Mid-Cycle Performance Review and Inspection Plan 2010 - Pilgrim Nuclear Power Station
ML102440593
Person / Time
Site: Pilgrim
Issue date: 09/01/2010
From: Diane Jackson
NRC/RGN-I/DRP/PB5
To: Bronson K
Entergy Nuclear Operations
Jackson, D E RI/DRP/PB5/610-337-5306
References
Download: ML102440593 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406*1415 September 1, 2010 Mr. Kevin Bronson Site Vice President Entergy Nuclear Operations. Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN PILGRIM NUCLEAR POWER STATION

Dear Mr. Bronson:

On August 12, 2010, the Nuclear Regulatory Commission (NRC) staff completed its performance review of the Pilgrim Nuclear Power Station. Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from July 1, 2009 through June 3D, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Pilgrim was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety Significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31,2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

K. Bronson 2 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5306 with any questions you may have regarding this letter or the inspection plan.

Donald E. J son, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-293 License No. DPR-35 Enclosure,: Pilgrim Inspection/Activity Plan i*

ccw/encl: Distribution via ListServ

K. Bronson 2 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5306 with any questions you may have regarding this letter or the inspection plan.

Sincerely, IRA!

Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-293 License No. DPR-35

Enclosure:

Pilgrim Inspection/Activity Plan cc w/encl: Distribution via ListServ Distribution w/enel:

M. Dapas. Acting T. Setzer, DRP A. Klett, NRR D. lew, Acting ORA M. Schneider, DRP. SRI N. McNamara, SLO J. Clifford, DRP B. Smith. DRP. RI D. Tifft, SLO D. Collins, ORP A. Ford. DRP, Resident OA RidsNrrPMPilgrim Resource O. Roberts, DRS DRS Branch Chiefs (6) RidsNrrDorlLPL1-1 Resource P. Wilson, DRS D. Serenci, PAO ROPreports.Resource@nrc.gov L Trocine, RI OEDO N. Sheehan, PAO RidsNrrDirslpabResource@nrc.gov D. Jackson, DRP R. Barkley, ORA SUNSI Review Complete: TCS (Reviewer'S Initials) ML102440593 DOC. NAME: S:\ROP-11 Mid-Cycle Review\Branch 5\Pilgrim\201 0 Mid-Cycle Assessment Letter Pilgrim.docx After declaring this document "An Official Agency Record" it will be released to the Public.

To receive acopy of this document, indicate in the box; 'C' =Copy without allachmenVenclosure 'E':; Copy with attachmentJenclosure 'N' =No copy liCEME DATE RIIDRP TSetzerl TCS 081 25 /10 I RIIDRP DJacksonl DEJ 08/30/10 I

OFFICIAL RECORD COpy

Page 1 of2 Pilgrim 08/25/2010 08:57:21 Inspection / Activity Plan Report 22 07/01/2010 - 12/31/2011 Planned Dates Start End Title 71152 - PI&R SAMPLE - PILGRIM B.5.B SAMPLE 1 07/2612010 07/27/2010 IP 71152 Identification and Resolution of Problems 2515/173 -INDUSTRY GROUND WATER INITIATIVE 1 0711212010 07/1612010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 71124.06 - PUB RAD SAFETY - EFFLUENTS 07/12/2010 07/16/2010 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 07/12/2010 0711612010 IP 71151 Performance Indicator Verification 01/24EXM - OPERATOR LICENSING INITIAL EXAMS 4 1211312010 12/1712010 U01833 FY11 " PILGRIM, INITIAL OL EXAM 01/2412011 02104/2011 U01833 FY11 - PILGRIM,lNITiAL OL EXAM MODS - PERMANENT PLANT MODIFICATIONS 3 0911312010 09/17/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 09/27/2010 10/0112010 IP 7111117T Evaluations of Changes. Tests, or Experiments and Permanent Plant Modifications 71124 - RAD SAFETY - RAD HAZZARD ASSES/ALARA 1 10/1812010 10/22/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 10/18/2010 10/22/2010 IP 71124.02 Occupational ALARA Planning and Controls 10/18/2010 10/22/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 10/18/2010 10/22/2010 IP 71151 Performance Indicator Verification EP EX - EP EXERCISE EVALUATION 4 11/15/2010 11/19/2010 IP 7111401 Exercise Evaluation 11/15/2010 11/19/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 11/15/2010 11/19/2010 IP 71151-EP01 Drill/Exercise Performance 11/15/2010 11/1912010 IP 71151-EP02 ERO Drill Participation 11/1512010 11/19/2010 IP 71151-EP03 Alert & Notification System 711528 - PI&R 4 0211412011 02/18/2011 IP 711528 Identification and Resolution of Problems 02/28/2011 03/04/2011 IP 711528 Identification and Resolution of Problems 71124.01 - RAD HAZARD ASSESS OUT, ALARA, AIR, DOSE 02/14/2011 02/18/2011 IP 71124.01 Radiological Hazard Assessment and Exposure-Controls 02/14/2011 02/18/2011 IP 71124.02 Occupational ALARA Planning and Controls 02/14/2011 02/18/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 02/14/2011 02{18/2011 lP 71124.04 Occupational Dose Assessment 71124.01 - RAD HAZARD ASSESS OUT, ALARA,AIR, DOSE 04/25/2011 0412912011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 04/25/2011 04/29/2011 IP 71124.02 Occupational ALARA Planning and Controls his report does not include INPO and OUTAGE activiUes.

This report shows only on-site and announced inspection procedures.

Page 2 of2 Pilgrim 0812512010 08:57:21 Inspection / Activity Plan Report 22 07/01/2010 - 12/31/2011 Planned Dates Start End I !nscection Activi~ .1 Title II 71124.01 - RAD HAZARD ASSESS OUT, ALARA,AIR, DOSE 1 04125/2011 04129/2011 IP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation 04/25/2011 0412912011 IP 71124.04 Occupational Dose Assessment 04125/2011 04/29/2011 IP 71124.05 Radiation Monitoring Instrumentation 7111108G - INSERVICE INSPECTION 05/0212011 05/06/2011 IP 7111108G InselVice Inspection Activities - BWR 71124.07 -REMP 1 06/13/2011 06/17/2011 IP 71124.07 Radiological Environmental Monitoring Program 1 06/13/2011 06/17/2011 IP 71151*PR01 RETS/ODCM Radiological Effluent EPPROGR -EPPROGRAMINSPECTION 07/11/2011 07/15/2011 IP 7111402 Alert and Notification System Testing 07/11/2011 07/1512011 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 07/11/2011 07/1512011 'IP 7111404 Emergency Action Level and Emergency Plan Changes 1 07111/2011 07/15/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/11/2011 07/1512011 IP 71151-EP01 Drill/Exercise Performance 07/1112011 07/1512011 IP 71151-EP02 ERO Drill Participation 07/11/2011 07/15/2011 IP 71151-EP03 Alert & Notification System 71124.08 - RAD MATERIAL AND TRANSPORTATION 08108/2011 08/12/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactlve Material Handling, Storage, and Transportation 711111 B - PILGRIM REQUAllNSP WI P/F RESULTS 3 10/17'2011 10/2112011 IP 71111119 Licensed Operator Requalification Program 7111121 -CDBI 6 09/12/2011 09/1612011 lP 71111.21 Component Design Bases Inspection 09126/2011 09130/2011 IP 7111121 Component Design Bases Inspection 10/0312011 10/07/2011 IP 7111121 Component Design Bases Inspection 71124.01 - RAD HAZARD ASSESS, ALARA 1 1 09/2612011 09130/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 09/26/2011 0913012011 IP 71124.02 Occupational ALARA Planning and Controls 09/2612011 09/30/2011 IP 71124.03 In-Plant Alrbome Radioactivity Control and Mitigation 09/2612011 09/30/2011 IP 71124.04 Occupational Dose Assessment 09/2612011 0913012011 IP 71124.05 Radiation Monitoring Instrumentation 09/26/2011 09/3012011 IP 71151-DR01 Occupational Exposure Control Effectiveness his report does noUnc1ude INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.