MONTHYEARML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J2431999-06-29029 June 1999 Informs That Author Received Call from NRR on Dirt Spreading Ltr & Questions Re Cover Ltr Statement Where Util Asks to Be Allowed to Dispose of Future Soil in Same Manner Provided Same Acceptance Criteria Met ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195C5891999-05-27027 May 1999 Forwards Response to NRC 990301 RAI Re GL 96-05 Program at Vermont Yankee Nuclear Power Station ML20195D5341999-05-27027 May 1999 Forwards Description of Vermont Yankees Plans for Insp of & Mods to Certain Reactor Vessel Internals BVY-99-074, Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld1999-05-26026 May 1999 Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld ML20195B4081999-05-24024 May 1999 Withdraws Licensee Commitment,Contained in ,To Reinitiate ITS Project Following Completion of FSAR Accuracy Verification Project.Util Will Continue to Modify Current TS with Number of Improvements BVY-99-067, Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License1999-05-21021 May 1999 Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License ML20196L1801999-05-18018 May 1999 Withdraws Licensee & Attachment,Containing Rev 2 to Vermont Yankee Operational QA Manual, from Further Consideration by Nrc.Summary of Commitments Encl ML20206K3201999-05-0707 May 1999 Forwards Response to RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206D3731999-04-27027 April 1999 Informs NRC of Changes in Recipients of NRC Docketed Correspondence ML20206B1401999-04-23023 April 1999 Forwards Replacement of Section 3(a) of NSHC Determination Provided by Re TS Proposed Change 208,suppl Section 6 ML20205S3381999-04-16016 April 1999 Submits Revised Schedule for Response to NRC 990226 RAI Re 980630 Submittal of IPEEE Rept.Info Will Be Submitted by 991231 ML20205S3891999-04-16016 April 1999 Forwards non-proprietary & Proprietary Revised Page to Holtec Rept HI-981932,supplementing TS Proposed Changed 207 Re Spent Fuel Pool Storage Capacity Expansion ML20205S3031999-04-15015 April 1999 Forwards Revised TS Bases Pages 90,227,164 & 221a,accounting for Change in Reload Analysis from Yaec to GE Methodology, Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20205P9291999-04-14014 April 1999 Requests That Rev to NRC 821029 SER for NUREG-0737,Item II.K.3.24,be Issued to Clarify Util Installed RCIC & HPCI HVAC Configuration,As Discovered During Preparation of DBDs for Sys ML20205P8191999-04-13013 April 1999 Forwards Rev 2 to COLR for Vermont Yankee Cycle 20, Dtd Feb 1999,IAW TS Section 6.7.A.4 ML20205M3191999-04-0707 April 1999 Forwards 1998 Annual Rept of Results of Individual Monitoring, Per 10CFR20.2206(b).Licensee Is Submitting Matl to Only Addressee Specified in 10CFR20.2206(c).Without Encl ML20205K0351999-03-31031 March 1999 Informs That Certain Addl Corrections Warranted for 990121 SER for Amend 163 to License DPR-28 Re Suppression Pool Water Temp.Suggested Corrections Listed ML20205K1821999-03-31031 March 1999 Informs of Modifications That Util Made to CO(2) Fire Suppression Sys,Due to Sen 188 Which Occurred at Ineel on 980728.Compensatory Actions Will Remain in Place Until Modifications Are Complete & Systems Are Returned to Svc ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee 1999-09-29
[Table view] |
Text
.. . . . . - - -
s-
..;\,
~'l VERMONT YANKEE' '
NUCLEAR POWER CORPORATION
.- Ferry Road, Brattleboro. VT 05301-7002 ENGINEERING OFFICE
- 580 MAIN STREET BOLION. M A 01740 (508)779 6711 December 12,1994 .
BVY 94 - 124 [
5 United States Nuclear Regulatory Commission A'ITN: Document Control Desk Washington, DC 20555
References:
- a. License No. DPR-28 (Dock-t No. 50-271)
- b. Ietter, VYNPC to USNRC, BVY 93-137, dated December 3,1993 '
- c. 12tter, USNRC to VYNPC, NVY 94-177, dated October 12,1994 ;
Subject:
Response to Request for Additional Information on the Vermont Yankee Thini [
10-Yee' Interva) Inservice Inspection (ISI) Program Plan and Associated Requests for Relief ;
The 'Ihird Interval Inservice Inspection (ISI) Pmgram and associated relief requests for the Vermont Yankee facility were submitted for NRC review via Reference (b). NRC requested additional information with regant to this review effort via Reference (c).
Enclosed please find Vermont Yankee's response to NRC's request for additional information.
As requested, a copy of this response is also being sent to NRC's contractor, INEL. .
t As per our responses to Items E, F, and H in the enclosure, Vermont Yankee intends to revise the Third Interval ISI Program. We anticipate completion and submittal of the revised Pmgram document by March 31,1995.
In addition, in onler to supplement our response to Item C in the enclosure, Vermont Yankee is in the process of completing up-to< late system drawings (P& ids) that comprise the scope of the third interval program. To assist NRC in review completion, we anticipate submittal of these !
drawings by January 15,1995. l Should you have further questions or require additional information, please contact this office.
Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION OYb -
A % .
Leonard A. Tremblay, Jr., P.E. (
SeniorLicensing Engineer
! 9412210048 941212 I l PDR ADOCK 05000271 i i
,P PDR gl I
, . VisitMoNT YANhlili Ntr.t.er. Ant l'aiws:st Conti ostA1 oN United States Nuclear Regulatory Commisrion '
December 12,1994 Page 2 :
oc: USNRC Region I Administrator USNRC Resident inspector- VYNPS USNRC Pmject Manager- VYNPS Mr. Boyd W. Bmwn -
INEL Research Center 2151 North Boulevard P.O. Box 1625 Idaho Falls, Idaho 83415-2209
Enclosure to BVY 94-124 KTRC Additlnnal infnrmatinn Ronutrad.
A. Address the degree of compliance with augmented examinations that have !
been established by the NRC when added assurance of structural reliability is .
deemed necessary. Examples of documents that address augmented examinations based on licensee commitments are listed below.
(1) Branch Technical Position MEB 3-1, High Energy Fluid Systems,-
Protection Against Postulated Piping Failures in Fluid Systems Outside Containment; (2) Regulatory Guide 1.150, Ultrasonic Testing of Reactor Vessel Welds l During Preservice and Inservice Examination; (3) NUREG-0619, BWR Feedwater Nozzle and CRD Return Line Nozzle l Crackip (4) NUREG-0803, Integrity of B W R Scram System Piping; (5) NUREG-0313, Technical Report on Material Selection and Processing Guidelines For BWR Coolant Pressure Boundary Piping which !
pertains to augmented examination of all Code Class 1 piping and components which are considered susceptible to intergranular stress corrosion cracking (IGSCC).
Vormnnt Yankop Rocnnnan A. Vermont Yankee performs a number of augmented examinations in addition to the ASME Section XI required inspections. Vermont Yankee also complies with additional criteria for examinations, such as Regulatory Guide 1.150.
The commitments that are related to the documents referenced above and other commitments when added assurance of structural relbbility is deemed necessary are listed below.
4 (1) Branch Technlent Pncitinn MFB 3-1. Hloh Fnerov Fluid Svatoms.
Protectinn Aaainct Pnctulated Pinina Failures in Fluid Svetame Outcido
~
enntainmani In a letter dated December 19,1974, Docket No. 50-271, a f Safety Evaluation was published by the USAEC titled " Rupture of High Energy Lines Outside of Containment" for Vermont Yankee. This
< Safety Evaluation and Vermont Yankee do not rely on any augmented inservice inspection to exclude high energy pipe breaks outside i containment. Vermont Yankee can withstand the consequences of a j rupture in any high energy fluid piping outside containment without i
1 4
.-, e.., m, , , - - _ . . - , _ , _ . . . . , _ _ . , . _ _ _ . - _ , . - , _ _ _ _ , , - . . . , - - , , - . - - - - . - , . .
..c m
' theloss of the capability to initiate and maintain safe shutdown of the ,
plant. a 6
(2) Roantatnry Culda 1.140 Illtrnannie Teatina nf Rosetnr Vanaal Walda Durina Pronorviep and Tnnervice Fva minatinn - Vermont Yankee i complies with the guidelines set forth in Regulatory Guide 1.150 for examination of RPV welds, as referenced in the Applicable Documents section of the' Vermont Yankee Third Interval Inservice Inspection Program. It is expected that when ASME Section XI, Appendix VIII, is made mandatory (projected for January,1996), this Regulatory Guide !
will be withdrawn. Appendix VIII will supersede those guidelines. If l that is the case, the Regulatory Guide would only be applicable for the first and second outages of the current interval. .
(3) NIIRFG-0619. BWR Foodwater Nn7719 and CRD Return T.ine Nnryle Cracking- The NRC is currently considering a relief to the PT examination that Vermont Yankee submitted February 11,- 1994, and has provided additional information in a letter dated November 8, 1994. Inlieu of PT, a remote underwater ultrasonic examination from the ID of the nozzle will be performed. The CRD return line was capped and is no longer within the scope of NUREG-0610. i (4) N11RFC OR01 Intoarltv nf BWR bram 9vatom Pinina The scram ;
discharge volume is designed as a Safety Class 2 system in accordance with the Vermont Yankee Safety Class Manual (which was derived . ~l from applicable sections of ANS-22, Draft 4, Rev.1, May 1973, and ANS-52.1). Piping is designed to ANSI B31.1. The scram discharge volume system is classified as a Seismic Class I system in accordance ,
with the Vermont Yankee FSAR. This system is examined in accordance with ASME Section XI,IWC-2500, Categories C-F-2 and C-H, and is included in the scope of the Vermont Yankee Third Interval Inservice Inspection Program as part of the CRD system. In addition, !
inspection requirements for SDV supports are also contained in the
" Supports" section of the program under the CRD system. ;
(S) NIIRFC-0313. Technical Rennrt nn Material 41petinn and Prneoccina l Culdolinac Fnr BWR Cnninnt Proccure Enundarv Pinina- Vermont Yankee performs ultrasonic and penetrant exainina'tiohs of piping l 4
welds susceptible to IGSCC in accordance with NUREG-0313. As stated in a letter, FVY 88-62, Vermont Yankee's Response to NRC Generic '
Letter 88-01, dated July 27,1988, with the exception of six items, all of the piping welds within the scope of the generic letter at Vermont Yankee are Category A welds. The pipe replacement in 1985 replaced all of the recirculation piping and all of the stainless steel RHR piping.
Safety Class stainless steel portions of the Reactor Water Cleanup system have been replaced in various outages. Category A welds are 2
l i
t.-- . ,_----. - - _ --
Q W .
, - being examined in accordance with NUREG 0313, Paragraph 5.3.2.1', !
which requires that a sample of 25% of those welds be examined every ,
10 year interval. . All Class 1 Category A welds are enveloped by the ;
ASME Section XI Vermont Yankee Third Interval Inservice Inspection 1 Program,and thus, do not require augmented examination. The only :
remaining Category A items are the Class 3 Reactor Water Cleanup stainless steel welds. A sample of 25% of those welds are examined
~
every 10 year interval under an augmented program. There are no Category B or C weldments at Vermont Yankee. There are six Category i 4 D items at Vermont Yankee. These are the two core spray. safe-ends, ;
which have a non-welded Inconel 600 crevice; the two core spray safe-end to reactor vessel nozzle welds, which are Inconel 600; and the two core spray' safe-end to reducer welds, which are weld overlaid. These ;
are being examined in accordance with NUREG 0313, Paragraph 5.3.2.4, which requires that approximately half of those items be examined l every refueling outage. In actual practice, Vermont Yankee examines i all six of these items every other refueling outage. There are no i Category E weldments at Vermont Yankee. l (6) Augmented praminatinn of Main C;tpam nining frnm the outermnnt enntainment innlatinn valve in the turbine stnn and hvnacc valvan Vermont Yankee performs examinations of the'se pipin} welds and piping supports in accordance with the requirements of ASME Section XI, Table IWC-2500-1, Code Category C-F-2 and Code Case N-491, Table -
2500-1, Code Item No. F1.20. A sample of 7.5% of the circumferential -
welds are examined every 10 year interval and a sample of 15% of the j piping supports are examined every 10 year interval. )
i !
NRC' Additinnal in(nrmatinn Ronuired-B. Code of Federal Regulations, Part 10,50.55a(g)(6)(ii)(A), states that all licensees i must augment their reactor vessel examinations by implementing once, !
during the inservice inspection interval in effect on September 8,1992, the examination requirements for reactor vessel shell welds specified in Item Bl.10 of Examination Category B-A of the 1989 Code. In addition, all previously granted relief forItem Bl.10 of Examination Category B-A, for the ,
intervalin effect on September 8,1992,is revoked by the new regulation. For l licensee's with fewer than 40 months remaining (e.g., Vermont Yankee) in {
the interval on the effective date, deferral of the augmented examination is !
permissible with the conditions stated in the regulations. Discuss the current I schedule for meeting the augmented reactor pressure vessel examinations ,
and the approach for meeting the volumetric examination coverage l requirements.
l 3
Vermnnt Yankmo Roannnae B.- Vermont Yankee plans to perform these examinations in the refueling outage scheduled to begin approximately mid-September,1996, which is designated as the third refueling outage cf the first period of the third interval. The second period of the third interval is actually scheduled to begin September 1,1996. If the third refueling outage begins after that date, Vermont Yankee willinvoke ASME Section XI,IWB-2412(b), which allows a period to be shifted by as much as 1 year to coincide with a refueling outage.
Table 1 on page 4 of the Preface of the Vermont Yankee Third Interval Inservice Inspection Program would be revised to reflect this position. These welds are currently shown on pages 70 and 71 of the Vermont Yankee Third Interval Inservice Inspection Program as being scheduled for the third refueling outage of the first period and will remain as such.
NRC Additinnal in(nrmatinn Ranuirod?
C. Provide the staff with the Boundary Diagrams which define the ASME Code Class 1, Class 2 and Class 3 boundaries for the systems in the Vermont Yankee Nuclear Power Station, Third 10-year Interval ISI Program Plan.
Vermnnt Yankoo Rosnnnce C A full set of 11x17 isometric drawings delineating these boundaries accompanied our December 3,1993 submittal [ Reference (b)]. However, to assist NRC in' review completion, we are presently completing up-to-date
- system drawings (PddDs) for the systems which comprise the scope of the Vermont Yankee Third Interval Inservice Inspection Program. W e anticipate completion of these drawings and submittal to the NRC by January 15,1995.
NRC Additinnal infnrmatinn Ronnirod-D. Regulatory Guide (RG) 1.26 and Standard Review Plan (SRP) 3.2.2 give guidance for quality group classification of components. In these documents, the main steam line from the outermost containment isolation valve to the turbine stop and bypass valves, and connected piping up to and including the first valve that is either normally closed or capable of automatic closure, is to be designated as Quality Group B or ASME Code Class 2. Vermont Yankee Nuclear Power Station has this portion of the main steam piping classified as non-safety related. Please provide technical justification for classifying this piping as non-safety related rather than Cass 2 as specified in RG 1.26 and SRP 3.2.2.
4 ,
. w' . l i
Vormnnt Wnkaa Roannneo
.l D. Regulatory Guide 1.26 v as issued in March 1972. No " Implementation" section was included in this issue. Revision 1, issued September 1974, contained an Implementation section which stated that this standard should l be applied for all plants for which the docket date of the application for a construction permit is subsequent to January 1,1975. Application of the guide 1 to plants for which the docket date of the application was prior to January 1, j 1975, was at the designer's option. Vermont Yankee received its construction ,
permit in 1%7 and an initial operating license in March of 1972. Vermont Yankee's original piping was designed to USAS B31.1-1%7. ,
i Vermont Yankee determined the classification of the main steam piping 1 from the outermost containment isolation valve up to the turbine stop valve j based on the guidelines of N-212 ANS-22, Draft No. 4, Rev.1, dated May,1973. 1 ANS-22 classifies the Power Conversion System, which contains "that portion of the main steam lines which extend from the outermost main- .
steam isolation valves to the turbine including the turbine bypass valves, and ]
branch lines and valves" as "Other Systems." Because of the interface l between the power conversion system and safety systems, ANS-22 applies ;
additional mechanical design or quality requirements. ;
l Since the main steam piping from the outermost containment isolation ;
valve to the turbine stop and bypass valves was constructed to quality _
standards commensurate with current standards and,in addition, is currently :
subject to inservice inspection as described in response A(7) above, the Intent of Regulatory Guide 1.26 is satisfied.
NRC Addittnnnl Informatinn Ronuired*
E. Included in the discussion of " Safety Class 2 Components," the licensee l provided a list of pipe lines <3/8 inch thickness and noted that piping welds j in these lines would be excluded from examination. The licensee stated that !
there are no Examination Category C-F-1 welds 23/8 inch. What is the total i number of Examination Category C-F-1 welds <3/8 inch represented by these l lines? '
Portions of Code Class 2 piping welds in the Residual Heat Removal (RHR),
Emergency Core Cooling (ECC), and Conta8 unent Heat Removal (CHR) systems are critical to the safe shutdown of the plant. It has been recognized that current Code examination requirements' exclude selection of thin wall piping welds (<3/8 inch) in the subject systems. As a result, flaws in thin wall piping welds of piping systems critical to the safe shutdown of the plant would not be detected until through wall leakage occurs. Considering the safety significance of the subject systems, describe your plans for volumetric 5
J
. i examination of a sample of thin-wall piping welds to assure the continued . i integrity.
l Vermnnt %pe Roannnsa E. Thor are a total of 42 Category C-F-1 welds on condensate lines CT1 and CT4, all of which are less than 3/8 inch thick. Vermont Yankee will consent to :
perform an augmented sample examination of four (4) welds out of these 42 !
welds. This sample size would not meet the requirements of Table IWC-2500- ;
I for Category C-F-1 welds, if the welds did indeed fall within the scope of i ASME Section XI(greater than or equal to 3/8 inch thick). Table IWC-2500-1, .!
Category C-F-1, Note (2) requires that 7.5%, but not less than 28 welds be !
examined. A sample of 28 welds would equate to 67% of the Category C-F-1. +
welds, whereas a sample of four (4) wdds out of 42 welds (9.5%) on these two ;
lines is adequate to ensure the health and safety of the public. ;
I There are a total of 836 Category C-F-2 welds that are greater than or equal to l 3/8 inch thick. There e.re an additional 256 Category C-F-2 welds which are less than 3/8 inch thick. Currently 67 Category C-F-2 welds, all greater than or ;
equal to 3/8 inch thick, are scheduled for examination in the third interval. j Vermont Yankee will consent to pcrform an augmented examination of an i additional 19 Category C-F-2 welds which are less than 3/8 inch thick. This l would bring the total number of Category C-F-2 welds being examined to 86 out of a total of 1,092 Category C-F-2 welds. This equates to a sample of 7.9%.
The additional weld sample will be distributed, prorated to the degree practicable, on the number of nonexempt welds per system, per type.of weld (terminal end or structural discontinuity), and per pipe nominal diameter.
The Vermont Yankee Third Interval Inservice Inspection Program will be revised to reflect these selection criteria.
NRC' Additinnn1 Infnrmatinn Ronuirod-F. For Code Class 1 integral attachment welds to piping, pumps, and valves, the Code does not require examinations for the third and fourth interval when implementing Inspection Program B. Examination ofintegral attachments in Code Class 2 and 3 systems is required in the third and fourth interval. The recently approved ASME Code Case N-509 (approved November 25,1992 by ASME), provides for continued inspection of Class 1 integral attachments for the life of the plant as well as readjustments in the sample inspection requirements for Code Class 2 and 3. Describe your plans with respect to implementing this Code Case.
Vormnnt Yankoo Rosnnnse F. Vermont Yankee willimplement Code Case N-509 for integral attachments of vessels, piping, pumps, and valves. The Vermont Yankee Third Interval 6
- , 1 l
1 l
\
InserviceInspection Program will be revised to reflect these selection criteria and examination requirements.
NRC Additinnal in(nematinn Ranuired-G. In the " Preface" to the program plan, under " Additional Examinations. j (Expansions)," the licensee stated that, "If component supports require ;
corrective action in accordance with ASME Code Case N-491-3000, additional ;
examination will be performed in accordance with ASME Code Case N-491- t 2430." l It should be noted that when ISI examinations reveal conditions exceeding acceptance levels for component supports that require corrective action or alternatively are evaluated for acceptance for continued service, the requirements for additional examinations must be met. Additional ;
examinations validate that findings are isolated and also provide assurance of '
system integrity. Verify that the requirements for additional examinations are also applied to findings found acceptable for continued service based on ,
acceptance by evaluation. ;
Vermnnt Yankap Rosnnnsg, G. In the case when conditions noted in the field are found to be acceptable based ,
on evaluation, Vermont Yankee treats this evaluation process of component '
supports as a part of the further definition of the acceptance criteria. The examination of supports encompasses many different types of supports and support applications, which essentially requires evaluation to be made on a case by case basis. This differs from IWB, IWC, and IWD-3500 evaluations where acceptance criteria are well defined. For example, spring supports at Vermont Yankee have not been pre-analyzed to determine an acceptable as-found setting range. A narrow tolerance of 1.5% of the load has been established for initial acceptance. When a recorded setting is found to be outside this i.5% range, the as-found settings are given to engineering for further evaluation. If, through engineering evaluation, it is found that a spring suppo:t setting is acceptable and that no undue stress has been placed on the e,ystem, there is no failure, and therefore, no need for additional examinations. Another example would be the case where a support rod is deformed and is reported as such, but was installed in that manner and originally accepted in that condition. In this case, evaluation would be necessary to accept this condition, but it would not be considered a failure and, therefore no additional examinations would be performed. Again, the noted condition is not indicative of a failure. In support of this philosophy I are Section XIInterpretation XI-1-86-30 and Code Case N-491 which recognize that these types of evaluations are sometimes necessary, but that additional examinations may not be required.
1 7
l
i
~
e
..,4,,
Nhen the results of examinations require corrective measures in accordance with the provisions of N-491-3000, Vermont Yankee will perform additional examinations in accordance with N-491-2430.
NRC' Additinnal Informatinn Renuired-H. Verify that no additional requests for relief are rcquired at this time. If additional relief requests are required, the licensee should submit them for staff review.
Vermont Yankee Resnnnse H. At this time, subsequent to the initial submittal, the need for only one -
additional request for relief has been identified. This relief will address the reactcr pressure vessel bottom head welds required to be examined in accordance with ASME Section XI, Table IWB-2500-1, Category B-A, Code Items Bl.21 and Bl.22. The Vermont Yankee Third Interval Inservice Inspection Program will be revised to add this relief request.
I l
l 8
,