ML20017A267
| ML20017A267 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 01/15/2020 |
| From: | Fred Bower Plant Support Branch 1 |
| To: | Moylan J Holtec Decommissioning International |
| Bower F | |
| References | |
| Download: ML20017A267 (3) | |
Text
ML20017A267 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DNMS RI/DRS NAME JRey/JR ADimitriadis/JM for FBower/FLB DATE 12/18/2019 01/10/2020 01/13/2020
Pilgrim 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count Access Auth, Access Control, Equipment Performance-PL 2
1 11/02/2020 11/06/2020 IP 81200.01 000024 Access Authorization for Decommissioning Nuclear Power Reactors 1
11/02/2020 11/06/2020 IP 81200.02 000025 Access Control for Decommissioning Nuclear Power Reactors 1
11/02/2020 11/06/2020 IP 81200.04 000026 Equipment Performance, Testing, and Maintenance for Decommissioning Nuclear Power Reactors Access Control, Training, Protective Strategy, TSR-PL 3
1 04/19/2021 04/23/2021 IP 81200.02 000025 Access Control for Decommissioning Nuclear Power Reactors 1
04/19/2021 04/23/2021 IP 81200.05 000027 Protective Strategy Evaluation and Performance Evaluation Program for Decommissioning Nuclear Reactors 1
04/19/2021 04/23/2021 IP 81200.07 000029 Security Training for Decommissioning Nuclear Power Reactors 1
04/19/2021 04/23/2021 IP 81200.14 000030 Review of Decommissioning Reactor Target Sets 10/30/2019 1:25:59 PM Page 1 of 1 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report