Forwards First Periodic Reactor Containment Bldg Integrated Leakage Rate Test,June 1992
ML20102B226
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/20/1992
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20102B227 List:
References
ELV-03868, ELV-3868, NUDOCS 9207280270
Download: ML20102B226 (1)


Text

, _ . - - - -

- Georgia Power Confiany ?

40 inverness Center Pwkwayi^

Post Ottee Box 1295 .. -

Bimunghair Jabama 35201-

~

Tetophorc 20$ 877 7122' C.K.McCoy Vce President;Nodear Georgia Poiver Vogtie Project fte sottWn electrc sys'em July.20, 1992 ELV-03868 001940-Docket No. 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington l, D. C. 20555-Gentlemen:

V0GTLELELECTRIC-GENERATING PLANT

-REACTOR CONTAINMENT BUILDING-INTEGRATED LEAKAGE RATE TEST REPORT-Attached is the first periodic test.-report for the Reactor Containment Building-Integrated Leakage Test,:for,Vogtle Electric; Generating P1_ ant(VEGP)' Unit 2.

The test was completed on April 20, 1992.

- Si nce' rely,-

l C. K. McCoy CKM/HWM/gmb Attachment-

,xc:- Georaia Power Comoany-Mr.iW. B._ Shipman--(w/o)

Mr. H. - Sheibani-- .(w/o)

NORMS (w) q U. So Nuclear-Reaulatory Commission.

Mr.S. D. Ebneter, Regional: Administrator (w) .

-Mr. D. S. Hood, Licensing: Project Manager,;NRR:(w)< -_. _

Mr. B; R.E Bonser,-Senior Resident! Inspector, Vogtle)(w)

~l

_h h.

--9207280270l-920720 -

-PDR: ~l =!

e ADOCK-::.050004,25 go g p n,