Letter Sequence Approval |
---|
|
|
MONTHYEARML20050B8331982-04-0202 April 1982 Forwards Addl Info Re Environ Qualification of Equipment Installed in Response to TMI Requirements,Including Revision to Page 2 of 810826 Qualification Package Encl 13,per 820201 Commitment Project stage: Request ML20062B7271982-07-23023 July 1982 Forwards Safety Evaluation Identifying Three Open Items Re App J Containment Leak Testing Review.Nrc Review Put on Hold Pending Receipt of Licensee Info.Response Due in 30 Days. Supplemental SER Will Be Issued Upon Review Completion Project stage: Approval ML20062B7301982-07-23023 July 1982 Safety Evaluation Re App J Review.Three Open Items Identified Project stage: Approval ML20064N4571982-09-0303 September 1982 Responds to Open Items Identified in NRC 820723 Safety Evaluation Re Containment Leakage Testing Program.Resolution of Areas of Containment Personnel Access Door Seal & Isolation Valve Testing to Be Provided by 821101 Project stage: Other ML20065A5581982-09-0707 September 1982 Advises That Revised Electrical Equipment Qualification Manual Will Be Issued within Next 2 Months Project stage: Request ML20066E5771982-11-0505 November 1982 Forwards Addl Info Re Containment Leakage Testing Program, in Response to Open Items Identified in NRC . Penetration M-44 Will Be Tested Per 10CFR50 App J.Util Amend Application Will Be Revised Project stage: Other ML20066B9531982-11-0505 November 1982 Forwards Electrical Equipment Qualification Manual Per IE Bulletin 79-01B, Environ Qualification of Safety-Related Electrical Equipment Project stage: Request ML20070U2791983-01-26026 January 1983 Application to Amend OL Revising App J Tech Specs to Incorporate Type C Testing of Penetration M-44 & Calculate Max Allowable Leakage Rate Using 0.2% by Weight of Containment Atmosphere Per 24 H at 60 Psig Project stage: Request ML20070U2931983-01-26026 January 1983 Proposed Tech Spec Rev Incorporating Type C Testing of Penetration M-44 & Calculating Max Allowable Leakage Rate Using 0.2% by Weight of Containment Atmosphere Per 24 H at 60 Psig Project stage: Other ML20137D8141985-08-0101 August 1985 Notice of Environ Assessment & Finding of No Significant Impact Re Util 830126 Request for Exemptions from Section III of 10CFR50,App J Project stage: Other ML20137D8001985-08-0101 August 1985 Forwards Notice of Environ Assessment & Finding of No Significant Impact Re 830126 Request for Exemption from 10CFR50,App J Project stage: Approval ML20137V9881985-11-27027 November 1985 Tech Spec Section 3.5, Containment Test, Maintaining Max Allowable Containment Leak Rate at 0.2% by Weight Per Day Project stage: Other ML20137V9551985-11-27027 November 1985 Withdraws 830126 & 0902 Applications for Amends to License DPR-40,changing Allowable Containment DBA Leak Rate to 0.2% by Weight Per Day.Tech Spec Section 3.5 Resubmitted,Per 770330 Application for Amend Project stage: Request ML20137H5531986-01-10010 January 1986 Exemption from Requirements of 10CFR50,App J Re Primary Reactor Containment Leakage Testing for water-cooled Power Reactors Project stage: Approval ML20137H5361986-01-10010 January 1986 Forwards Exemption from Certain Requirements of App J to 10CFR50 & SER Re Primary Reactor Containment Leakage Testing for water-cooled Power Reactors.Review of Proposed Tech Spec Changes Continuing Project stage: Approval ML20151Y6941986-02-0303 February 1986 Safety Evaluation Supporting Amend 95 to License DPR-40 Project stage: Approval ML20151Y6781986-02-0303 February 1986 Amend 95 to License DPR-40,revising Surveillance Tech Specs to Ensure That Reactor Containment Bldg Leak Rate Testing Performed Per 10CFR50,App J Project stage: Other ML20151Y6671986-02-0303 February 1986 Forwards Amend 95 to License DPR-40 & Safety Evaluation. Amend Revises Surveillance Tech Specs to Ensure That Reactor Containment Bldg Leak Rate Testing Performed Per 10CFR50,App J Project stage: Approval 1982-09-07
[Table View] |
|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217B5401999-10-0606 October 1999 Safety Evaluation Supporting Amend 193 to License DPR-40 ML20211J9321999-09-0202 September 1999 Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1 ML20210G2181999-07-27027 July 1999 Safety Evaluation Supporting Amend 192 to License DPR-40 ML20210D9951999-07-22022 July 1999 Safety Evaluation Supporting Amend 191 to License DPR-40 ML20206L4241999-05-10010 May 1999 Safety Evaluation Supporting Corrective Actions to Ensure That Valves Are Capable of Performing Intended Safety Functions & OPPD Adequately Addressed Requested Actions Discussed in GL 95-07 ML20206M2601999-05-0606 May 1999 SER Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & IPEEE Results Reasonable Given FCS Design,Operation & History ML20205Q5831999-04-15015 April 1999 Safety Evaluation Supporting Amend 190 to License DPR-40 ML20198S3771998-12-31031 December 1998 Safety Evaluation Supporting Amend 189 to License DPR-40 ML20198S4831998-12-31031 December 1998 Safety Evaluation Supporting Amend 188 to License DPR-40 ML20154M4881998-10-19019 October 1998 Safety Evaluation Supporting Amend 186 to License DPR-40 ML20154N2411998-10-19019 October 1998 Safety Evaluation Supporting Amend 187 to License DPR-40 ML20236V4891998-07-30030 July 1998 Safety Evaluation Relating to Response to GL 87-02,suppl 1 for Fort Calhoun Station,Unit 1 ML20248C0671998-05-21021 May 1998 Safety Evaluation Granting Licensee Request for Exemption from Technical Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101 ML20217L7201998-03-23023 March 1998 Safety Evaluation Supporting Amend 185 to License DPR-40 ML20203M4161998-02-0303 February 1998 Safety Evaluation Supporting Amend 184 to License DPR-40 ML20203A4291998-01-26026 January 1998 Safety Evaluation Supporting Amend 183 to License DPR-40 ML20199L0711997-11-24024 November 1997 Safety Evaluation Supporting Amend 182 to License DPR-40 ML20198Q4031997-10-28028 October 1997 Safety Evaluation Re Control Room Habitability Requirements ML20137L6241997-03-27027 March 1997 Safety Evaluation Supporting Amend 181 to License DPR-40 ML20134N7751997-02-13013 February 1997 Safety Evaluation Supporting Amend 180 to License DPR-40 ML20134M6171997-02-13013 February 1997 Safety Evaluation Denying Licensee Request for Approval to Use ASME Section XI Code Case N-416-1 W/Proposed Exception & Code Case N-498-2 as Alternative to Required Hydrostatic Pressure Test ML20133P9161997-01-23023 January 1997 Safety Evaluation Accepting Revised Temperature Limits for DG-1 & DG-2 ML20133C2771996-12-30030 December 1996 Safety Evaluation Supporting Amend 179 to License DPR-40 ML20132F4911996-12-0909 December 1996 Safety Evaluation Related to Individual Plant Evaluation Omaha Power District,Fort Calhoun Station,Unit 1 ML20134M0871996-11-19019 November 1996 Safety Evaluation Supporting Request for Relief from Modifying Supports SIH-3,SIS-63,SIS-65 & RCH-13 at Fort Calhoun Station ML20129H3371996-10-25025 October 1996 Safety Evaluation Supporting Amend 178 to License DPR-40 ML20128F6441996-10-0202 October 1996 Safety Evaluation Supporting Amend 177 to License DPR-40 ML20129G3131996-09-27027 September 1996 Safety Evaluation Supporting Amend 176 to License DPR-40 ML20059J1831994-01-14014 January 1994 Safety Evaluation Supporting Amend 160 to License DPR-40 ML20059J2491994-01-14014 January 1994 Safety Evaluation Supporting Amend 159 to License DPR-40 ML20058G9371993-12-0303 December 1993 Safety Evaluation Supporting Amend 158 to License DPR-40 ML20058F5951993-11-22022 November 1993 Safety Evaluation Supporting Amend 157 to License DPR-40 ML20058C7491993-11-18018 November 1993 Safety Evaluation,Authorizing Alternative,On One Time Basis Only,W/Conditions That Licensee Perform Volumetric Exam of nozzle-to-vessel Welds During First Refueling Outage of Third 10-yr Insp Interval ML20059L7081993-11-10010 November 1993 Safety Evaluation Accepting Licensee Proposed Changes to Low Power Physics Testing Program ML20059G6601993-10-29029 October 1993 Safety Evaluation Supporting Amend 156 to License DPR-40 ML20057E3471993-10-0101 October 1993 Safety Evaluation Advising That Based on Determination That Alternative Testing Consistent w/OM-10,paragraph 4.3.2.2. Requirements,No Relief Required ML20056E5411993-08-12012 August 1993 Safety Evaluation Supporting Amend 155 to License DPR-40 ML20056E5371993-08-10010 August 1993 Safety Evaluation Supporting Amend 154 to License DPR-40 ML20056D6801993-07-26026 July 1993 Safety Evaluation Supporting Amend 153 to License DPR-40 ML20128B8241993-01-26026 January 1993 Safety Evaluation Supporting Amend 149 to License DPR-40 ML20128D4511992-11-30030 November 1992 Safety Evaluation Accepting Evaluation of 120-day Response to Suppl 1 to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, Unresolved Safety Issue A-46 ML20062G6621990-11-19019 November 1990 Safety Evaluation Supporting Amend 134 to License DPR-40 ML20216K0661990-11-14014 November 1990 Safety Evaluation Denying Util 900221 & 0622 Requests for Exemption from App R of 10CFR50 for Fire Area 34B,upper Electrical Penetration Room.Current Level of Fire Protection Does Not Meet Section III.G.2 Requirements ML20062B6161990-10-12012 October 1990 Safety Evaluation Supporting Amend 133 to License DPR-40 ML20055G0221990-07-0606 July 1990 Safety Evaluation Supporting Amend 132 to License DPR-40 ML20246A0741989-08-17017 August 1989 Safety Evaluation Re Inservice Testing Program for Pumps & Valves ML20245H9031989-08-15015 August 1989 Safety Evaluation Re Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components). Licensee Program Meets Requirements of Item 2.1 (Part 1) of Generic Ltr 83-28 & Acceptable ML20245K3481989-08-11011 August 1989 Safety Evaluation Accepting Electrical Isolation Devices for Interfacing Safety & Nonsafety Sys Re Implementation of ATWS Rule ML20247H6421989-07-24024 July 1989 Safety Evaluation Granting 890118 Request for Relief from Hydrostatic Testing Requirements of Section XI of ASME Code ML20248C0851989-06-0202 June 1989 Safety Evaluation Supporting Amend 122 to License DPR-40 1999-09-02
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217B5401999-10-0606 October 1999 Safety Evaluation Supporting Amend 193 to License DPR-40 ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data LIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With ML20211J9321999-09-0202 September 1999 Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1 LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20216E6431999-08-26026 August 1999 Rev 19 to TDB-VI, COLR for FCS Unit 1 ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 ML20210G2181999-07-27027 July 1999 Safety Evaluation Supporting Amend 192 to License DPR-40 ML20210D9951999-07-22022 July 1999 Safety Evaluation Supporting Amend 191 to License DPR-40 ML20216E6361999-07-21021 July 1999 Rev 18 to TDB-VI, COLR for FCS Unit 1 ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20210P5461999-06-0808 June 1999 Rev 0,Vols 1-5 of Fort Calhoun Station 1999 Emergency Preparedness Exercise Manual, to Be Conducted on 990810. Pages 2-20 & 2-40 in Vol 2 & Page 4-1 in Vol 4 of Incoming Submittal Not Included ML20195B4581999-05-31031 May 1999 Rev 3 to CE NPSD-683, Development of RCS Pressure & Temp Limits Rept for Removal of P-T Limits & LTOP Requirements from Ts ML20207H7401999-05-31031 May 1999 Performance Indicators Rept for May 1999 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 ML20195B4521999-05-17017 May 1999 Technical Data Book TDB-IX, RCS Pressure - Temp Limits Rept (Ptlr) ML20206L4241999-05-10010 May 1999 Safety Evaluation Supporting Corrective Actions to Ensure That Valves Are Capable of Performing Intended Safety Functions & OPPD Adequately Addressed Requested Actions Discussed in GL 95-07 ML20206M2601999-05-0606 May 1999 SER Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & IPEEE Results Reasonable Given FCS Design,Operation & History LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With ML20195E8621999-04-30030 April 1999 Performance Indicators, for Apr 1999 ML20205Q5831999-04-15015 April 1999 Safety Evaluation Supporting Amend 190 to License DPR-40 ML20210J4331999-03-31031 March 1999 Changes,Tests, & Experiments Carried Out Without Prior Commission Approval for Period 981101-990331.With USAR Changes Other than Those Resulting from 10CFR50.59 ML20206G2641999-03-31031 March 1999 Performance Indicators Rept for Mar 1999 LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With ML20205J8181999-02-28028 February 1999 Performance Indicators, for Feb 1999 LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With ML20207F3291999-01-31031 January 1999 FCS Performance Indicators for Jan 1999 ML20203B0991998-12-31031 December 1998 Performance Indicators for Dec 1998 LIC-99-0026, 1998 Omaha Public Power District Annual Rept. with1998-12-31031 December 1998 1998 Omaha Public Power District Annual Rept. with LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With ML20198S3771998-12-31031 December 1998 Safety Evaluation Supporting Amend 189 to License DPR-40 ML20198S4831998-12-31031 December 1998 Safety Evaluation Supporting Amend 188 to License DPR-40 ML20196G2251998-12-18018 December 1998 Rev 2 to EA-FC-90-082, Potential Over-Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment ML20198M3141998-11-30030 November 1998 Performance Indicators Rept for Nov 1998 LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0160, Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated1998-11-25025 November 1998 Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated ML20203B0721998-11-16016 November 1998 Rev 6 to HI-92828, Licensing Rept for Spent Fuel Storage Capacity Expansion ML20196E4981998-10-31031 October 1998 Performance Indicators Rept for Oct 1998 ML20196G2441998-10-31031 October 1998 Changes,Tests & Experiments Carried Out Without Prior Commission Approval. with USAR Changes Other than Those Resulting from 10CFR50.59 LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With ML20154M4881998-10-19019 October 1998 Safety Evaluation Supporting Amend 186 to License DPR-40 ML20154N2411998-10-19019 October 1998 Safety Evaluation Supporting Amend 187 to License DPR-40 LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With ML20155G4261998-09-30030 September 1998 Performance Indicators for Sept 1998 ML20154A1251998-08-31031 August 1998 Performance Indicators, Rept for Aug 1998 LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With ML20238F7231998-08-17017 August 1998 Owner'S Rept for Isis ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency 1999-09-30
[Table view] |
Text
--
1
.. r ', ,
3 ,
utif k.: :. / ]/y y (! - .
~
y .
SAFETY EVALUATION REPORT D' -
APPENDIX J REVIEW f ,
FORT CALHOUN STATION, UNIT 1 . .
DOCKET NO.50-029 f
1 .
1.0 INTRODUCTION
On August 7,1975[1], the NRC requested Omaha Public Power District (OPPD) to review its containment testing program for the Fort Calhoun ,
Station, Unit 1 (Fort Calhoun), and the associated Technical Specifi.-
cations, for compliance with the requirements of Appendix J to 10 CFR Part 50.
Appendix J to 10 CFR Part 50 was published on February 14, 1973. Since by this date there were already many operating nuclear plants and a number more in advance stages of design or construction, the NRC decided to have these plants reevaluated against the requirements of this new regulation. Therefore, beginning in 1975, requests for review of the extent of compliance with the requirements of Appendix J were made of each licensee. Following the initial responses to these requests, NRC -
staff positions were developed which wou,ld assure that the objectives of the testing requirements of the above cited regulation were satis-
}'
'fied. These staff positions have since been applied to our review of the submittals filed by the licensee for Fort Calhoun. The results of 3
our evaluation are provided below.
0 2.0 EVALUATION Our consultant, the Franklin Research Center (FRC), has reviewed the licensee's submittals [2, 3, 5] and prepared the attached evalu-ation of containment leakage tests for Fort Calhoun. We have reviewed this evaluation and concur in its bases and findings.
Oh ohhhoh85 ~.
PDR ___
sdIk
. a.
i
3.0 CONCLUSION
i Based on our review of the enclosed Technical Eval.uation Report (TER) 1 l regarding the Appendix J review for Fort Calhoun, we conclude that:
3.1 The definition of terms provided in proposed Technical Specifica-a tion 3.5.(1) is in accordance with Appendix J and is acceptable.
3.2 The Type A test pretest requirements, test methods, acceptance criteria, and testing frequency of proposed Technical Specifica- '
t tion 3.5.(2) are in accordance with Appendix J and are acceptable.
3.3 The Type B test methods, test pressure, frequency, and acceptance criteria, other than for containment airlocks, of proposed Techni-cal Specification 3.5.(3) are in accordance with Appendix J and are acceptable.
D 3.4 OPPE's proposal to test containment airlocks at not less than .
5 ps'ig within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of every first of a series of openings and L
l to conservatively extrapolate the results to Pa is in accordance ll ij with the requirements of Appendix J and is acceptable.
.t l' 3.5 OPPD's correlatiqn to extrapolate leakage rates at 5 psig to 60 .
j psig is not sufficiently conservative. An alternative method 1
ll 1s suggested in Appendix A of the enclosed TER.
.3.6 The Type C test methods, test pressure, acceptance criteria, testing frequency, and penetrations to be tested of proposed Technical Specification 3.5.(4) are in conformance with Appendix J and are acceptable, except for penetrations M-3 and M-44. The isolation valves in these penetrations should be tested in ac-cordance with Appendix J.
4 _. . _._ _. .. ___ __ _ _ . _ _ . - _ _ _ _
g _ __ _ ._. -
. t.. .
~
- \
l
!. 3.7 The special requirements relating to modification and replace-ment of containment isolation ' components of proposed Technical Specification 3.5.(5) are in conformance with Appendix J and are acceptable. -
3.8 The requirements for reporting test results of proposed Techni-cal Specification 3.5.(6) are in conformance with Appendix J and are acceptable.
4.0 REFERENCES
- 1. NRC generic letter, " Implementation of '10 CFR Part 50, Appendix J, at Fort Calhoun," dated August 7,1975. -
- 2. T. E. Short (OPPD) letter to K. R. Goller (NRC), dated' September 10, 1975.
- 3. LeBoeuf, Lamb, Leiby, and MacRea letter to Mr. B. C. Rusche (NRC),
Subject:
Proposed Technical Specification Change for Fort Calhoun, dated March 30, 1977.
- 4. NRC letter, " Request for Additional Information," dated April 4, 1980.
- 5. W. C. Jones (0 PPD) letter to R. A. Clark (NRC), dated May 15, 1980.
Attachment:
FRC Technical Evaluation Report 1