MONTHYEARML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22011A1322022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML21012A4312021-01-13013 January 2021 Security Inspection Plan ML20017A2672020-01-15015 January 2020 Security Inspection Plan for Pilgrim Nuclear Power Station - 2020 IR 05000293/20180062019-03-0404 March 2019 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2018006) and Confirmatory Action Letter Closure IR 05000293/20180052018-08-28028 August 2018 Assessment Follow-up Letter and Updated Inspection Plan (Inspection Report 05000293/2018005) IR 05000293/20170062018-02-28028 February 2018 Annual Assessment Letter for Pilgrim Nuclear Power Station (Reports 05000293/2017006, 05000293/2017402, and 05000293/2017501) IR 05000293/20170052017-08-28028 August 2017 Quarterly Assessment and Updated Inspection Plan for Pilgrim Nuclear Power Station (Report 05000293/2017005) IR 05000293/20160062017-03-0101 March 2017 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2016006) IR 05000293/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2016005) IR 05000293/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2015006) ML15352A1282015-12-18018 December 2015 Notification of Inspection Procedure 95003 Phase a and Phase B Inspections IR 05000293/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2015005) IR 05000293/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2014001)(w/Inspection Plan) IR 05000293/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Pilgrim Nuclear Power Station (Report 05000293-14-006) IR 05000293/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2013001)(w/Inspection Plan) ML13242A2102013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Pilgrim Nuclear Power Station (Report 05000293-13-006) IR 05000293/20130062013-09-0303 September 2013 Revised Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station (Report 05000293-13-006) IR 05000293/20120012013-03-0404 March 2013 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2012001) ML12248A0752012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Pilgrim Nuclear Power Station IR 05000293/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000293/2011001) ML1124400172011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Pilgrim Nuclear Power Station IR 05000293/20100012011-03-0404 March 2011 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2010001) ML1029100132010-10-18018 October 2010 Pre-Inspection Cover Sheet and Inspection Plan (10/18-10/21/2010) ML1024405932010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Pilgrim Nuclear Power Station ML1019300312010-07-12012 July 2010 Pre-Inspection Cover Sheet and Inspection Plan (7/12 - 7/16/10) ML1006214172010-03-0303 March 2010 Annual Assessment Letter ML0924401172009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station IR 05000293/20090012009-03-0404 March 2009 IR 05000293/09-001, Pilgrim Nuclear Power Station Annual Assessment Letter, Dated March 4, 2009 ML0824702322008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Pilgrim IR 05000293/20080012008-03-0303 March 2008 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293-08-001) ML0734709542007-12-13013 December 2007 ROP 8 - Pilgrim - Change to Inspection Plan, 12/13/07 ML0724309442007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Plant IR 05000293/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Pilgrim Station (IR 05000293-07-001) ML0706703702007-02-15015 February 2007 Pre-Inspection Cover Sheet and Inspection Plan - Pilgrim Nuclear Generating Station; 05000293/2006007 ML0704404302006-10-0606 October 2006 Interview Schedule - Region 1 Inspection ML0626101432006-09-14014 September 2006 Pre-Inspection Cover Sheet and Inspection Plan ML0624304432006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station IR 05000293/20060012006-03-0202 March 2006 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293/2006001) ML0524207072005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Pilgrim Nuclear Power Station ML0506101562005-03-0202 March 2005 Annual Assessment Letter 2005001 - Pilgrim ML0424408492004-08-30030 August 2004 2004 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station ML0406301792004-03-0202 March 2004 2003-04 Annual Assessment Letter - Pilgrim IR 05000293/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 50-293/03-001) IR 05000293/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 50-293/02-001) 2024-01-09
[Table view] Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] |
Text
August 30, 2005 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - PILGRIM NUCLEAR POWER STATION
Dear Mr. Balduzzi:
On August 3, 2005, the NRC staff completed its performance review of Pilgrim Nuclear Power Station for the first half of the calender year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we currently plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
Additionally, on July 14, 2005, the staff issued a severity level III Notice of Violation in accordance with the NRCs Enforcement Policy. The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved are already adequately addressed on the docket in the letter transmitting the Notice of Violation (EA -039).
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2007. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
Mr. Michael A. Balduzzi 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5227 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-293 License Nos. DPR-35
Enclosure:
Pilgrim Inspection/ Activity Plan
Mr. Michael A. Balduzzi 3 cc w/encl:
G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.
J. T. Herron, Senior Vice President and Chief Operating Officer C. Schwarz, Vice-President, Operations Support S. J. Bethay, Director, Nuclear Safety Assurance O. Limpias, Vice President, Engineering J. F. McCann, Director, Licensing C. D. Faison, Manager, Licensing M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.
B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.
T. C. McCullough, Assistant General Counsel S. Lousteau, Treasury Department, Entergy Services, Inc.
R. Walker, Department of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Electric Power Division, Commonwealth of Massachusetts R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network Chairman, Citizens Urging Responsible Energy J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant C. McCombs, Acting Director, MEMA and Commonwealth of Massachusettts, SLO Designee Commonwealth of Massachusetts, Secretary of Public Safety Institute of Nuclear Power Operations (INPO)
Mr. Michael A. Balduzzi 4 Distribution w/encl: (via E-mail)
S. Collins, RA M. Dapas, DRA S. Lee, RI EDO Coordinator C. Anderson, DRP D. Florek, DRP RidsNrrDipmIipb@nrc.gov J. Shea, PM, NRR R. Ennis, NRR W. Raymond, DRP, Senior Resident Inspector C. Welch, DRP, Resident Inspector A. Ford, DRP, Resident OA Region I Docket Room (with concurrences)
ROPreports@nrc.gov DOCUMENT NAME: S:\ROP-6 Mid-Cycle Review\2005 Mid-Cycle Letters\Pilgrim Mid-Cycle Letter.wpd SISP Review Complete: CJA (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP /
NAME APatel CAnderson DATE 08/10/05 08/30/05 OFFICIAL RECORD COPY
Page 1 of 2 Pilgrim 08/30/2005 10:28:20 Inspection / Activity Plan Report 22 08/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111111B - LICENSED OPERATOR REQUAL PROGRAM 3 1 IP 7111111B Licensed Operator Requalification Program 09/12/2005 09/16/2005 Baseline Inspections 1 IP 7111111B Licensed Operator Requalification Program 09/19/2005 09/23/2005 Baseline Inspections 7111112B - MAINTENANCE RULE 1 1 IP 7111112B Maintenance Effectiveness 08/29/2005 09/02/2005 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 09/12/2005 09/16/2005 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 11/07/2005 11/11/2005 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 11/07/2005 11/11/2005 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/07/2005 11/11/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 11/07/2005 11/11/2005 Baseline Inspections 71121 - OCC RADIATION SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 01/30/2006 02/03/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 01/30/2006 02/03/2006 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/30/2006 02/03/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 01/30/2006 02/03/2006 Baseline Inspections 7111107B - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 02/06/2006 02/10/2006 Baseline Inspections 7111121 - SSD&PC 6 1 IP 7111121 Safety System Design and Performance Capability 04/10/2006 04/14/2006 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 04/24/2006 04/28/2006 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 05/08/2006 05/12/2006 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 05/15/2006 05/19/2006 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/12/2006 06/16/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 06/12/2006 06/16/2006 Baseline Inspections TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 1 IP 7111105T Fire Protection [Triennial] 07/24/2006 07/28/2006 Baseline Inspections 1 IP 7111105T Fire Protection [Triennial] 08/07/2006 08/11/2006 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 08/21/2006 08/25/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 08/21/2006 08/25/2006 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/21/2006 08/25/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/21/2006 08/25/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Pilgrim 08/30/2005 10:28:20 Inspection / Activity Plan Report 22 08/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7112202 - PUB RAD SAFETY - RADWASTE 1 1 IP 7112202 Radioactive Material Processing and Transportation 09/25/2006 09/29/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 09/25/2006 09/29/2006 Baseline Inspections 7111401 - EXERCISE EVALUATION & EP PI VERIFICATION 5 1 IP 7111401 Exercise Evaluation 10/23/2006 10/27/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/23/2006 10/27/2006 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/11/2006 12/15/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 12/11/2006 12/15/2006 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/11/2006 12/15/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 12/11/2006 12/15/2006 Baseline Inspections 2/26 EXM - OPERATOR LICENSING INITIAL EXAMS 3 1 U01637 PILGRIM INITIAL EXAM (FY07) 01/29/2007 02/02/2007 Not Applicable 1 U01637 PILGRIM INITIAL EXAM (FY07) 02/26/2007 03/01/2007 Not Applicable 71121 - OCC RAD PROT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 02/05/2007 02/09/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 02/05/2007 02/09/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/05/2007 02/09/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 02/05/2007 02/09/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.