MONTHYEARML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS ML20155B0331998-10-22022 October 1998 Proposed Tech Specs Changing TS 3.3.2.1, Instrumentation - ESFAS Instrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F ML20154A3701998-09-28028 September 1998 Proposed Tech Specs Sections 3.3.2.1,3.4.6.2,3.4.8,3.6.2.1, 3.6.5.1,3.7.6.1 & 3.9.15,revising Info Re Revised MSLB Analyses & Revised Determinations of Radiological Consequences of MSLB & LOCA ML20154C0491998-09-28028 September 1998 Proposed Tech Specs Revising FSAR Separation Requirement of Six Inches Which Is Applied to Redundant Vital Cables, Internal Wiring of Redundant Vital Circuits & Associated Devices ML20151V5011998-09-0909 September 1998 Proposed Tech Spec Changing TS Definitions 1.24,1.27,1.31, 3.0.2,4.0.5,3.2.3,3.3.2.1,3.4.1.1,3.4.11 & Adding TS 3.0.6 B17385, Proposed Tech Specs 6.9.1.8b,updating List of Documents Describing Analytical Methods Specified1998-08-12012 August 1998 Proposed Tech Specs 6.9.1.8b,updating List of Documents Describing Analytical Methods Specified B17341, Proposed Tech Specs Surveillance 4.4.5.3.a Re SG Tube Insp Interval1998-08-0606 August 1998 Proposed Tech Specs Surveillance 4.4.5.3.a Re SG Tube Insp Interval ML20236Y0831998-08-0404 August 1998 Proposed Tech Specs Changing TS 3.7.1.3, Plant Sys - Condensate Storage Tank & Adding TS 3.7.1.7, Plant Sys - Atmospheric Steam Dump Valves ML20236X2521998-07-30030 July 1998 Proposed Tech Specs Bases 3/4.9.1,3/4.1.1.3,3/4.7.1.6, 3/4.7.7,3/4.5.4 & 3/4.3.3.10,resolving Miscellaneous Condition Repts ML20236W0201998-07-30030 July 1998 Proposed Tech Specs Bases Section 3/4.6.1.1,clarifying Administrative Controls for RHR Isolation Valves When RHR Sys Is in Svc for Core Cooling ML20236T2681998-07-21021 July 1998 Proposed Tech Specs Re Reactor Protection & ESFs Trip Setpoints ML20236T5301998-07-17017 July 1998 Proposed Tech Specs Pages for TS Bases Section 3/4.4.9, Pressure/Temperature Limits ML20236T7331998-07-17017 July 1998 Proposed Tech Specs Modifying DG Testing Requirements ML20249A2811998-06-10010 June 1998 Proposed Tech Specs Re Post Accident Access to Vital Areas (Plar 3-98-6) ML20249A3121998-06-0606 June 1998 Proposed Tech Specs Re SLCRS Bypass Leakage (Plar 3-98-5) ML20249A2681998-06-0505 June 1998 Proposed Tech Specs Re Revised Steam Generator Tube Rupture Analysis (Plar 3-98-4) ML20248M2221998-06-0404 June 1998 Revised Tech Specs Pages,Changing TS Bases Section 3/4.7.1.5 to Reword Section Which Describes Limiting Temperature Case for Containment Analysis ML20247G6841998-05-14014 May 1998 Proposed Tech Specs,Modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time Most Reactor Protection or Esfa Channels Can Be in Bypass Position to 48 Hours,From Indefinite Period of Time B17211, Proposed Tech Specs Re Refueling Water Storage Tank Back Leakage1998-05-0707 May 1998 Proposed Tech Specs Re Refueling Water Storage Tank Back Leakage ML20247B9411998-05-0101 May 1998 TS Change Pages for TS Bases Section 3/4.5.4,modifying Wording Associated W/Refueling Water Storage Tank Minimum Boron Concentration ML20217D5941998-04-30030 April 1998 Proposed Tech Specs Re Change to Basis 3/4.6.4 Which Modifies Accuracy Range Associated W/Measured Std Cubic Feet Per Minute & Corrects Listed Component Number ML20217N9441998-04-29029 April 1998 Proposed Tech Specs Replacing Two low-range Pressurizer Pressure transmitters,PT-103 & PT-103-1,which Will Identify That Two low-range Pressurizer Pressure Instrument Channels Are Independent & Redundant Only 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20155B0331998-10-22022 October 1998 Proposed Tech Specs Changing TS 3.3.2.1, Instrumentation - ESFAS Instrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F 1999-09-07
[Table view] |
Text
. . _
_ . _ _ . ~ . .._-. . .-.
9 i
Docket No. 50-336 i
Attachment 1 ,
I Millstone Nuclear Power Station, Unit No. 2 Proposed Revisions to Technical Specifications Pressure-Temperature Limits ;
i i
+
- s t
l l
l l
l' January,198tf i
I._ . . . .
- i. P. PDR p-
.,._. _. . . . - _ . _ . _ , , _ , _ , . _._.___ , .._ _.__..__,_ ,_~.___._.._..__ _..- _.__.__. __. _ . _,.__ _._._ _.
Revise pages: 3/4 4-17 3/4 4-19b 3/4 4-20 B 3/4 4-6 Delete pages: 3/4 4-19c B 3/4 4-7 B 3/4 4-8 B 3/4 4-9 B 3/4 4-10
\
REACTOR COOLANT SYSTEM 3/4.4.9 PRESSURE / TEMPERATURE LIMITS REACTOR COOLANT SYSTEM LIMITING CONDITION FOR OPERATION 3.4.9.1 The Reactor Coolant System (except the pressurizer) temperature and pressure shall be limited in accordance with the limit lines shown on Figure 3.4-2 during heatup, cocidown, criticality, and inservice leak and hydrostatic testing with:
- a. A maximum heatup of 400F in any one hour period with Tavg at or below 2000F,500F in any one hour period with Tavg at or below 3000F and above 2000F, and 1000F in any one hour period with Tavg above 3000F.
- b. A maximum cooldown of 1000F in any one hour period with Tavg above 3000F and a maximum cooldown of 200F in any one hour period with Tavg below 3000F.
- c. A maximum temperature change of SoF in any one hour period, during hydrostatic testing operations above system design pressure.
APPLICABILITY: MODES 1, 2*, 3, 4 and 5.
ACTION:
With any of the above limits exceeded, restore the temperature and/or pressure to within the limit within 30 minutes; perform an engineering evaluation to determine the effects of the out-of-limit condition on the fracture toughness properties of the Reactor Coolant System; determine that the Reactor Coolant System remains acceptable for continued operations or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce the RCS T av and pressure to less than 2000F and 500 psia, respectively, within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- Sae Special Test Exception 3.10.3.
MILLSTONE - UNIT 2 3/4 4-17
3600 -
22N5='E' ==.i! : E--r----:=-- 'ijEM I == d:J"- .._" " '"
( _"_ jE n- -
1===== =
_.4._.
_ :.==x.:
==
3_. - .
=4 -
.2 - -_.
..= ;==.g...
.=* ~-; ;-3.--_ i. .a.
. ~ .-.4 = ::3m:. == g: q ~ t== = n f
. 4 4_.
= 25 rr - ---. :-- - . : n:- - -
3200
-~ ~ "~ ~' _.~ -
~ ~ '-.- ~ - . ~ . ~;
" ~" *_-
" 4=- " ~ - -~~ "- 3~ "===="=
' _ =. -~~ ~~
_f="-
= +
==; = - - - -= g;- .
_ ;. ;;;n 3.;-
- n ; ;. - ___....
. . _ === n=
=.__ gn :;t; t .__& -
n:4z r = SYSTEM i:7DRO 6
- e 3.g y iet ;em:
n= - ==.= -
- ._ . :m: -;- -
= :. gg =-==-
7=" _. . _ _.. - ._ . : nn :m a b;
--- - .4 .* - 4 C00LDWN u . . _-
i g n====
.~. ... .
_..__.._.44.,a.y..,._.#.a4 ...3.__ .
=:: . , . un.- -r - uguut +-,+ - - . - - . ~ .
n=.
- . 4 - -==: - , ..e- :=: :s .
, fu'.".. ... _
.-..e
=2._ .2__.
--_..; -+
- =
== a [ m HEATUP
- , ...= e :. ._...
.:= 1 . . _ ._ -
p -r .:=._.. .
._q
,+
a< ~.. -
_.. ._ .a
== ~~ == . . _~~_ ..a *
= .nE.;=2=-_._
w
- ~ . .
~~ ~~
-"~
2400 ~
~
5 g"s..
= a~ .'-:.=l
__mJ ' ==_ ..~__ -= ==3=
u.
- .=mn m .,
R _ ._. ., .
u --
---. : __ wg-t. =_::_. ,w:
a- =; -, ---
- s.t ...
. ._ .- %,.. e. 3. . == . _ = .= _ = .--
y o.
.=,.=._=_.=. E m+::r; =. .;:=:f .:a=- =2== ;p._ -
3 . . u 4 ._.. . _ .
g p : ..,- ..-. .
7 b; *C~3._.
~
W w
=
a-2000 = : : u- u. := - --
~~-
- l:f*[:.:
- . = . _ = _. = _ =g7
--+
. 1= -
g g ====n:= l3T=3
..= = . _. _--- =__
..=___..
u -___ - -
, ; t _. -. _ ._.
g ---
,== n :=2== :-- pa=:p =. :
.==
= . = _,g
,m m ;. =..t== 2i w - - = :t- :
p
..=- .. .
'+ _:= -L_ _ . . _ = _
~ ~
E* ~ ~*
~ ~ ~
"g 1600 a.. ._..
.g ~.
1: f:-
_~~. .p'7
_ . . ., ._ _=_
S r -
_"- , ! E5
--;;r[.l.5:l
_:= m , '_sneI==
_i
=n= =_n;- n=xt" . . _ .E : s .u . ,. __,
M EE. -nI. -a :_ - . .
.- a. . .. --_..
_- Era m-3 .- = - -
o .
~
5 1200 .;- *# ** ~'
~
.u a.;
JnnF.
".g:~J
. t: ___.__
a"_"~ . . . . .."._" g. ;.. * . _. ". . " . -
7 +: pr= ::1 en:4r m T=: - *- -+
. =.;:
3 n;:Y. ..
- g. .i :---
,, =,2 g g. . -
u- .- _ - - - - . -
- =n*i=:$' * * * * ' -j6., l*O' .:. u -
- . Em t -~--;;--, :.=. -=.
- ;;=2
- =- n::=- I1 . -=: - --
- }:t .:]
- n:-
7 .= 2. =c - u++ m: -
~ .
,aung. gg :=:n ._,._ ,;-+* -- - -
_ 3g=====
3 i, . .#-
-w
= zu a+ .+.+ a n,.
,m,- g.=:==.;==u # . _ . .
... --",=
.+_-
n ._-----;=- r-.2
.n :-- - - -
k::.:=== -
=
y 2 e- ~5. .~ _ . _. + . . _.==
p_ ==_
- =nn. __ ___ . . _ -
- _. .
t:+r at:
?"*+-= -t-
- E..n.1 4;;;.au,.' .
i
=
=
- =
..-.. ==1=_
MAXIMtM PRESSURE =';m:;2. ~
r= = =
I :"2= " ' + ' " -
NR SDC OPERATW :r;-;;;; ::_ :.==
g
- 7. . .,
7 ,- .
0 100 200 300 400 500 600 INDICATED REACTOR COOLANT TEMPERATURE T ' I c
Figure 3.4-2 Reactor Coolant System Pressure Temperature Limitations for 7 Full Power Years MILLSTONE - UNIT 2 3/4 4-19
TABLE 4.4-3 Reactor Vessel Material Irradiation Surveillance Schedule CAPSULE SCHEDULE (EFPY)
W-97 3.0 W-104 10.0 W-284 17.0 W-263 24.0 W-277 32.0
, W-83 Spare
-W-97 (Flux Monitor) 10.0 i
s 4
i MILLSTONE - UNIT 2 3/4 4-20
REACTOR COOLANT SYSTEM B_ASES The heatup and cooldown limit curves (Figtre 3.4-2) are composite curves which were prepared by determining the most conservative case, with eitner the inside or outside wall controlling, f or any heatup or cooldown rates of up to 1000F per hour. The heatup and cooldown curves were prepared based upon the most limiting value of the predicted adjusted reference temperature at the end of the service period indicated on Figure 3.4-2.
The reactor vessel materials have been tested to determine their initia'.
RTNDT; the results of these test are shown in Table 4.6-1 of the Final Saf ety Analysis Report. Reactor operation and resultant iast neutron (E>l Mev) irradiation will cause an increase in the RTNDT. Theref ore, an adjusted reference temperattre, based upon the fluence, can be predicted using the methods described in SECY-82-465 "NRC Staf f Evaluation of Pressurized Thermal Shock", November,1982.
The heatup and cooldown limit curves shown on Figure 3.4-2 include predicted adjustments f or this shif t in RTNDT at the end of the applicable service period, as well as adjustments ior possible errors in the pressure and temperature sensing instr uments.
The actual shif t in RTNDT of the vessel material will be estaolished periodically during operation by removing and evaluating, in accordance with ASTM E185-73, reactor vessel material irradiation surveillance specimens installed near the inside wall of the reactor vessel in the core area. Since the neutron spectra at the irradiation samples and vessel inside radius are essentially identical, the meastred transition shif t for a sample can be applied with confidence to the adjacent section of the reactor vessel. The heatup and cooldown curves mtst be recalculated when the RTNDT determined from the surveillance capsule is dif ferent from the calculated RT NDT for the equivalent capsule radiation exposure.
The r,ressure-temperature limit lines shown on Figure 3.4-2 ior reactor criticality and for inservice leak and hydrostatic testing have been provided to assure compliance with the minimum temperature requirements of Appendix G to 10 CFR 50 for reactor criticality and for inservice leak and hydrostatic testing.
The maximum RT NDT for all reactor coolant sptem pressure-retaining materials, with the exception of the reactor presstre vessel, has been determined to be 500F. The Lowest Service Temperature limit line shown on Figtre 3.4-2 is based upon this RTNDT since Article NB-2332 (Summer Addenda of 1972) of Section ill of the ASME Boiler and Pressure Vessel Code requires the Lowest Service Temperattre to be RTNDT + 1000F MILLSTONE - UNIT 2 B 3/4 4-6
REACTOR COOLANT SYSTD4 .
i, SA5ES -
i for piping, pumps and valves. Below this temperature, the system pressure must be l'atted to a maxiom of 205 of the system's hydrostatic test pressure of 8125 psia.
Included in this evaluation is consideration of flange protection in accordance with 10CFR$0, Appendix G. TherequirementmakesgheminimumtemperatureRTNDT plus 900F for hydrostatic test and RTNDT plus 120 for normal operation when the pressure exceeds 20 percent of the preservice system hydrostatic test pressure.
l The number of reactor vessel irradiation surveillance specimens and the frequencies for removing and testing these specimens are provided in Table 4.4-3 to assure compliance with the requirements of Appendix H to 10 CFR Part 50.
ThelimitationsimposedonthepressurizerIEstupandcooldownrates
- and spray water temperature differential are provided to assure that the pressurizer is operated within the design criteria assumed for the fati-gue analysis perfomed in accordance with the ASME Code requirements.
The OPERABILITY of two PORVs or an RCS vent opening of greab'than 1.3 square inches ensures that the RCS will be prc,tacted from mss,ure
- transients which could exceed the limits of Appendix 5 to 10 CPR Part 50 when one or more of the RCS cold legs era < 275'F. Either PORV has !
adequate relieving capability to protect tKe RCS from overpressurization :
when the transient is limited to either (1) the start of an idle RCP 1 with the secondary water temperature of the steam generator < 43*F (31'F when measured by a surface contact instrument) above tKe coolant tenperature in the reactor vessel or (2) the start of a HPSI pump and its injection into a water solid RCS. .
1 l \
3/4.4.10 STRUCTURAL INTEGRITY l
The inservice inspection and testing programs foe ASME Code Class 1, 2 l
and 3 components ensure that the structural integrity ans operational readiness of these components will be maintained at an acceptable level throughout the life of the plant. These programs are in accordance with Section XI of the -
~
ASME Boiler and Pressure Vessel Code and applicable Adde'nda as required by l 10 CFR Part 50.55a(g) except where specific written relief has been granted by the Commission pursuant to 10 CFR Part 50.55a(g)(6)(1).
e o
MILLSTONE - UNIT 2 B 3/4 4-7
(