|
---|
Category:Inspection Plan
MONTHYEARML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22011A1322022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML21012A4312021-01-13013 January 2021 Security Inspection Plan ML20017A2672020-01-15015 January 2020 Security Inspection Plan for Pilgrim Nuclear Power Station - 2020 IR 05000293/20180062019-03-0404 March 2019 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2018006) and Confirmatory Action Letter Closure IR 05000293/20180052018-08-28028 August 2018 Assessment Follow-up Letter and Updated Inspection Plan (Inspection Report 05000293/2018005) IR 05000293/20170062018-02-28028 February 2018 Annual Assessment Letter for Pilgrim Nuclear Power Station (Reports 05000293/2017006, 05000293/2017402, and 05000293/2017501) IR 05000293/20170052017-08-28028 August 2017 Quarterly Assessment and Updated Inspection Plan for Pilgrim Nuclear Power Station (Report 05000293/2017005) IR 05000293/20160062017-03-0101 March 2017 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2016006) IR 05000293/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2016005) IR 05000293/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2015006) ML15352A1282015-12-18018 December 2015 Notification of Inspection Procedure 95003 Phase a and Phase B Inspections IR 05000293/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2015005) IR 05000293/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2014001)(w/Inspection Plan) IR 05000293/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Pilgrim Nuclear Power Station (Report 05000293-14-006) IR 05000293/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2013001)(w/Inspection Plan) ML13242A2102013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Pilgrim Nuclear Power Station (Report 05000293-13-006) IR 05000293/20130062013-09-0303 September 2013 Revised Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station (Report 05000293-13-006) IR 05000293/20120012013-03-0404 March 2013 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2012001) ML12248A0752012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Pilgrim Nuclear Power Station IR 05000293/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000293/2011001) ML1124400172011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Pilgrim Nuclear Power Station IR 05000293/20100012011-03-0404 March 2011 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2010001) ML1029100132010-10-18018 October 2010 Pre-Inspection Cover Sheet and Inspection Plan (10/18-10/21/2010) ML1024405932010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Pilgrim Nuclear Power Station ML1019300312010-07-12012 July 2010 Pre-Inspection Cover Sheet and Inspection Plan (7/12 - 7/16/10) ML1006214172010-03-0303 March 2010 Annual Assessment Letter ML0924401172009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station IR 05000293/20090012009-03-0404 March 2009 IR 05000293/09-001, Pilgrim Nuclear Power Station Annual Assessment Letter, Dated March 4, 2009 ML0824702322008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Pilgrim IR 05000293/20080012008-03-0303 March 2008 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293-08-001) ML0734709542007-12-13013 December 2007 ROP 8 - Pilgrim - Change to Inspection Plan, 12/13/07 ML0724309442007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Plant IR 05000293/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Pilgrim Station (IR 05000293-07-001) ML0706703702007-02-15015 February 2007 Pre-Inspection Cover Sheet and Inspection Plan - Pilgrim Nuclear Generating Station; 05000293/2006007 ML0704404302006-10-0606 October 2006 Interview Schedule - Region 1 Inspection ML0626101432006-09-14014 September 2006 Pre-Inspection Cover Sheet and Inspection Plan ML0624304432006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station IR 05000293/20060012006-03-0202 March 2006 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293/2006001) ML0524207072005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Pilgrim Nuclear Power Station ML0506101562005-03-0202 March 2005 Annual Assessment Letter 2005001 - Pilgrim ML0424408492004-08-30030 August 2004 2004 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station ML0406301792004-03-0202 March 2004 2003-04 Annual Assessment Letter - Pilgrim IR 05000293/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 50-293/03-001) IR 05000293/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 50-293/02-001) 2024-01-09
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 3, 2010 Mr. Kevin Bronson Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA, 02360-5508
SUBJECT:
ANNUAL ASSESSMENT LETTER - PILGRIM NUCLEAR POWER STATION (REPORT 05000293/2010001)
Dear Mr. Bronson:
On February 9, 2009, the NRC staff completed its performance review of the Pilgrim Nuclear Power Station (Pilgrim). Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009.
The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Related Information" will include the security cornerstone review and resultant inspection plan.
Overall, Pilgrim operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a Jevel requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facJlity.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2011. The inspection plan is provided to aI/ow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
K. Bronson 2 In accordance with 10CFR2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan. we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5306 with any questions you may have regarding this letter or the inspection plan.
.J- ~J=1-Do~on, Sincerely, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-293 License Nos. DPR-35
Enclosure:
Pilgrim Inspection/ Activity Plan cc w/encl: Distribution via ListServ
K. Bronson 2 In accordance with 10CFR2.390 of the NRC's "Rules of Practice," a copy of this Jetter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan. we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5306 with any questioQs you may have regarding this letter or the inspection plan.
Sincerely.
IRN Donald E. Jackson. Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-293 License Nos. DPR-35 Distribution w/encl: (via email)
S. Collins, RA (R10RAMAIL RESOURCE) B. Smith. DRP, RI M. Dapas, ORA (R10RAMAIL RESOURCE) A. Ford. ORP, Resident OA D. Lew, ORP (R1DRPMAIL RESOURCE) RldsNrrPMPlIgrlm Resource J. Clifford. DRP (R1ORPMAIL RESOURCE) RldsNrrDorfLPL 1*1 Resource D. Roberts, DRS (R1DRSMaii Resource) RQPreports.Resource@nrc.gov P. Wilson, DRS (R1DRSMail Resource) DRS Branch Chiefs (6)
L Troclne, RI OEOO L Scholl, DRS D. Jackson, DRP D. Silk. DRS T. Setzer. DR? J. Trapp, DRS J. Heinly, DRP D. Screne!, PAQ B. Seinel, DRP N. Sheehan, PAD M. Schneider, ORP, SRI R. Barkley, ORA SUNSI Review Complete: _....;T_C:;,.;:S::..-._ _ (Reviewer's Initials) ML100621417 DOCUMENT NAME: S;\ROP*10 EOC Review\Branch 5\PG\2009 Annual Assessment Letter PG.doc After declaring this document "An Official Agency Record u it will be released to the Public.
To receive a copy of this doc;ument, Indicate in the box: *C" =Copy without attachment/enclosure "En:o Copy with
=
attachment/enclosure "N" No copy OFFICE RIIDRP RI/DRP l RIIDRP NAME T SetzerlTS D Jackson/ALB for ABurrittiALB DATE 0312110 0312/10 3/2110 OFFICIAL RECORD COpy
Page 1 of2 Pilgrim 03/0212010 14:38:27 Inspection 1 Activity Plan Report 22 01/01/2010 - 06/30/2011 IiTnit Planned Oates If\lumber Start End Title 7112405 - RAD MONITORING INSTRUMENTS 1 02108/2010 02112/2010 lP 71124.05 Radiation Monitoring Instrumentation 7111107T - TRIENNIAL HEAT SINK 04119/2010 04123/2010 IP 711110n Heat Sink Performance 71124 - RADIATION SAFETY 05/1712010 05121/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 05/17/2010 0512112010 IP 71124.02 Occupational ALARA Planning and Controls 05/17/2010 0512112010 tP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 05/1712010 05/21/2010 IP 71124.05 Radiation MonitOring Instrumentation TI*177 - MANAGING GAS ACCUMULATION IN ECCS 2 0612112010 06/2512010 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal 8. Containment Spray System 25151173 -INDUSTRY GROUND WATER INITIATIVE 07/1212010 07/16/2010 IP 25151173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 71124.06
- PUB RAD SAFETY - EFFLUENTS 07/12/2010 07/1612010 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 07/1212010 07/1612010 IP 71151 Performance Indicator Verification MODS - PERMANENT PLANT MODIFICATIONS 3 0911312010 09/17/2010 IP 711111n Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 09/27/2010 10/01/2010 1P 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 71124
- RAD SAFETY - RAD HAZZARD ASSESJALARA 10/18/2010 1012212010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1011812010 10/2212010 IP 71124.02 Occupational ALARA Planning and Controls 10/1812Q10 10/2212010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitfgation 10/1812010 10122/2010 IP 71151 Performance Indicator Verification EPEX - EP EXERCISE EVALUATION 4 1115/2010 11/19/2010 IP 7111401 Exercise Evaluation 11/15/2010 11/19/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/1512010 11/19/2010 IP 71151-EP01 DrilVExercise Performance 1 11/1512010 11/19/2010 IP 71151*EP02 ERO Drill Participation 11/15/2010 11/1912010 IP 71151-EP03 Alert & Notification System 711528 -PI&R 4 0211412011 0211812011 IP 711528 Identification and Resolution of Problems 0212812011 03/04/2011 IP 711528 Identification and Resolution of Problems 71124.01 - RAD HAZARD ASSESS OUT, ALARA. AIR, DOSE 02114/2011 0211812011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
'Mis report does not inciude INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 20f2 Pilgrim 03/0212010 14:38:27 Inspection / Activity Plan Report 22 01/01/2010
pjinnedCates Start End Title 71124.01 - RAe HAZARD ASSESS OUT, AURA, AIR, DOSE 1 02114/2011 02/18J2011 IP 71124.02 Occupational ALARA Planning and Controls 02114/2011 02/1812011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 02/14/2011 0211812011 IP 71124.04 Occupational Dose Assessment 71124.01 - RAD HAZARD ASSESS OUT, ALARA,AIR, DOSE 04125/2011 04/29/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 04/25/2011 04129/2011 IP 71124.02 Occupational ALARA Planning and Controls 04/25/2011 0412912011 IP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation 04/2512011 04129/2011 IP 71124.04 OCClJpational Dose Assessment 0412512011 04129/2011 IP 71124.05 Radiation Monitoring Instrumentation 711110BG -INSERVICE INSPECTION 1 0510212011 05/0612011 IP 7111108G Inservice Inspection Activities* BWR 71124.07 - REMP 06113/2011 06/17/2011 IP 71124.07 Public Radiation Safety 06/13/2011 06/1712011 IP 71151-PR01 RETS/ODCM Radiological Effluent his report does not include iNPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.