Summary of 840104 Meeting W/Util in Bethesda,Md Re QA Program.Staff Requested Submittal of More Detailed Responses to QA Program & Incorporation of Most Substantive Changes Into Fsar.List of Attendees Encl
ML20125C695
Person / Time
Site: Beaver Valley
Issue date: 05/24/1985
From: Lazo L
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8506120122
Download: ML20125C695 (5)


Text

!

MAY 2 41S85 Docket No.: 50-412 APPLICANT: Duquesne Light Company FACILITY: Beaver Valley Power Station, Unit 2

SUBJECT:

QUALITY ASSURANCE PROGRAM A meeting was held with Duquesne Light Company (DLC) on Wednesday, January 4, 1984 at NRC Headquarters in Bethesda, Maryland. The NRC was represented by members of the Division of Licensing, NRR, the Division of Quality Assurance, Safeguards and Inspection Programs, IE, and Region I. A list of attendees is included as Enclosure 1.

By letter dated August 31, 1983, the NRC staff requested additional informa-tion from DLC concerning their Quality Assurance (QA) Program as described in FSAR Section 17. Responses were provided in an FSAR Amendment in October 1983.

The purpose of the January 4,1984 meeting was to discuss the NRC evaluation of these initial responses, and gain a better and more detailed understanding of what was otherwise a very brief QA program description. The staff requested that revisions be made to DLC's responses to more clearly describe those aspects of the QA program, and the most substantive changes be incorporated into Section 17 of the FSAR and other appropriate FSAR sections. For instance, the NRC reviewer requested that the DLC position on Regulatory Guide 1.58 concerning personr.el qualifications be modified. The position states that in certain instances qualifications of Level I, II, or III inspectors can be determined through test results and/or demonstration of capabilities. The NRC reviewer requested that the word "or" be renoved from the sentence so as to read, " test results and demonstration of capabilites." The position also states that DLC would accept a 4-year college degree plus one month of related experience or equivalent inspection, examination, or testing activities as qualifications for a Level I inspector. The NRC reviewer commented that one month of experience was not enough.

The applicant plans to submit their revised responses as part of Amendment 6 to their FSAR.

8506120122 850524 2 PDR ADOCK 0500 ll Lisamarie Lazo, Project Manager Licensing Branch No. 3 Division of Licensing

Enclosure:

As stated cc: Seenextpage[

DL:LB# D. B#3 Llazo/e GWKH4hton 5/20/85 5/$/85

( Beaver Valley Mr. John J. Carey Vice President, Nuclear Duquesne Light Company Robinson Plaza Building, No. 2, Suite 110 PA Route 60 Pittsburgh, Pennsylvania 15205 Gerald Charnoff, Esq. Mr. R. E. Martin, Manager Engineering Jay E. Silberg, Esq. Beaver Valley Two Project Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 1800 M Street, N.W. Robinson Plaza Building No. 2, Suite 110 Washington, DC 20036 PA Route 60 Pittsburgh, Pennsylvania 15205 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager Assistant Counsel Quality Assurance Department Governor Energy Council Duquense Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 Mr. John J. Carey Vice President, Nuclear Duquense Light Company Director, Pennsylvania Emergency P. O. Box 4 Management Agency Pittsburgh, Pennsylvania 15205 Room B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17120

.Mr.'T. J. Lex Mr. Thomas Gerusky Westinghouse Electric Corporation Bureau of Radiation Protection Power Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063

-Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. Glenn Walton U. S. NRC John A. Lee, Esq.

'n P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue-King of Prussia, Pennsylvania 15229 o

.Mr. E. F. Kurtz , . Jr. , Manager Regulatory Affairs Beaver Valley Two Project Duquense Light Company Robinson Plaza Buidling No. 2

~ Suite #210 PA Route 60 Pittsburgh, Pennsylvania 15205 a m, h

r I

l l

[

l I

Enclosure 1 BEAVER VALLEY 2 QA MEETING January 4, 1984 ATTENDEES NRC L. Lazo J. Gilray G. Napuda J. Milhoan APPLICANT G. Beatty C. Ewing

.D. Williams R. McCoy D. Batina S. Fenner I

,p '

O

s. '

P, : -

,4 ,

,, MAY 2 41985 MEETING

SUMMARY

DISTRIBUTION

.;WM)}!!SSiilf -

NRC PDR Local POR NSIC PRC System LB3 Reading Attorney, OELD GWKnighton Project Manager llazo JLee NRC' PARTICIPANTS L. Lazo J. Gilray G. Napuda

,. J. Milhoan I.

bec: Applicant & Service List A e a