August 30, 2005 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - PILGRIM NUCLEAR POWER STATION

Dear Mr. Balduzzi:

On August 3, 2005, the NRC staff completed its performance review of Pilgrim Nuclear Power Station for the first half of the calender year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we currently plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

Additionally, on July 14, 2005, the staff issued a severity level III Notice of Violation in accordance with the NRCs Enforcement Policy. The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved are already adequately addressed on the docket in the letter transmitting the Notice of Violation (EA -039).

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2007. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

Mr. Michael A. Balduzzi 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5227 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-293 License Nos. DPR-35

Enclosure:

Pilgrim Inspection/ Activity Plan

Mr. Michael A. Balduzzi 3 cc w/encl:

G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.

J. T. Herron, Senior Vice President and Chief Operating Officer C. Schwarz, Vice-President, Operations Support S. J. Bethay, Director, Nuclear Safety Assurance O. Limpias, Vice President, Engineering J. F. McCann, Director, Licensing C. D. Faison, Manager, Licensing M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.

B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.

T. C. McCullough, Assistant General Counsel S. Lousteau, Treasury Department, Entergy Services, Inc.

R. Walker, Department of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Electric Power Division, Commonwealth of Massachusetts R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network Chairman, Citizens Urging Responsible Energy J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant C. McCombs, Acting Director, MEMA and Commonwealth of Massachusettts, SLO Designee Commonwealth of Massachusetts, Secretary of Public Safety Institute of Nuclear Power Operations (INPO)

Mr. Michael A. Balduzzi 4 Distribution w/encl: (via E-mail)

S. Collins, RA M. Dapas, DRA S. Lee, RI EDO Coordinator C. Anderson, DRP D. Florek, DRP RidsNrrDipmIipb@nrc.gov J. Shea, PM, NRR R. Ennis, NRR W. Raymond, DRP, Senior Resident Inspector C. Welch, DRP, Resident Inspector A. Ford, DRP, Resident OA Region I Docket Room (with concurrences)

ROPreports@nrc.gov DOCUMENT NAME: S:\ROP-6 Mid-Cycle Review\2005 Mid-Cycle Letters\Pilgrim Mid-Cycle Letter.wpd SISP Review Complete: CJA (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP /

NAME APatel CAnderson DATE 08/10/05 08/30/05 OFFICIAL RECORD COPY

Page 1 of 2 Pilgrim 08/30/2005 10:28:20 Inspection / Activity Plan Report 22 08/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111111B - LICENSED OPERATOR REQUAL PROGRAM 3 1 IP 7111111B Licensed Operator Requalification Program 09/12/2005 09/16/2005 Baseline Inspections 1 IP 7111111B Licensed Operator Requalification Program 09/19/2005 09/23/2005 Baseline Inspections 7111112B - MAINTENANCE RULE 1 1 IP 7111112B Maintenance Effectiveness 08/29/2005 09/02/2005 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 09/12/2005 09/16/2005 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 11/07/2005 11/11/2005 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 11/07/2005 11/11/2005 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/07/2005 11/11/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 11/07/2005 11/11/2005 Baseline Inspections 71121 - OCC RADIATION SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 01/30/2006 02/03/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 01/30/2006 02/03/2006 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/30/2006 02/03/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 01/30/2006 02/03/2006 Baseline Inspections 7111107B - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 02/06/2006 02/10/2006 Baseline Inspections 7111121 - SSD&PC 6 1 IP 7111121 Safety System Design and Performance Capability 04/10/2006 04/14/2006 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 04/24/2006 04/28/2006 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 05/08/2006 05/12/2006 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 05/15/2006 05/19/2006 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/12/2006 06/16/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 06/12/2006 06/16/2006 Baseline Inspections TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 1 IP 7111105T Fire Protection [Triennial] 07/24/2006 07/28/2006 Baseline Inspections 1 IP 7111105T Fire Protection [Triennial] 08/07/2006 08/11/2006 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 08/21/2006 08/25/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 08/21/2006 08/25/2006 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/21/2006 08/25/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/21/2006 08/25/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Pilgrim 08/30/2005 10:28:20 Inspection / Activity Plan Report 22 08/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7112202 - PUB RAD SAFETY - RADWASTE 1 1 IP 7112202 Radioactive Material Processing and Transportation 09/25/2006 09/29/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 09/25/2006 09/29/2006 Baseline Inspections 7111401 - EXERCISE EVALUATION & EP PI VERIFICATION 5 1 IP 7111401 Exercise Evaluation 10/23/2006 10/27/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/23/2006 10/27/2006 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/11/2006 12/15/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 12/11/2006 12/15/2006 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/11/2006 12/15/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 12/11/2006 12/15/2006 Baseline Inspections 2/26 EXM - OPERATOR LICENSING INITIAL EXAMS 3 1 U01637 PILGRIM INITIAL EXAM (FY07) 01/29/2007 02/02/2007 Not Applicable 1 U01637 PILGRIM INITIAL EXAM (FY07) 02/26/2007 03/01/2007 Not Applicable 71121 - OCC RAD PROT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 02/05/2007 02/09/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 02/05/2007 02/09/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/05/2007 02/09/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 02/05/2007 02/09/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.