Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
LIC-90-0705, Forwards Suppl to 900906 Application for Amend to License DPR-40,making Administrative Changes to Tech Specs. Justification & NSHC Analysis for Changes Encl | 17 September 1990 | Forwards Suppl to 900906 Application for Amend to License DPR-40,making Administrative Changes to Tech Specs. Justification & NSHC Analysis for Changes Encl | |
LIC-90-0745, Responds to NRC Re Violations Noted in Insp Rept 50-285/90-32.Corrective Actions:Enhancements Made to Facility Mod Procedures & Engineering Instructions | 17 September 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-285/90-32.Corrective Actions:Enhancements Made to Facility Mod Procedures & Engineering Instructions | |
LIC-90-0717, Forwards Operator Licensing Natl Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07 | 13 September 1990 | Forwards Operator Licensing Natl Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07 | |
LIC-90-0716, Forwards Ref Matl for Preparing Reactor Operator Licensing Exams Scheduled for 901113.W/o Encls | 13 September 1990 | Forwards Ref Matl for Preparing Reactor Operator Licensing Exams Scheduled for 901113.W/o Encls | Job Performance Measure Generic Fundamentals Examination |
LIC-90-0740, Forwards Rev 0 to EA-FC-90-062, Diesel Generator Upper Temp Operating Limits,Engineering Analysis. Both Generators Operable & Will Perform Safety Function Consistent W/ Specified Ambient Air Temp Limits | 12 September 1990 | Forwards Rev 0 to EA-FC-90-062, Diesel Generator Upper Temp Operating Limits,Engineering Analysis. Both Generators Operable & Will Perform Safety Function Consistent W/ Specified Ambient Air Temp Limits | Safe Shutdown Temporary Modification |
LIC-90-0741, Submits Plan for Replacement of Remaining Two Control Element Assemblies Which Contain All B4C Pellets | 7 September 1990 | Submits Plan for Replacement of Remaining Two Control Element Assemblies Which Contain All B4C Pellets | |
LIC-90-0440, Forwards Application for Amend to License DPR-40,revising Tech Specs to Make Administrative Changes | 6 September 1990 | Forwards Application for Amend to License DPR-40,revising Tech Specs to Make Administrative Changes | |
LIC-90-0667, Responds to NRC Re Violations Noted in Insp Rept 50-285/90-30 Re Inadequate post-maint Testing Instructions. Corrective Actions:Maint Work Order Written & Performed to Tighten Actuator Diaphragm Bolts on 900529 | 4 September 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-285/90-30 Re Inadequate post-maint Testing Instructions. Corrective Actions:Maint Work Order Written & Performed to Tighten Actuator Diaphragm Bolts on 900529 | |
LIC-90-0712, Forwards fitness-for-duty Program Performance Data for Period of Jan-June 1990 | 31 August 1990 | Forwards fitness-for-duty Program Performance Data for Period of Jan-June 1990 | Fitness for Duty |
LIC-90-0683, Forwards Responses to Recommendations in SALP Rept 50-285/90-24.Util Currently Developing Corporate Level Procedure to Provide Guidance on Operability Determinations | 27 August 1990 | Forwards Responses to Recommendations in SALP Rept 50-285/90-24.Util Currently Developing Corporate Level Procedure to Provide Guidance on Operability Determinations | Systematic Assessment of Licensee Performance |
LIC-90-0627, Responds to Generic Ltr 89-19 Re USI A-47 on Safety Implications of Control Sys in Lwrs.Util Reconsidered Original Commitment Noted in & Does Not Plan to Implement Automatic Steam Generator Overfill Protection | 22 August 1990 | Responds to Generic Ltr 89-19 Re USI A-47 on Safety Implications of Control Sys in Lwrs.Util Reconsidered Original Commitment Noted in & Does Not Plan to Implement Automatic Steam Generator Overfill Protection | |
LIC-90-0670, Forwards Fort Calhoun Station Performance Indicators for Jul 1990 | 22 August 1990 | Forwards Fort Calhoun Station Performance Indicators for Jul 1990 | |
LIC-90-0662, Forwards Rev 1 to Monthly Operating Rept for June 1990 for Fort Calhoun Station Unit 1,for Proper Distribution | 22 August 1990 | Forwards Rev 1 to Monthly Operating Rept for June 1990 for Fort Calhoun Station Unit 1,for Proper Distribution | Boric Acid Temporary Modification |
LIC-90-0673, Retransmits Original Response of Util Responding to Violations Noted in Insp Rept 50-285/90-25.W/o Encl | 22 August 1990 | Retransmits Original Response of Util Responding to Violations Noted in Insp Rept 50-285/90-25.W/o Encl | |
LIC-90-0636, Forwards Results of 1990 Refueling Outage Inservice Insp & Rept for Repairs or Replacement | 13 August 1990 | Forwards Results of 1990 Refueling Outage Inservice Insp & Rept for Repairs or Replacement | Hydrostatic |
LIC-90-0591, Provides Info Re RCS Leak Detection Sys to Detect Leaks from Primary Piping Sys to Containment,Per Generic Ltr 84-04 & USI A-2 | 13 August 1990 | Provides Info Re RCS Leak Detection Sys to Detect Leaks from Primary Piping Sys to Containment,Per Generic Ltr 84-04 & USI A-2 | |
LIC-90-0631, Responds to Generic Ltr 89-15 Re NRC Solicitation of Utils to Voluntarily Participate Emergency Response Data Sys Program.Util Prepared to Work W/Nrc to Investigate Actions Necessary to Implement Program at Plant | 8 August 1990 | Responds to Generic Ltr 89-15 Re NRC Solicitation of Utils to Voluntarily Participate Emergency Response Data Sys Program.Util Prepared to Work W/Nrc to Investigate Actions Necessary to Implement Program at Plant | |
LIC-90-0485, Confirms Interim Resolution of Identified Problem Associated W/Use of Input Variable for PORV Opening Time in Calculation of Low Temp Overpressure Protection Sys Setpoints | 7 August 1990 | Confirms Interim Resolution of Identified Problem Associated W/Use of Input Variable for PORV Opening Time in Calculation of Low Temp Overpressure Protection Sys Setpoints | Boric Acid |
LIC-90-0645, Forwards Application for Amend to License DPR-40,making Typo & Administrative Corrections to Tech Specs | 2 August 1990 | Forwards Application for Amend to License DPR-40,making Typo & Administrative Corrections to Tech Specs | |
LIC-90-0647, Informs That Tl Patterson Assumed Position of Plant Manager, Effective 900801 | 1 August 1990 | Informs That Tl Patterson Assumed Position of Plant Manager, Effective 900801 | |
LIC-90-0659, Advises of Plans to Achieve Operability of Third Auxiliary Feedwater Pump by 900810 | 31 July 1990 | Advises of Plans to Achieve Operability of Third Auxiliary Feedwater Pump by 900810 | |
LIC-90-0449, Forwards Rev 1 to EA-FC-90-037, Control Room Habitability Evaluation for NUREG-0737,Item III.D.3.4 | 20 July 1990 | Forwards Rev 1 to EA-FC-90-037, Control Room Habitability Evaluation for NUREG-0737,Item III.D.3.4 | |
LIC-90-0588, Provides Notification of SPDS Implementation at Plant,Per | 19 July 1990 | Provides Notification of SPDS Implementation at Plant,Per | |
LIC-90-0585, Forwards Simulator Malfunction Cause & Effects | 18 July 1990 | Forwards Simulator Malfunction Cause & Effects | |
ML20055D935 | 2 July 1990 | Forwards Fort Calhoun Station Performance Indicators,May 1990 | |
LIC-90-0564, Forwards Updated, Position Paper Re Seismic Capability of Welded Steel Piping. Documentation Demonstrates No Generic Thermal or Seismic Safety Issue Exists for Welded Steel Small Diameter Piping at Facility | 29 June 1990 | Forwards Updated, Position Paper Re Seismic Capability of Welded Steel Piping. Documentation Demonstrates No Generic Thermal or Seismic Safety Issue Exists for Welded Steel Small Diameter Piping at Facility | Design basis earthquake Earthquake |
LIC-90-0522, Forwards Revised Response to Notice of Deviation from Insp Rept 50-285/90-02.Corrective Actions:Cable Trays 5-4A & 5-4B Reworked to Neatly Tie Down Cables & Remove Crossovers & Engineering Instruction GEI-9 on Electrical Sys Updated | 29 June 1990 | Forwards Revised Response to Notice of Deviation from Insp Rept 50-285/90-02.Corrective Actions:Cable Trays 5-4A & 5-4B Reworked to Neatly Tie Down Cables & Remove Crossovers & Engineering Instruction GEI-9 on Electrical Sys Updated | |
LIC-90-0566, Forwards 1990/1991 Statement of Cash Flow from Operations. Cash Flow Statement Deviates from Reg Guide 9.4 Due to Util Being Political Subdivision of State of Ne | 29 June 1990 | Forwards 1990/1991 Statement of Cash Flow from Operations. Cash Flow Statement Deviates from Reg Guide 9.4 Due to Util Being Political Subdivision of State of Ne | |
LIC-90-0488, Responds to Request for Info Re Status of Implementation of Generic Safety Issue Requirements | 29 June 1990 | Responds to Request for Info Re Status of Implementation of Generic Safety Issue Requirements | Scram Discharge Volume |
LIC-90-0446, Forwards Application for Amend to License DPR-40,to Restrict Containment Spray Use as Backup for Shutdown Cooling in Tech Specs | 28 June 1990 | Forwards Application for Amend to License DPR-40,to Restrict Containment Spray Use as Backup for Shutdown Cooling in Tech Specs | |
LIC-90-0429, Forwards Application to Amend License DPR-40,adding Hydrogen Purge Sys to Tech Spec.Discussion,Justification & NSHC Analysis for Amend,Provided | 28 June 1990 | Forwards Application to Amend License DPR-40,adding Hydrogen Purge Sys to Tech Spec.Discussion,Justification & NSHC Analysis for Amend,Provided | Affidavit |
ML20043J061 | 22 June 1990 | Responds to NRC 900523 Ltr Re Violations Noted in Insp Rept 50-285/90-29.Corrective Actions:Five Chemistry Technicians Provided Refresher Training on 900427 on Existing EPIP-EOF-6 | |
ML20044A163 | 22 June 1990 | Requests That NRC Continue Processing Exemption Request for Configuration of wide-range Nuclear Instrumentation Cables in Fire Area 34B (Upper Electrical Penetration Room). Emergency Boration Added to Achieve Safe Shutdown | Safe Shutdown Boric Acid Shutdown Margin Exemption Request |
ML20044A496 | 18 June 1990 | Forwards Supplemental Application for Amend to License DPR-40,making Administrative Corrections to Tech Specs. Procedure SO-G-70, Chemical Control Also Encl | |
ML20043G298 | 14 June 1990 | Provides Followup to Special Rept on Inoperable Fire Barriers.Eight Inoperable Dampers Replaced Under Mod MR-FC-87-036, Fire Damper Replacement. Remaining 38 Dampers Found to Be Acceptable After Damper Design Review | Fire Barrier |
ML20043E645 | 8 June 1990 | Provides Supplemental Response to Generic Ltr 88-17 & NRC Bulletin 80-12.Plant Pumps & Suction Header Piping Not Originally Constructed for Use as Backup to LPSI Sys for Shutdown Cooling | |
ML20043E007 | 1 June 1990 | Discusses Rev to Previous Commitments Made in Response to Requirements of 10CFR50,App R,Section Iii.G Re post-fire Repairs to Equipment Required for Cold Shutdown Following Fire in Fire Area 6 | |
ML20043G328 | 1 June 1990 | Advises That Personnel at Util Reviewed Reactor Operator Licensing Exam Administered on 900529.Comments on Exam Encl | |
ML20043C181 | 29 May 1990 | Advises That Util Has Cleaned RW HXs AC-1A & AC-1D & Will Clean AC-1C by 900615 | |
ML20043B498 | 24 May 1990 | Updates Schedule for Submitting Results of PORV Block Valve Prototype Testing.Establishment of Test Parameters & Development of Test Procedures Tentatively Scheduled for Submittal in Nov 1990.Final Rept Expected by 910630 | |
ML20043B506 | 23 May 1990 | Advises That Testing to Verify Operability of Hydrogen Purge Sys Successfully Completed During 1990 Refueling Outage.Proposed Tech Spec Rev Will Be Submitted by 900701 | |
ML20043B473 | 23 May 1990 | Forwards Fort Calhoun Station Performance Indicators, Monthly Rept for Apr 1990 | |
ML20043A782 | 18 May 1990 | Advises That Licensee Plans to Replace Valves HCV-247 & HCV-2988 During 1991 Refueling Outage Pending Successful Redesign & Retesting of New Valves by Valcor | |
ML20043A802 | 18 May 1990 | Advises That Walkdown of safety-related Portions of Plant to Verify Accuracy of Fire Barrier Penetration Drawings & Surveillance Tests Will Be Completed by 900831 | Fire Barrier |
ML20043B039 | 16 May 1990 | Informs of Current Status of Post Accident Sampling Sys. Program Meets Min Requirements & Fulfills Conditions of Tech Spec 5.15 | Grab sample |
ML20042G986 | 11 May 1990 | Forwards Rev 0 to Interim Operability Criteria (Ioc) Criteria for Performing Safety Analysis for Interim Operability of Piping, Resulting from Discussion at 900306 & 0418 Meetings | Safe Shutdown Earthquake Operating Basis Earthquake |
ML20042G957 | 10 May 1990 | Forwards Suppl to Application for Amend to License DPR-40, Making Administrative Clarification to Chloride Sampling Requirements.Standing Order Procedure S.O.-M-10, Tool Accountability Also Encl | |
ML20042G998 | 10 May 1990 | Forwards Proprietary & Nonproprietary Rev 13 to EPIP-EOF-18, Offsite Radiological Surveys. | |
ML20042H002 | 10 May 1990 | Fowards Fort Calhoun Station Performance Indicators,Mar 1990, Monthly Rept | |
ML20042G467 | 9 May 1990 | Forwards Application for Amend to License DPR-40,changing Chemical & Vol Control Sys |