ML20065A558

From kanterella
Revision as of 21:36, 31 May 2023 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Advises That Revised Electrical Equipment Qualification Manual Will Be Issued within Next 2 Months
ML20065A558
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/07/1982
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Clark R
Office of Nuclear Reactor Regulation
References
LIC-82-317, NUDOCS 8209130258
Download: ML20065A558 (1)


Text

Omaha Public Power District 1623 HARNEY W OMAMA, NESRA5MA 68102 s TELEPHONE 536-4000 AREA CODE 402 September 7,1982 LIC-82-317 Mr. Robert A. Clark, Chief U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Operating Reactors Branch No. 3 Washington, D.C. 20555

Reference:

Docket No. 50-285

Dear Mr. Clark:

Environmental Qualification of Safety-Related Electrical Equipment at the Fort Calhoun Station Mr. E. Tourigny of your staff requested the Omaha Public Power District provide a letter documenting the District's response to questions that were discussed during a telephone conversation on September 1,1982 with Messrs. Patterson and Short of the District regarding the subject issue.

Specifically, Mr. Tourigny requested clarification and/or confirmation of information provided on pages 6-119 and 6-120 (System Component Evaluation Work Sheets for auxiliary feedwater solenoid valves HCV-1107B and 1108B) of the District's letter dated April 2,1982. The District stated during this c'inversation that all qualification information provided on these meets is correct, except the " Note 1" coment on both sheets, which incorrectly details that these valves are normally locked open. The District has revised these SCEW sheets accordingly and has completed a review of all other SCEW sheets for other such inconsistencies and typographical errors. A complete, revised Electrical Equipment Qualification manual, which will fully replace the District's last complete submittal of August 26, 1981, including revised pages 6-119 and 6-120, will be provided to the Commission. The District expects to issue this manual revision within the next two months.

S nce ely, 8209130250 820907 PDR ADOCK 05000285 W. C. Ones b

P PDR Divisi n Manager Produ ion Operations j

[ f WCJ/TLP:jmm cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C. 20036 Mr. E. G. Tourigny, NRC Project Manager