Annual Assessment Letter for Pilgrim Nuclear Power Station (Reports 05000293/2017006, 05000293/2017402, and 05000293/2017501)
ML18058A025
Person / Time
Site: Pilgrim
Issue date: 02/28/2018
From: David Lew
Region 1 Administrator
To: Brian Sullivan
Entergy Nuclear Operations
Dimitriadis A
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18058A025 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713 February 28, 2018 Mr. Brian Sullivan Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 SUBJECT: ANNUAL ASSESSMENT LETTER FOR PILGRIM NUCLEAR POWER STATION (REPORTS 05000293/2017006, 05000293/2017402, AND 05000293/2017501)

Dear Mr. Sullivan:

The NRC has completed its end-of-cycle performance assessment of Pilgrim Nuclear Power Station (PNPS), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and our plans for future inspections.

The NRC determined that the performance at PNPS during 2017 was within the Multiple/Repetitive Degraded Cornerstone Column (Column 4), the second lowest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix. The NRC also determined that Entergy continued to operate PNPS safely and securely, and that additional regulatory action beyond Column 4 was not warranted. Notwithstanding placement within Column 4, our review of PIs and inspection results for PNPS indicated improved performance over the course of 2017. The NRC observed progress made by new site leadership through their reinforcement of site standards and expectations, and an overall improvement in the performance of licensed operators. However, a significant amount of work related to the performance recovery of PNPS remained for Entergy to complete. The NRC will inspect and verify that these recovery actions are adequately implemented to support sustainable performance improvement.

On January 13, 2017, the NRC completed the third and final phase of the Inspection Procedure 95003 supplemental inspections, Phase C, which reviewed PNPSs recovery plan and assessed the need for additional regulatory action, as required for all Column 4 plants. The NRC issued separate supplemental inspection reports to document completion of each phase of the inspection (ML16060A018, ML16144A027, and ML17129A2171).

On August 2, 2017, in accordance with the ROP Action Matrix requirements for plants in Column 4, the NRC issued a Confirmatory Action Letter (CAL) (ML17214A088) based on the results of the IP 95003 supplemental inspections. The CAL documented Entergys commitments, based on its revised recovery plan for PNPS, to implement corrective actions

The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS needed to address the performance concerns that resulted in placement in Column 4 and the concerns documented in the IP 95003 supplemental inspections. The NRC is conducting CAL follow-up inspections to confirm these actions are completed and effective in accordance with the CAL commitments. While these follow-up inspections include five scheduled quarterly team inspections, additional quarterly inspections will be scheduled as needed until all CAL commitments are satisfied. The NRC completed the first CAL follow-up inspection on December 8, 2017. The results are documented in NRC Inspection Report 05000293/2017010 (ML18032A463) that was issued on February 1, 2018.

Previously, following the completion of the 2017 second-quarter assessment, PNPS was assigned a cross-cutting theme in accordance with Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program, based on having at least 20 inspection findings assigned with cross-cutting aspects in the Human Performance Cross-Cutting Area, as well as at least six findings assigned with cross-cutting aspect in Procedure Adherence [H.8]. This was the only assessment period with which these themes were assigned. As of the completion of this end-of-cycle performance assessment, due to the reduction in the number of associated findings for this 12-month assessment period, PNPS no longer has either of these cross-cutting themes in the Human Performance Cross-Cutting Area.

However, with the completion of this end-of-cycle assessment, the NRC has identified two new cross-cutting themes at PNPS associated with the Problem Identification & Resolution Cross-Cutting Area: one theme due to exceeding the threshold of 12 inspection findings (13 total)

assigned with cross-cutting aspects in this cross-cutting area for this 12-month assessment period, as well as a theme due to having at least 6 inspection findings (8 total) assigned with the cross-cutting aspect Evaluation [P.2] for this 12-month assessment. Per IMC 0305, because this is the first assessment period during which the NRC has identified this theme, the NRC is documenting the theme in this assessment letter. However, given that PNPS is in Column 4, the NRC will review PNPSs broader actions in the area of problem identification and resolution under the baseline inspection program and the CAL follow-up inspections.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.

Furthermore, the NRC has taken into consideration your intention to cease operations as part of the inspection planning process. The ROP and Inspection Program provides inherent flexibility to permit inspection sampling adjustments to be made in order to better inform our assessment of performance during this unique period of transition from operating status to permanent shutdown. Any inspections scheduled after the final shutdown date will be reevaluated at that time for applicability. Once you formally notify the NRC that PNPS is permanently shut down and that all fuel has been removed from the reactor vessel, then PNPS will transition from the IMC 0305, Operating Reactor Assessment Program, and IMC 2515, Light Water Reactor Inspection Program - Operations Phase, to IMC 2561, Decommissioning Power Reactor Inspection Program. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In addition to the baseline inspections and the CAL follow-up inspections, the NRC will conduct IP 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants.

From January 1, 2017 to December 31, 2017, the NRC issued three Severity Level IV Traditional Enforcement Violations for impeding the regulatory process. Therefore, the NRC plans to conduct IP 92723, Follow-Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow-up on these violations.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Anthony Dimitriadis at (610) 337-6953 with any questions you have regarding this letter.

Sincerely,

/RA/

David C. Lew Acting Regional Administrator Docket No. 50-293 License No. DPR-35 Enclosure:

Inspection Activity Plan Report cc w/encl: Distribution via ListServ

ML18058A025 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/ORA NAME LCline ADimitriadis DPelton DLew DATE 2/26/18 2/26/18 2/26/18 2/28/18

IP 22 Inspection Activity Plan Report Pilgrim 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count Confirmatory Action Letter Inspection 2 5 1 03/19/2018 03/23/2018 IP 92702 000238 Followup On Corrective Actions For Violations And Deviations RAD HAZARDS 01 1 1 04/23/2018 04/27/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls ACCESS AUTH & CONTROL, SGI CONTROL, FFD 3 1 04/23/2018 04/27/2018 IP 71130.01 000733 Access Authorization 1 04/23/2018 04/27/2018 IP 71130.02 000734 Access Control 1 04/23/2018 04/27/2018 IP 71130.06 000738 Protection of Safeguards Information 1 04/23/2018 04/27/2018 IP 71130.08 000740 Fitness For Duty Program 1 04/23/2018 04/27/2018 IP 71151 001338 Performance Indicator Verification Confirmatory Action Letter 3 5 1 06/04/2018 06/08/2018 IP 92702 000238 Followup On Corrective Actions For Violations And Deviations ISFSI LOADING CAMPAIGN INSPECTION 2 1 07/09/2018 07/13/2018 IP 60855 001001 Operation Of An ISFSI 1 07/09/2018 07/13/2018 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01, 02, 03, 04 1 1 07/09/2018 07/13/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 07/09/2018 07/13/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 07/09/2018 07/13/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 07/09/2018 07/13/2018 IP 71124.04 000728 Occupational Dose Assessment RAD GAS AND LIQUID EFFLUENT TREATMENT (RETS) 06 1 1 08/27/2018 08/31/2018 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Confirmatory Action Letter 4 5 1 09/10/2018 09/14/2018 IP 92702 000238 Followup On Corrective Actions For Violations And Deviations PROTECTIVE STRATEGY, TSR 3 1 09/24/2018 09/28/2018 IP 71130.05 000737 Protective Strategy Evaluation 1 09/24/2018 09/28/2018 IP 71130.14 000743 Review of Power Reactor Target Sets This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

2/27/2018 12:38:28 PM Enclosure

IP 22 Inspection Activity Plan Report Pilgrim 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count TRIENNIAL FIRE PROTECTION 4 1 10/15/2018 10/19/2018 IP 71111.05T 000696 Fire Protection (Triennial)

1 10/29/2018 11/02/2018 IP 71111.05T 000696 Fire Protection (Triennial)

RAD HAZARD, ALARA, AIR ACT, DOSE ASSESS, PI's 01, 02, 03, 04, PR01, OR01 1 1 10/15/2018 10/19/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 10/15/2018 10/19/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 10/15/2018 10/19/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 10/15/2018 10/19/2018 IP 71124.04 000728 Occupational Dose Assessment 1 10/15/2018 10/19/2018 IP 71151 000746 Performance Indicator Verification EP EXERCISE INSPECTION 4 1 11/05/2018 11/09/2018 IP 71114.01 000716 Exercise Evaluation 1 11/05/2018 11/09/2018 IP 71151 001397 Performance Indicator Verification Confirmatory Action Letter 5 7 1 12/10/2018 12/14/2018 IP 92702 000238 Followup On Corrective Actions For Violations And Deviations RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01, 02, 03, 04 1 1 02/11/2019 02/15/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 02/11/2019 02/15/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 02/11/2019 02/15/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 02/11/2019 02/15/2019 IP 71124.04 000729 Occupational Dose Assessment PI&R BIENNIAL 4 1 02/25/2019 03/01/2019 IP 71152B 000747 Problem Identification and Resolution 1 03/11/2019 03/15/2019 IP 71152B 000747 Problem Identification and Resolution ACCESS CONTROL, EQUIP PERF, TRAINING 3 1 04/08/2019 04/12/2019 IP 71130.02 000734 Access Control 1 04/08/2019 04/12/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 04/08/2019 04/12/2019 IP 71130.07 000739 Security Training 1 04/08/2019 04/12/2019 IP 71151 001338 Performance Indicator Verification RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01, 02, 03, 04 1 1 04/15/2019 04/19/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

2/27/2018 12:38:28 PM

IP 22 Inspection Activity Plan Report Pilgrim 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01, 02, 03, 04 1 1 04/15/2019 04/19/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 04/15/2019 04/19/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 04/15/2019 04/19/2019 IP 71124.04 000729 Occupational Dose Assessment EQ PROGRAM 3 1 04/22/2019 04/26/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1 05/06/2019 05/10/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

RAD INSTRUMENTATION 05 1 1 05/13/2019 05/17/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 50.59 PROCESS 3 1 06/10/2019 06/14/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments Triennial Heat Sink 1 1 07/15/2019 07/19/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial PILGR REQUAL INSP WITH P/F RESULTS 2 1 09/09/2019 09/13/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual 1 09/09/2019 09/13/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial EP PROGRAM INSPECTION 2 1 12/02/2019 12/06/2019 IP 71114.02 000717 Alert and Notification System Testing 1 12/02/2019 12/06/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 12/02/2019 12/06/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 12/02/2019 12/06/2019 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.