.
I!l,j
' 2> _
D _
T i I
r e - 'P:I, _-
c o S i,!mW *
1-I g5 a.C]I )l W" g-
-
% oc E
,
.
- E - m r
_
'
. .
a I B
-
'
.
s m _. .
.
e s .
p., j
" - -
g ;a(/
i . . e s
e ,-
s ~
'
- s ,
P
. _
_ s s
i
_
.
-
_..i o '
' ,.
o 1 ' - ( ,p %
'
_
m3 " !-
n -
- N' %,
L i ,
Md3_ ~ N, ' O
- '
- -
-
i
" '
gn
.
'~ b-A.>:.F. / .
.
l e a ; d' O m- ~~
A
- -
- -
P r
_
_
i g .ji
!} _
-
..
.
jo
_
e ct
~
[Z,""l- 5-
-
""
=
=
=
.W o
'
N
~ : I
- '
~
- .
.
-
N
-
N R
C M
e e
t i
g, n
p A
r i
l P ,7 g
a 1 e 9
4 9
.
.
e
.
'
_
.
_
k~_ -
Na B
-
d4qh4g4 kq i- < S
.
m P Y
N P m E S
D e
=
'
m N c
m o
wm
-
T mi s
s
,
m s
F i
o n
i
'
U g
n P
,
,
E j
r o
e
,
L c
t .
-
P I
N .
T R
C M
e et i
g n
,
p A
r i
l
1
9
.
-
.
-
S g( ybT r r S e e p I
m I
M P
J a i
dc r u le L un nif a r I e gn t
ey i
t m e F I
d n
9a a P t C 9n d na l a A M
P
i dn t i
o T S
D e p mian n r d n I
O c l e o
m e viS N m
i s
mimc e ep h O s
i o n wle e F
n t d i
gn a
t i
o mu e l S
_
P r
jo n n e E e
t i
C c
t t
o g n
U _
b e
p r R I
_
c o -
o c e T N
n m d Y c p l
u r P u
n, e
t e
s L
-
-
e M a r A -
g P
a e
,m e N 6 m
.
.
-
- - D r
RAAr c
e l p l
e ap Aaf op cp t o l t l g wioi e r e N n s s s is z e t s
t t U e l o i l o R s e l p
u c d r he E t y or s i G
-
e o
v e c a dm-l a 1 W f i u pmkg s
i nne 4 E n l o a tn
7 A a
mmp r e r Py a
l G P e e n
o o r t
s h u O d t a
l s
5u t i d N o a wt 0 a io t
l d
n S t o r i c wc c n ga e n e h o e n mf sp e 1 e o n 0 w C e r
F R
3 P
g a
e
'
L o
o
- -
R e
- 1
q UdUp r U9 u n ef n on 5 a e a p a r nr e r A i
r e
s ms e e mr e t m n y e a d od d Us r s
s s y l
W s
E t
S a e a t t a i Nu cusu t t t u s A
Rs riw i
s wy b
P Cs y t
O i i e n i l l
l l S xe h n n a t
o o n N p
mp e t e
n t
e n
d i
a S
(
u t
i b d a
d a C o
n l
i c n n o t
i n
g e
r g
e r
n o t e t l i
.t
)
1 r h f e e e 0 s c
C t
o o r
F m R m o
3 n u
l
.
Q
.
- - - -
p l
a eVwDImoCC
& nhic )l cp ae l
f r o n
e a
t e l I
) t s s me e r e
, l e bmf a d
9B e e uc e t p 9a r n l e al t e d v
e 6r r
i 1 e 9d d S n t V e
s e 9 Sa o
.o r 2)
e
e np c d e h i
r (
.c
. u i
nu f uir r a c
l m
i s
l e c e t f i a t e l l s
i o
n m ued y or i o B
,i a d e S P r ,sn a e k l ae r r i n de nco O r g bc u i c
e f
o r ,J m c
t e
r o
r o
miunmo by t
e e e b
p bP l 1 n r 9 d n l a
c e r
aa s 9 a
9
- a t ,n t
c 2i
~.
t o 1
-
~
i n n s
- ,
1 g
9 9