J. Dent UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 December 18, 2015 Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
PILGRIM NUCLEAR POWER STATION - NOTIFICATION OF INSPECTION PROCEDURE 95003 PHASE A AND PHASE B INSPECTIONS
Dear Mr. Dent:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the Inspection Procedure (IP) 95003 inspection, described in the mid-cycle assessment letter issued on September 1, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15239A647) in three phases (A through C).
The information provided in this letter supplements, but does not supersede, the inspection plan information included in the mid-cycle letter.
The Phase A and Phase B portions of IP 95003 will be conducted during the weeks of January 11, 2016, and April 4, 2016, respectively. Each inspection will consist of three inspectors from the NRCs Region I office. Both inspections will be conducted in accordance with IP 95003, Section 02.02, and will serve as partial completion of this portion of the IP.
Phase A of this inspection will review various aspects of the stations corrective action program to determine whether continued operation of the Pilgrim Nuclear Power Station is acceptable and whether additional regulatory actions are necessary to arrest declining plant performance.
Phase B will look at overall corrective action program performance since the last problem identification and resolution inspection completed in August 2015, focusing in particular on progress in the sites performance improvement plan. The results of these two phases will inform the final scope for the Phase C inspection and once your staff has indicated it is ready, we will schedule Phase C. An updated inspection plan is attached.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5069 with any questions you have regarding this letter.
Sincerely,
/RA/
Arthur L. Burritt, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.
50-293 License No.
Enclosure:
Pilgrim Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML15352A128 SUNSI Review Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME LCline/LMC CBickett/LMC for ABurritt/ALB DATE 12/18/15 12/18/15 12/9/15
Page 1 of 2 12/10/2015 21:06:59 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Pilgrim Inspection / Activity Plan 01/01/2016 - 12/31/2017 95003
- 95003 PHASE A INSPECTION 4
1 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inp 95003 01/11/2016 01/15/2016 TI-191
- FUKUSHIMA LESSONS-LEARNED 2
1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 03/21/2016 03/25/2016 71124
- 01 EXPOSURE CONTROL 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/21/2016 03/24/2016 95003
- 95003 PHASE B INSPECTION 1
1 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inp 95003 04/04/2016 04/08/2016 71124
- 05 RAD MONITORING INSTRUMENTATION 1
1 IP Radiation Monitoring Instrumentation 71124.05 05/02/2016 05/06/2016 7111117T
- PERMANENT PLANT MODIFICATIONS 4
1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 05/02/2016 05/06/2016 1
IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 05/16/2016 05/20/2016 7111107T
- TRIENNIAL HEAT SINK 1
1 IP Heat Sink Performance 7111107T 07/18/2016 07/22/2016 2/27EXM
- PILGRIM INITIAL EXAM 4
1 FY17-PILGRIM INITIAL OPERATOR LICENSING EXAM U01945 01/30/2017 02/05/2017 1
FY17-PILGRIM INITIAL OPERATOR LICENSING EXAM U01945 02/27/2017 03/03/2017 EP
- EP EXERCISE EVALUATION 4
1 IP Exercise Evaluation 7111401 11/14/2016 11/18/2016 71124
- 71151 PI VERIFY 71124.01EXPCONT05RAD MON 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/21/2016 11/25/2016 1
IP Radiation Monitoring Instrumentation 71124.05 11/21/2016 11/25/2016 1
IP Occupational Exposure Control Effectiveness 71151-OR01 11/21/2016 11/25/2016 1
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/21/2016 11/25/2016 7111108G
- INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - BWR 7111108G 04/24/2017 04/28/2017 71124
- 71124.01 RAD HAZARD AND 71124.02 ALARA 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/24/2017 04/27/2017 1
IP Occupational ALARA Planning and Controls 71124.02 04/24/2017 04/27/2017 71124.08
- RADWASTE 1
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 06/05/2017 06/09/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 12/10/2015 21:06:59 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Pilgrim Inspection / Activity Plan 01/01/2016 - 12/31/2017 71124
- RAD HAZ-ALARA-AIRBORNE-DOSIMETRY 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/19/2017 06/23/2017 1
IP Occupational ALARA Planning and Controls 71124.02 06/19/2017 06/23/2017 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/19/2017 06/23/2017 1
IP Occupational Dose Assessment 71124.04 06/19/2017 06/23/2017 7111111B
- PILGRIM REQUAL INSP W/ P/F RESULTS 2
1 IP Licensed Operator Requalification Program 7111111B 09/04/2017 09/08/2017 71124
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/07/2017 08/11/2017 71152B
- PI&R BIENNIAL TEAM INSPECTION 5
1 IP Problem Identification and Resolution 71152B 09/11/2017 09/15/2017 1
IP Problem Identification and Resolution 71152B 09/25/2017 09/29/2017 71124
1 IP Radiological Environmental Monitoring Program 71124.07 09/18/2017 09/21/2017 71124
- 71151 PI VERIFY71124.02ALARA06RETS07REMP 1
1 IP Occupational ALARA Planning and Controls 71124.02 11/20/2017 11/23/2017 1
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/20/2017 11/23/2017 1
IP Radiological Environmental Monitoring Program 71124.07 11/20/2017 11/23/2017 1
IP Occupational Exposure Control Effectiveness 71151-OR01 11/20/2017 11/23/2017 1
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/20/2017 11/23/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
J. Dent UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 December 18, 2015 Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
PILGRIM NUCLEAR POWER STATION - NOTIFICATION OF INSPECTION PROCEDURE 95003 PHASE A AND PHASE B INSPECTIONS
Dear Mr. Dent:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the Inspection Procedure (IP) 95003 inspection, described in the mid-cycle assessment letter issued on September 1, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15239A647) in three phases (A through C).
The information provided in this letter supplements, but does not supersede, the inspection plan information included in the mid-cycle letter.
The Phase A and Phase B portions of IP 95003 will be conducted during the weeks of January 11, 2016, and April 4, 2016, respectively. Each inspection will consist of three inspectors from the NRCs Region I office. Both inspections will be conducted in accordance with IP 95003, Section 02.02, and will serve as partial completion of this portion of the IP.
Phase A of this inspection will review various aspects of the stations corrective action program to determine whether continued operation of the Pilgrim Nuclear Power Station is acceptable and whether additional regulatory actions are necessary to arrest declining plant performance.
Phase B will look at overall corrective action program performance since the last problem identification and resolution inspection completed in August 2015, focusing in particular on progress in the sites performance improvement plan. The results of these two phases will inform the final scope for the Phase C inspection and once your staff has indicated it is ready, we will schedule Phase C. An updated inspection plan is attached.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5069 with any questions you have regarding this letter.
Sincerely,
/RA/
Arthur L. Burritt, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.
50-293 License No.
Enclosure:
Pilgrim Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML15352A128 SUNSI Review Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME LCline/LMC CBickett/LMC for ABurritt/ALB DATE 12/18/15 12/18/15 12/9/15
Page 1 of 2 12/10/2015 21:06:59 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Pilgrim Inspection / Activity Plan 01/01/2016 - 12/31/2017 95003
- 95003 PHASE A INSPECTION 4
1 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inp 95003 01/11/2016 01/15/2016 TI-191
- FUKUSHIMA LESSONS-LEARNED 2
1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 03/21/2016 03/25/2016 71124
- 01 EXPOSURE CONTROL 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/21/2016 03/24/2016 95003
- 95003 PHASE B INSPECTION 1
1 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inp 95003 04/04/2016 04/08/2016 71124
- 05 RAD MONITORING INSTRUMENTATION 1
1 IP Radiation Monitoring Instrumentation 71124.05 05/02/2016 05/06/2016 7111117T
- PERMANENT PLANT MODIFICATIONS 4
1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 05/02/2016 05/06/2016 1
IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 05/16/2016 05/20/2016 7111107T
- TRIENNIAL HEAT SINK 1
1 IP Heat Sink Performance 7111107T 07/18/2016 07/22/2016 2/27EXM
- PILGRIM INITIAL EXAM 4
1 FY17-PILGRIM INITIAL OPERATOR LICENSING EXAM U01945 01/30/2017 02/05/2017 1
FY17-PILGRIM INITIAL OPERATOR LICENSING EXAM U01945 02/27/2017 03/03/2017 EP
- EP EXERCISE EVALUATION 4
1 IP Exercise Evaluation 7111401 11/14/2016 11/18/2016 71124
- 71151 PI VERIFY 71124.01EXPCONT05RAD MON 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/21/2016 11/25/2016 1
IP Radiation Monitoring Instrumentation 71124.05 11/21/2016 11/25/2016 1
IP Occupational Exposure Control Effectiveness 71151-OR01 11/21/2016 11/25/2016 1
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/21/2016 11/25/2016 7111108G
- INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - BWR 7111108G 04/24/2017 04/28/2017 71124
- 71124.01 RAD HAZARD AND 71124.02 ALARA 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/24/2017 04/27/2017 1
IP Occupational ALARA Planning and Controls 71124.02 04/24/2017 04/27/2017 71124.08
- RADWASTE 1
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 06/05/2017 06/09/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 12/10/2015 21:06:59 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Pilgrim Inspection / Activity Plan 01/01/2016 - 12/31/2017 71124
- RAD HAZ-ALARA-AIRBORNE-DOSIMETRY 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/19/2017 06/23/2017 1
IP Occupational ALARA Planning and Controls 71124.02 06/19/2017 06/23/2017 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/19/2017 06/23/2017 1
IP Occupational Dose Assessment 71124.04 06/19/2017 06/23/2017 7111111B
- PILGRIM REQUAL INSP W/ P/F RESULTS 2
1 IP Licensed Operator Requalification Program 7111111B 09/04/2017 09/08/2017 71124
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/07/2017 08/11/2017 71152B
- PI&R BIENNIAL TEAM INSPECTION 5
1 IP Problem Identification and Resolution 71152B 09/11/2017 09/15/2017 1
IP Problem Identification and Resolution 71152B 09/25/2017 09/29/2017 71124
1 IP Radiological Environmental Monitoring Program 71124.07 09/18/2017 09/21/2017 71124
- 71151 PI VERIFY71124.02ALARA06RETS07REMP 1
1 IP Occupational ALARA Planning and Controls 71124.02 11/20/2017 11/23/2017 1
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/20/2017 11/23/2017 1
IP Radiological Environmental Monitoring Program 71124.07 11/20/2017 11/23/2017 1
IP Occupational Exposure Control Effectiveness 71151-OR01 11/20/2017 11/23/2017 1
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/20/2017 11/23/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.