ML22347A278

From kanterella
Revision as of 14:42, 8 February 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022
ML22347A278
Person / Time
Site: Pilgrim
Issue date: 12/21/2022
From: Daniel Schroeder
Decommissioning, ISFSI, and Reactor Health Physics Branch
To: Trice K
Holtec Decommissioning International
References
Download: ML22347A278 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE RD., SUITE 102 KING OF PRUSSIA, PA 19406-2713 December 21, 2022 Kelly Trice President - HDI Holtec Decommissioning International, LLC Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104

SUBJECT:

PILGRIM NUCLEAR POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION PLAN

Dear Kelly Trice:

The enclosed inspection plan lists the security inspections scheduled through December 31, 2024. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well before our inspectors arrive on site.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5262 with any questions you may have regarding the inspection plan.

Sincerely, Digitally signed by Daniel Daniel L. L. Schroeder Date: 2023.01.23 Schroeder 14:43:34 -05'00' Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security Docket No. 50-293 License No. DPR-35

Enclosure:

Pilgrim Nuclear Power Station - Independent Spent Fuel Storage Installation Security Inspection Plan

ML22347A278 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRSS RI/DRSS RI/ DRSS NAME TEck ADimitriadis DSchroeder DATE 12/15/2022 12/16/2022 12/21/2022