ELV-03868, Forwards First Periodic Reactor Containment Bldg Integrated Leakage Rate Test,June 1992

From kanterella
Jump to navigation Jump to search
Forwards First Periodic Reactor Containment Bldg Integrated Leakage Rate Test,June 1992
ML20102B226
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/20/1992
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20102B227 List:
References
ELV-03868, ELV-3868, NUDOCS 9207280270
Download: ML20102B226 (1)


Text

, _ . - - - -

- Georgia Power Confiany ?

40 inverness Center Pwkwayi^

Post Ottee Box 1295 .. -

Bimunghair Jabama 35201-

~

Tetophorc 20$ 877 7122' C.K.McCoy Vce President;Nodear Georgia Poiver Vogtie Project fte sottWn electrc sys'em July.20, 1992 ELV-03868 001940-Docket No. 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington l, D. C. 20555-Gentlemen:

V0GTLELELECTRIC-GENERATING PLANT

-REACTOR CONTAINMENT BUILDING-INTEGRATED LEAKAGE RATE TEST REPORT-Attached is the first periodic test.-report for the Reactor Containment Building-Integrated Leakage Test,:for,Vogtle Electric; Generating P1_ ant(VEGP)' Unit 2.

The test was completed on April 20, 1992.

- Si nce' rely,-

l C. K. McCoy CKM/HWM/gmb Attachment-

,xc:- Georaia Power Comoany-Mr.iW. B._ Shipman--(w/o)

Mr. H. - Sheibani-- .(w/o)

NORMS (w) q U. So Nuclear-Reaulatory Commission.

Mr.S. D. Ebneter, Regional: Administrator (w) .

-Mr. D. S. Hood, Licensing: Project Manager,;NRR:(w)< -_. _

Mr. B; R.E Bonser,-Senior Resident! Inspector, Vogtle)(w)

~l

_h h.

--9207280270l-920720 -

-PDR: ~l =!

e ADOCK-::.050004,25 go g p n,