IR 05000293/2014006

From kanterella
Jump to navigation Jump to search
Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Pilgrim Nuclear Power Station (Report 05000293-14-006)
ML14241A398
Person / Time
Site: Pilgrim
Issue date: 09/02/2014
From: Bill Dean
Region 1 Administrator
To: Dent J
Entergy Nuclear Operations
McKinley R
References
IR-2014-006
Download: ML14241A398 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 September 2, 2014 Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR PILGRIM NUCLEAR POWER STATION (REPORT 05000293/2014006)

Dear Mr. Dent:

On August 12, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Pilgrim Nuclear Power Station (Pilgrim). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2013 through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Pilgrim during the most recent quarter was within the Degraded Cornerstone Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because two white performance indicators were crossed in the Initiating Events cornerstone. In the third quarter of 2013, the unplanned SCRAMS with complications performance indicator crossed the green to white threshold, which moved Pilgrim to the regulatory response column from the licensee response column. Due to a SCRAM on October 14, 2013, Pilgrim crossed the green to white threshold for a second performance indicator for unplanned SCRAMs per 7000 critical hours.

The NRC will conduct a supplemental inspection to review the actions taken to address the performance issues when your staff notifies the NRC of your readiness. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area, when Pilgrim has completed these actions.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. During the 2014 mid-cycle assessment review, cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310, and were evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305. The NRC evaluates cross-cutting themes to determine whether a substantive cross-cutting issue exists in a particular area and to encourage licensees to take appropriate actions before more significant performance issues emerge. The NRC identified a cross-cutting theme in the Problem Identification and Resolution area. Specifically, the NRC identified four findings with a documented cross-cutting aspect of P.3 - Resolution of Corrective Actions. The NRC determined that a substantive cross-cutting issue associated with aspect P.3 does not exist because your staffs scope of effort and progress in addressing the cross-cutting theme are still ongoing and we have not identified any additional cross-cutting aspects with P.3. Entergy has recognized the cross-cutting theme and has initiated actions to develop an improvement plan.

The NRC will continue to monitor your staffs effort and progress in addressing the theme until the theme criteria are no longer met.

The enclosed inspection plan lists the inspections scheduled through December 31, 2015.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. In addition to baseline inspections, the NRC will perform IP 60854.1, Preoperational Testing of an Independent Spent Fuel Storage Facility Installations at Operating Plants, IP 60855.1, Operation of an Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants, and IP 60856.1, Review of 10 CFR 72.212(b)

Evaluations. These Inspections will provide oversight to the construction and operation of your ISFSI. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is scheduled for the week of October 6, 2014. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Raymond McKinley at (610)337-5150 with any questions you have regarding this letter.

Sincerely,

/RA/

William M. Dean Regional Administrator Docket No. 50-293 License No. DPR-35 Enclosure: Pilgrim Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML14241A398 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/ORA NAME SShaffer/SWS RMcKinley/RRM HNieh/HKN WDean/WMD DATE 08/26/14 08/27/14 08/28/14 08/29/14

Page 1 of 2 Pilgrim 08/27/2014 14:03:23 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - DRY RUN & INITIAL ISFSI INSPECTION 3 1 09/01/2014 09/19/2014 IP 60854 Preoperational Testing Of An ISFSI 1 09/01/2014 09/19/2014 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1 09/01/2014 09/19/2014 IP 60855 Operation Of An ISFSI 1 09/01/2014 09/19/2014 IP 60856 Review of 10 CFR 72.212(b) Evaluations 1 09/01/2014 09/19/2014 IP 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants 1 09/22/2014 09/26/2014 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants ISFSI - DRY RUN & INITIAL ISFSI INSPECTION 3 1 10/01/2014 11/28/2014 IP 60854 Preoperational Testing Of An ISFSI 1 10/01/2014 11/28/2014 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1 10/01/2014 11/28/2014 IP 60855 Operation Of An ISFSI 1 10/01/2014 11/28/2014 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1 10/01/2014 11/28/2014 IP 60856 Review of 10 CFR 72.212(b) Evaluations 1 10/01/2014 11/28/2014 IP 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants 71124 - 71151 PI VERIFY 71124.01 AND 71124.05 HP 1 1 11/03/2014 11/06/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/03/2014 11/06/2014 IP 71124.05 Radiation Monitoring Instrumentation 1 11/03/2014 11/06/2014 IP 71151 Performance Indicator Verification 71124 - 01 EXPOSURE CONTROL 02 ALARA 1 1 03/02/2015 03/05/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/02/2015 03/05/2015 IP 71124.02 Occupational ALARA Planning and Controls EP - EP PROGRAM INSPECTION 1 1 03/16/2015 03/20/2015 IP 7111402 Alert and Notification System Testing 1 03/16/2015 03/20/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 03/16/2015 03/20/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 7111108G - INSERVICE INSPECTION 1 1 04/20/2015 04/24/2015 IP 7111108G Inservice Inspection Activities - BWR 71124 - 01 EXPOSURE 02 ALARA 03 AIRBORNE 04 DOSE 1 1 05/04/2015 05/08/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 05/04/2015 05/08/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 05/04/2015 05/08/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/04/2015 05/08/2015 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Pilgrim 08/27/2014 14:03:23 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124.08 - RADWASTE 1 1 06/08/2015 06/12/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - RADIOACTIVE EFFLUENT CONTROL RETS 1 1 06/22/2015 06/26/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - REMP 1 1 07/20/2015 07/23/2015 IP 71124.07 Radiological Environmental Monitoring Program PI&R - PI&R - BIENNIAL 1 1 08/03/2015 08/07/2015 IP 71152B Problem Identification and Resolution 1 08/17/2015 08/21/2015 IP 71152B Problem Identification and Resolution 7111111B - REQUAL INSP W/ P/F RESULTS 2 1 10/19/2015 10/23/2015 IP 7111111B Licensed Operator Requalification Program TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 11/02/2015 11/06/2015 IP 7111105T Fire Protection [Triennial]

1 11/16/2015 11/20/2015 IP 7111105T Fire Protection [Triennial]

71151 - RP CHEM PI VERIFY 1 1 11/16/2015 11/19/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/16/2015 11/19/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 11/16/2015 11/19/2015 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure