ROP 8 - Pilgrim - Change to Inspection Plan, 12/13/07
ML073470954
Person / Time
Site: Pilgrim
Issue date: 12/13/2007
From: Racquel Powell
NRC/RGN-I/DRP/PB5
To: Bronson K
Entergy Nuclear Operations
POWELL, R
References
Download: ML073470954 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. Kevin Bronson Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT:

CHANGE TO THE INSPECTION PLAN - PILGRIM NUCLEAR POWER STATION

Dear Mr. Bronson:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

2 K. Bronson Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-293 License No. DPR-35

Enclosures:

Pilgrim Nuclear Power Station Inspection/Activity Plans cc w/encl:

G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.

J. Wayne Leonard, Chairman and CEO, Entergy Operations J. T. Herron, Senior Vice President, Engineering Nuclear Operations M. Balduzzi, Senior Vice President, Northeastern Regional Operations S. J. Bethay, Director, Nuclear Safety Assurance O. Limpias, Vice President, Engineering J. DeRoy, Vice President, Operations Support Sr. Vice President, Engineering and Technical Services J. F. McCann, Director, Nuclear Safety and Licensing J. Lynch, Manager, Licensing, Entergy Nuclear Operations, Inc.

J. Ventosa, General Manager, Engineering E. Harkness, Director of Oversight, Entergy Nuclear Operations, Inc.

B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.

D. Burke, Manager, Security, Entergy Nuclear Operations, Inc.

R. Smith, Manager, Plant Operations W. Dennis, Assistant General Counsel, Entergy Nuclear Operations, Inc.

S. Lousteau, Treasury Department, Entergy Services, Inc.

Director, Radiation Control Program, Commonwealth of Massachusetts W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Electric Power Division, Commonwealth of Massachusetts

3 K. Bronson R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant J. Doering, PWR SRC Consultant W. Meinert, Nuclear Engineer J. Giarrusso, MEMA, SLO Commonwealth of Massachusetts, Secretary of Public Safety

2 K. Bronson Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-293 License No. DPR-35

Enclosures:

Pilgrim Nuclear Power Station Inspection/Activity Plans Distribution w/encl:

S. Collins, RA M. Dapas, DRA G. West, RI OEDO (Acting)

R. Powell, DRP B. Norris, DRP M. Kowal, NRR J. Kim, PM, NRR J. Boska, NRR J. Lubinski, NRR S. Schneider, DRP, Senior Resident Inspector N. Sieller, DRP A. Ford, DRP, Resident OA Region I Docket Room (w/concurrences)

RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov J. Trapp, DRS J. Rogge, DRS M. Sykes, DRS J. White, DRS L. Doerflein, DRS R. Conte, DRS L. Scholl, DRS P. Frechette, DRS D. Silk, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)

SUNSI Review Complete: RJP (Reviewer=s Initials)

DOCUMENT NAME: pilgrim_Dec.doc After declaring this document AAn Official Agency Record@ it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME NSieller/NSS RPowell/RJP DATE 12/12/07 12/12/07 OFFICIAL RECORD COPY

Pilgrim Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 12/11/2007 14:31:51 Report 22 1

71121

- OCC RAD SAFETY Baseline Inspections 01/07/2008 01/11/2008 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 01/07/2008 01/11/2008 1

7112102 IP ALARA Planning and Controls Baseline Inspections 01/07/2008 01/11/2008 1

71151 IP Performance Indicator Verification 4

EP

- EP EXERCISE EVALUATION EP Baseline Inspectio 03/31/2008 04/04/2008 1

7111401 IP Exercise Evaluation EP Baseline Inspectio 03/31/2008 04/04/2008 1

7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/31/2008 04/04/2008 1

71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/31/2008 04/04/2008 1

71151-EP02 IP ERO Drill Participation Baseline Inspections 03/31/2008 04/04/2008 1

71151-EP03 IP Alert & Notification System 1

71121

- OCC RAD SAFETY Baseline Inspections 04/07/2008 04/11/2008 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/07/2008 04/11/2008 1

7112102 IP ALARA Planning and Controls Baseline Inspections 04/07/2008 04/11/2008 1

71151 IP Performance Indicator Verification 10 7111121

- CDBI Baseline Inspections 04/28/2008 05/02/2008 1

7111121 IP Component Design Bases Inspection Baseline Inspections 05/12/2008 05/16/2008 1

7111121 IP Component Design Bases Inspection Baseline Inspections 05/19/2008 05/23/2008 1

7111121 IP Component Design Bases Inspection 1

71121

- OCC RAD SAFETY Baseline Inspections 06/02/2008 06/06/2008 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 06/02/2008 06/06/2008 1

7112102 IP ALARA Planning and Controls Baseline Inspections 06/02/2008 06/06/2008 1

71151 IP Performance Indicator Verification 1

7112201

- PUB RADSAFETY - RETS Baseline Inspections 07/07/2008 07/11/2008 1

7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/07/2008 07/11/2008 1

71151 IP Performance Indicator Verification 1

71121

- OCC RAD SAFETY Baseline Inspections 08/11/2008 08/15/2008 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/11/2008 08/15/2008 1

7112102 IP ALARA Planning and Controls Baseline Inspections 08/11/2008 08/15/2008 1

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/11/2008 08/15/2008 1

71151 IP Performance Indicator Verification 1

7112103

- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 10/20/2008 10/24/2008 1

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 10/20/2008 10/24/2008 1

71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.