Annual Assessment Letter
ML100621417
Person / Time
Site: Pilgrim
Issue date: 03/03/2010
From: Diane Jackson
NRC/RGN-I/DRP/PB5
To: Bronson K
Entergy Nuclear Operations
Shared Package
ML100541700 List:
References
IR-10-001
Download: ML100621417 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 3, 2010 Mr. Kevin Bronson Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA, 02360-5508

SUBJECT:

ANNUAL ASSESSMENT LETTER - PILGRIM NUCLEAR POWER STATION (REPORT 05000293/2010001)

Dear Mr. Bronson:

On February 9, 2009, the NRC staff completed its performance review of the Pilgrim Nuclear Power Station (Pilgrim). Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, Pilgrim operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a Jevel requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facJlity.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2011. The inspection plan is provided to aI/ow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

K. Bronson 2

In accordance with 1 OCFR2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan. we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5306 with any questions you may have regarding this letter or the inspection plan.

Sincerely,.J-~J=1-Do~on, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-293 License Nos. DPR-35

Enclosure:

Pilgrim Inspection/ Activity Plan cc w/encl:

Distribution via ListServ

K. Bronson 2

In accordance with 10CFR2.390 of the NRC's "Rules of Practice," a copy of this Jetter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan. we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5306 with any questioQs you may have regarding this letter or the inspection plan.

Sincerely.

IRN Donald E. Jackson. Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-293 License Nos. DPR-35 Distribution w/encl: (via email)

S. Collins, RA (R10RAMAIL RESOURCE)

B. Smith. DRP, RI M. Dapas, ORA (R10RAMAIL RESOURCE)

A. Ford. ORP, Resident OA D. Lew, ORP (R1DRPMAIL RESOURCE)

RldsNrrPMPlIgrlm Resource J. Clifford. DRP (R1ORPMAIL RESOURCE)

RldsNrrDorfLPL1*1 Resource RQPreports.Resource@nrc.gov D. Roberts, DRS (R1DRSMaii Resource)

DRS Branch Chiefs (6)

P. Wilson, DRS (R1DRSMail Resource)

L Scholl, DRS L Troclne, RI OEOO D. Silk. DRS D. Jackson, DRP J. Trapp, DRS T. Setzer. DR?

D. Screne!, PAQ J. Heinly, DRP N. Sheehan, PAD B. Seinel, DRP R. Barkley, ORA M. Schneider, ORP, SRI SUNSI Review Complete: _....;T_C:;,.;:S::..-.__ (Reviewer's Initials)

ML100621417 DOCUMENT NAME: S;\\ROP*10 EOC Review\\Branch 5\\PG\\2009 Annual Assessment Letter PG.doc After declaring this document "An Official Agency Recordu it will be released to the Public.

To receive a copy of this doc;ument, Indicate in the box: *C" =Copy without attachment/enclosure "En:o Copy with attachment/enclosure "N" =No copy OFFICE RIIDRP RI/DRP l

RIIDRP NAME T SetzerlTS D Jackson/ALB for ABurrittiALB DATE 0312110 0312/10 3/2110 OFFICIAL RECORD COpy

Page 1 of2 Pilgrim 03/0212010 14:38:27 Inspection 1Activity Plan Report 22 01/01/2010 - 06/30/2011 IiTnit Planned Oates If\\lumber Start End Title 02108/2010 04119/2010 05/1712010 05/17/2010 05/17/2010 05/1712010 0612112010 07/1212010 07/12/2010 07/1212010 0911312010 09/27/2010 10/18/2010 1011812010 10/1812Q10 10/1812010 1115/2010 11/15/2010 02112/2010 04123/2010 05121/2010 0512112010 0512112010 05/21/2010 06/2512010 07/16/2010 07/1612010 07/1612010 09/17/2010 10/01/2010 1012212010 10/2212010 10/2212010 10122/2010 11/19/2010 11/19/2010 7112405 lP 71124.05 7111107T IP 711110n 71124 IP 71124.01 IP 71124.02 tP 71124.03 IP 71124.05 TI*177 IP 2515/177 25151173 IP 25151173 71124.06 IP 71124.06 IP 71151 MODS IP 711111n 1 P 7111117T 71124 IP 71124.01 IP 71124.02 IP 71124.03 IP 71151 EPEX IP 7111401 IP 7111404 1

Radiation Monitoring Instrumentation

- TRIENNIAL HEAT SINK Heat Sink Performance

- RADIATION SAFETY Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airborne Radioactivity Control and Mitigation Radiation MonitOring Instrumentation

- MANAGING GAS ACCUMULATION IN ECCS 2

Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal 8. Containment Spray System

-INDUSTRY GROUND WATER INITIATIVE Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative

- RAD MONITORING INSTRUMENTS

  • PUB RAD SAFETY - EFFLUENTS Radioactive Gaseous and Liquid Effluent Treatment Performance Indicator Verification

- PERMANENT PLANT MODIFICATIONS 3

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

  • RAD SAFETY - RAD HAZZARD ASSESJALARA Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airborne Radioactivity Control and Mitfgation Performance Indicator Verification

- EP EXERCISE EVALUATION 4

Exercise Evaluation Emergency Action Level and Emergency Plan Changes 1

11/1512010 11/19/2010 IP 71151-EP01 DrilVExercise Performance 1

11/1512010 11/19/2010 IP 71151*EP02 ERO Drill Participation 11/15/2010 11/1912010 IP 71151-EP03 Alert & Notification System 711528 0211412011 0211812011 IP 711528 0212812011 03/04/2011 IP 711528 71124.01 02114/2011 0211812011 IP 71124.01

-PI&R Identification and Resolution of Problems Identification and Resolution of Problems

- RAD HAZARD ASSESS OUT, ALARA. AIR, DOSE Radiological Hazard Assessment and Exposure Controls

'Mis report does not inciude INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

4

Page 20f2 Pilgrim 03/0212010 14:38:27 Inspection / Activity Plan Report 22 01/01/2010

  • 06/30/2011

pjinnedCates Start End Title 02114/2011 02114/2011 02/14/2011 04125/2011 04/25/2011 04/25/2011 04/2512011 0412512011 0510212011 06113/2011 06/13/2011 02/18J2011 02/1812011 0211812011 04/29/2011 04129/2011 0412912011 04129/2011 04129/2011 05/0612011 06/17/2011 06/1712011 71124.01

- RAe HAZARD ASSESS OUT, AURA, AIR, DOSE 1

IP 71124.02 Occupational ALARA Planning and Controls IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation IP 71124.04 Occupational Dose Assessment 71124.01

- RAD HAZARD ASSESS OUT, ALARA,AIR, DOSE IP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.02 Occupational ALARA Planning and Controls IP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation IP 71124.04 OCClJpational Dose Assessment IP 71124.05 Radiation Monitoring Instrumentation 711110BG

-INSERVICE INSPECTION 1

IP 7111108G Inservice Inspection Activities* BWR 71124.07

- REMP IP 71124.07 Public Radiation Safety IP 71151-PR01 RETS/ODCM Radiological Effluent his report does not include iNPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.