License Amendment Request to Revise Indian Point Nuclear Generating Unit No. 2 Permanently Defueled Technical Specifications to Modify Staffing Requirements Following Transfer of Spent Fuel to Dry Storage
ML22214A128
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 08/02/2022
From: Fleming J
Holtec Decommissioning International
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HDI-IPEC-22-057
Download: ML22214A128 (84)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 10 CFR 50.90 HDI-IPEC-22-057 August 2, 2022 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Indian Point Nuclear Generating Unit No. 2 Docket Nos. 50-247 Renewed Facility License DPR-26

Subject:

License Amendment Request to Revise Indian Point Nuclear Generating Unit No. 2 Permanently Defueled Technical Specifications to Modify Staffing Requirements following Transfer of Spent Fuel to Dry Storage

Reference:

1. Entergy Letter to NRC, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel, Indian Point Nuclear Generating Unit No. 2, (Letter NL-20-042) (ADAMS Accession No. ML20133J902), dated May 12, 2020 In accordance with Title10 of the Code of Federal Regulations (10 CFR) 50.90, Application for amendment of license, construction permit,or early site permit, Holtec Decommissioning International, LLC (HDI), on behalf of Holtec Indian Point 2, LLC (IP2), requests an amendment to Renewed Facility License No. DPR-26. Following removal of all spent fuel from the IP2 Spent Fuel Pit (SFP) and its transfer to dry storage within an Independent Spent Fuel Storage Installation (ISFSI), the proposed License Amendment would: 1) Modify the IP2 staffing requirements in Appendix A, Permanently Defueled Technical Specifications (PDTS); 2)

Revise the 10 CFR Part 50 Facility License (FL) and Appendix C, Inter - Unit Fuel Transfer Technical Specifications, (Appendix C TS) to prohibit the transfer of Holtec Indian Point 3, LLC (IP3) spent fuel to the IP2 SFP; and 3) Incorporate a prohibition against the storage of spent fuel in the IP2 SFP in the Appendix A, PDTS.

In Reference 1, Entergy certified to the NRC, in accordance with 10 CFR 50.82(a)(1)(i), that power operations ceased at IP2 on April 30, 2020. In addition,Entergy certified in accordance with 10 CFR 50.82(a)(1)(ii), that the fuel was permanently removed from the lP2 reactor vessel and placed in the IP2 SFP on May 12, 2020.

HDI expects that transfer of the spent fuel from the IP2 SFP to dry storage within an ISFSI will be completed in February 2023. HDI is requesting the proposed revisions to the IP2 FL, PDTS, and Appendix C TS to modify the IP2 staffing requirements to be commensurate with the hazards associated with a permanently shutdown and defueled facility that has transferred all spent fuel from its SFP to dry storage within an ISFSI. HDI requests review and approval of the proposed license amendments by February 1, 2023, and a thirty-day implementation period after the effective date of the License Amendment.

The Enclosure to this letter provides a description and evaluation of the proposed changes to the FL, PDTS, and Appendix C TS. The evaluation includes the regulatory evaluation, the no

HDI-IPEC-22-057 Page 2 of 2 significant hazards consideration determination, and the environmental considerations. to the Enclosure contains a markup of the FL, PDTS pages, and Appendix C TS pages. to the Enclosure contains the retyped FL, PDTS pages, and Appendix C TS pages.

As required by 10 CFR 50.91, Notice for public comment; State consultation, paragraph (b) copies of this application, with the enclosure, are being provided to the New York State Department of Public Service.

This letter contains no new regulatory commitments. Should you have any questions or require additional information, please contact Mr. Walter Wittich, IPEC Licensing at 914-254-7212 or myself at 856-797-0900, ext. 3578.

I declare under penalty of perjury that the foregoing is true and correct. Executed on August 2, 2022.

Sincerely, Jean A. Digitally signed by Jean A. Fleming Fleming Date: 2022.08.02 11:00:21 -04'00' Jean A. Fleming Vice President, Licensing, Regulatory Affairs, and PSA Holtec Decommissioning International, LLC

Enclosure:

Description and Evaluation of Proposed Changes - License Amendment Request to Revise Indian Point Nuclear Generating Unit No. 2 Permanently Defueled Technical Specifications to Modify IP2 Staffing Requirements following Transfer of Spent Fuel to Dry Storage Attachment 1: Markup of the FL, PDTS, and Appendix C TS Pages Attachment 2: Retyped FL and PDTS Pages cc: NRC Senior Project Manager, NRC NRR DORL NRC Region l Regional Administrator NRC Senior Regional Inspector, Indian Point Energy Center New York State (NYS) Liaison Officer Designee, NYSERDA NYS Department of Public Service

HDI-IPEC-22-057 Enclosure Description and Evaluation of Proposed Changes License Amendment Request to Revise Indian Point Nuclear Generating Unit No. 2 Permanently Defueled Technical Specifications to Modify IP2 Staffing Requirements following Transfer of Spent Fuel to Dry Storage (12 Pages)

HDI-IPEC-22-057 Enclosure DESCRIPTION AND EVALUATION OF PROPOSED CHANGES 1.0

SUMMARY

DESCRIPTION In accordance with Title10 of the Code of Federal Regulations (10 CFR) 50.90, Application for amendment of license, construction permit,or early site permit, Holtec Decommissioning International, LLC (HDI), on behalf of Holtec Indian Point 2, LLC (IP2), requests an amendment to Renewed Facility License No. DPR-26. Following removal of all spent fuel from the IP2 Spent Fuel Pit (SFP) and its transfer to dry storage within an Independent Spent Fuel Storage Installation (ISFSI), the proposed License Amendment would: 1) Modify the IP2 staffing requirements in Appendix A, Permanently Defueled Technical Specifications (PDTS); 2)

Revise the 10 CFR Part 50 Facility License (FL) and Appendix C, Inter - Unit Fuel Transfer Technical Specifications, (Appendix C TS) to prohibit the transfer of Holtec Indian Point 3, LLC (IP3) spent fuel to the IP2 SFP; and 3) Incorporate a prohibition against the storage of spent fuel in the IP2 SFP in the Appendix A, PDTS.

In Reference 1, Entergy certified to the NRC, in accordance with 10 CFR 50.82(a)(1)(i), that power operations ceased at IP2 on April 30, 2020. In addition,Entergy certified in accordance with 10 CFR 50.82(a)(1)(ii), that the fuel was permanently removed from the lP2 reactor vessel and placed in the IP2 SFP on May 12, 2020.

HDI expects that transfer of the spent fuel from the IP2 SFP to dry storage within an ISFSI will be completed in February 2023. HDI is requesting the proposed revisions to the IP2 FL, PDTS, and Appendix C TS to modify the IP2 staffing requirements to be commensurate with the hazards associated with a permanently shutdown and defueled facility that has transferred all spent fuel from its SFP to dry storage within an ISFSI.

HDI requests review and approval of the proposed license amendments by February 1, 2023, and a thirty-day implementation period after the effective date of the License Amendment.

The existing FL, PDTS, and Appendix C TS contain requirements that provide for appropriate staffing for when spent fuel is stored in the IP2 SFP. As such, the existing FL, PDTS, and Appendix C TS provide a level of control in excess of that needed for safe storage and management of spent fuel stored within an ISFSI. The proposed FL, PDTS, and Appendix C TS revisions reflect the staffing requirements following the removal of all spent fuel from the IP2 SFP and will become applicable only after the last spent fuel assembly has been removed from the IP2 SFP and stored in an ISFSI.

HDI will be submitting another License Amendment Request (LAR) to fully convert the PDTS to an ISFSI-only configuration at a later date.

Pending Licensing Actions under NRC Review There are no pending LARs that impact this LAR.

HDI-IPEC-22-057 Enclosure Page 2 of 12

2.0 PROPOSED CHANGE

S The proposed License Amendment would modify the FL, PDTS, and Appendix C TS to modify the IP2 staffing requirements to be commensurate with the hazards associated with a permanently shutdown and defueled facility that has transferred all spent fuel from its SFP to dry storage within an ISFSI. The PDTS revision includes a new SFP design requirement which prevents storage of spent fuel in the IP2 SFP. The FL and Appendix C TS are revised to eliminate the provisions for transferring spent fuel from IP3 to the IP2 SFP.

3.0 TECHNICAL EVALUATION

General Analysis Applicable to the Proposed Changes The proposed License Amendment would modify the PDTS by modifying IP2 staffing requirements that are no longer commensurate with the hazards existing at a facility where no spent fuel is stored in the IP2 SFP, and all spent fuel is stored in approved dry casks within an ISFSI. In addition, the proposed License Amendment adds a prohibition on storing spent fuel in the IP2 SFP and modifies the FL and Appendix C TS to eliminate the allowance to transfer IP3 spent fuel to the IP2 SFP. This proposed License Amendment will be implemented after NRC approval and within 30 days following HDI's notification to the NRC that all spent fuel assemblies have been transferred out of the IP2 SFP and placed in dry storage within an ISFSI.

HDI uses a decommissioning method in which most fluid systems are drained and the plant is left in a stable condition until final dismantlement. Administrative controls that are required to be in place when decontamination or dismantling activities of radioactive systems, structures, and components are being performed, are designed to minimize the likelihood of an off-normal or accident event, and thereby the consequences of such an event. The proposed changes to the existing FL, PDTS, and Appendix C TS do not have an adverse impact on these remaining decommissioning activities or any of their postulated radiological consequences.

Spent fuel will be stored in dry casks within an ISFSI, until it is shipped off site consistent with the schedules described in the Post Shutdown Decommissioning Activities Report (Reference

3) and the irradiated Fuel Loading Plan (Reference 4).

During decommissioning with all spent fuel in dry storage within an ISFSI, there are no installed plant systems relied upon for the safe storage of spent fuel. In this condition, there are no credible accidents at IP2 whose prevention or mitigation would need to be addressed by the PDTS. In addition, the NRC approved spent fuel storage casks and canisters used for spent fuel storage are subject to their own Certificate of Compliance and Cask Technical Specifications (CTS).

Section 6 of the IP2 Defueled Safety Analysis Report (DSAR) (Reference 5) describes the design basis accidents (DBAs) related to the IP2 SFP. Postulated accidents were predicated on spent fuel being stored in the IP2 SFP. With the removal of the spent fuel from the IP2 SFP, there are no remaining spent fuel assemblies to be monitored in the IP2 SFP and there are no credible accidents at IP2 that require the actions of a Certified Fuel Handler, Shift Manager, or a Non-certified Operator to prevent occurrence or mitigate the consequences of an accident.

Once all the IP2 spent fuel is in dry storage within an ISFSI, the IP3 Shift Manager will be responsible for the Indian Point Energy Center (IPEC) site on a continuous 24-hour-per-day basis. The IP3 Shift Manager will be the senior management position at IPEC during off-hours

HDI-IPEC-22-057 Enclosure Page 3 of 12 and will be responsible for monitoring facility conditions and managing the activities at IPEC. If an abnormal condition or event occurs, the IP3 Shift Manager shall assess the condition; make an emergency declaration, if appropriate; and assume the position of Emergency Director in accordance with the IPEC Permanently Defueled Emergency Plan, with the overall responsibility to direct and control the emergency response.

Detailed Discussion A discussion of each section in the FL, PDTS, and Appendix C TS that are proposed to be changed, the proposed changes, and the basis for each change are provided below. Changes to the existing FL, PDTS, and Appendix C TS are identified in the markups shown in Attachment 1 to this Enclosure. Retyped pages showing the revised FL and PDTS are provided in to this Enclosure. No retyped pages are provided for the Appendix C TS, because they are eliminated in their entirety.

A change to the PDTS Table of Contents is proposed to reflect the removal of a section that will be eliminated in this LAR. This proposed change is administrative, and no further justification is required.

Proposed Changes to the Facility License License Condition 2.C.(2)

This License Condition provides a generic discussion of the Technical Specifications in Appen-dices A, B, and C. It is modified to eliminate the reference to the Appendix C TS and to update the reference License Amendment number. Following the transfer of all of the spent fuel from the IP2 SFP to dry storage within an ISFSI, inter-unit transfer of spent fuel from IP3 to IP2 will no longer be permitted. Thus, License Condition 2.P and the Appendix C TS are no longer nec-essary, and their elimination is acceptable.

License Condition 2.P This License Condition permits the transfer of IP3 spent fuel to the IP2 SFP subject to the conditions listed in the Appendix C TS. Additionally, the License Condition permits the transfer of IP3 spent fuel into approved dry storage casks for onsite storage.

Following the transfer of all the spent fuel from the IP2 SFP to dry storage within an ISFSI, inter-unit transfer of spent fuel from IP3 to IP2 will no longer be permitted. In addition, the capability for IP3 to store spent fuel in onsite dry storage is permitted by the general license conditions defined in 10 CFR 72. Thus, License Condition 2.P and the Appendix C TS are no longer necessary, and their elimination is acceptable.

Attachments The list of attachments in the FL is modified by eliminating the reference to the Appendix C TS.

Following the transfer of all the spent fuel from the IP2 SFP to dry storage within an ISFSI, inter-unit transfer of spent fuel from IP3 to IP2 will no longer be permitted. Thus, the Appendix C TS are no longer necessary, and its elimination is acceptable.

HDI-IPEC-22-057 Enclosure Page 4 of 12 Proposed Changes to Appendix A - Permanently Defueled Technical Specifications PDTS Section 1 .1, Definitions The terms Certified Fuel Handler and Non-certified Operator are proposed to be eliminated. The proposed changes to other PDTS sections as reflected in this submittal, either eliminate or relocate the information that references these terms. These terms will no longer be needed after all the spent fuel has been transferred from the IP2 SFP to dry storage within an ISFSI. Thus, it is acceptable to delete these definitions from the PDTS.

PDTS Section 4.3, Fuel Storage PDTS 4.3 and its subsections describe design features associated with spent fuel storage in the SFP.

Limiting Condition for Operation (LCO) 3.7.11 provides a limit regarding the SFP water level. It is only applicable during movement of irradiated fuel assemblies in the SFP.

LCO 3.7.12 provides a limit regarding the SFP boron concentration. It is only applicable when fuel assemblies are stored in the SFP.

LCO 3.7.13 provides limits regarding the storage of fuel assemblies in the SFP. It is only applicable whenever any fuel assembly is stored in the SFP.

HDI proposes to modify PDTS 4.3 to eliminate the existing SFP protection requirements and to replace them with a new prohibition against the storage of spent fuel in the IP2 SFP. The new prohibition will state: Spent fuel shall not be stored in the Spent Fuel Pit. This new prohibition will permanently preclude storage of fuel in the SFP after the spent fuel is removed during the final off-load campaign. This is acceptable, because the requirements of PDTS 4.3, LCO 3.7.11, LCO 3.7.12, and LCO 3.7.13 are no longer applicable following the permanent removal of all spent fuel from the IP2 SFP.

PDTS Section 5.1, Responsibility PDTS 5.1.2 requires the Shift Manager to be responsible for the shift command function. This requirement is proposed to be eliminated.

As described in the existing PDTS 5.1.2, the IP2 shift command function is focused on operations involving the storage or movement of spent nuclear fuel within the IP2 SFP. After all spent fuel is permanently removed from the IP2 SFP, the need for the IP2 Shift Manager and the shift command function for spent fuel management no longer exists. The position of Shift Manager described in PDTS 5.1.2 is a holdover from the control room function of supervising multiple functions of an operating nuclear power plant.

With the removal of the spent fuel from the IP2 SFP, there are no remaining spent fuel assemblies to be monitored in the IP2 SFP and there are no credible accidents at IP2 that require the actions of a Certified Fuel Handler, Shift Manager, or a Non-certified Operator to prevent occurrence or mitigate the consequences of an accident. With the limited requirements for supervision of the passive dry fuel storage system utilized within the ISFSI or with respect to

HDI-IPEC-22-057 Enclosure Page 5 of 12 the decommissioning of the former IP2 power generation facility, the IP2 Shift Manager position and shift command function are no longer required; therefore, the proposed deletion of PDTS 5.1.2 is acceptable.

The IP3 Shift Manager will be responsible for the IPEC site on a continuous 24-hour-per-day basis. The IP3 Shift Manager will be the senior management position at IPEC during off-hours and will be responsible for monitoring facility conditions and managing the activities at IPEC. If an abnormal condition or event occurs, the IP3 Shift Manager shall assess the condition; make an emergency declaration, if appropriate; and assume the position of Emergency Director in accordance with the IPEC Permanently Defueled Emergency Plan, with the overall responsibility to direct and control the emergency response.

PDTS Section 5.2.1, Onsite and Offsite Organizations PDTS 5.2.1.d requires that the individuals who train the Certified Fuel Handlers and the individuals that carry out health physics or perform quality assurance functions have organization freedom from the onsite manager to ensure their ability to perform their assigned functions. The requirement is proposed to be modified as follows:

The individuals who train the CERTIFIED FUEL HANDLERS, individuals that carry out health physics, or perform quality assurance functions may report to the appropriate onsite manager; however, these individuals shall have sufficient organizational freedom to ensure their ability to perform their assigned functions.

With the removal of the spent fuel from the IP2 SFP, there are no remaining spent fuel assemblies to be monitored in the IP2 SFP and there are no credible accidents at IP2 that require the actions of a Certified Fuel Handler, Shift Manager, or a Non-certified Operator to prevent occurrence or mitigate the consequences of an accident. After all spent fuel is transferred from the IP2 SFP to dry storage within an ISFSI, storage of spent fuel in the IP2 SFP is prohibited, and inter-unit spent fuel transfer from IP3 to the IP2 SFP is no longer permitted, there will no longer be an organizational need for Certified Fuel Handlers or the associated training program. Therefore, this change will have no impact on continued safe storage and maintenance of spent fuel stored in the ISFSI.

PDTS 5.2.2, Facility Staff PDTS 5.2.2 is proposed to be deleted in its entirety. These administrative controls pertain to the facility staff organization and requirements when spent fuel is stored or moved within the IP2 SFP. With the removal of the spent fuel from the IP2 SFP, there are no remaining spent fuel assemblies to be monitored in the IP2 SFP and there are no credible accidents at IP2 that require the actions of a Certified Fuel Handler, Shift Manager, or a Non-certified Operator to prevent occurrence or mitigate the consequences of an accident. After all spent fuel is transferred from the IP2 SFP to dry storage within an ISFSI, storage of spent fuel in the IP2 SFP is prohibited, and inter-unit spent fuel transfer from IP3 to the IP2 SFP is no longer permitted, it is unnecessary to retain these spent fuel handling administrative controls. Therefore, the deletion of PDTS 5.2.2 after the fuel has been moved from the IP2 SFP to the ISFSI will have no impact on safe storage and maintenance of spent fuel in the ISFSI and is acceptable.

HDI-IPEC-22-057 Enclosure Page 6 of 12 The IP3 Shift Manager will be responsible for the IPEC site on a continuous 24-hour-per-day basis. The IP3 Shift Manager will be the senior management position at IPEC during off-hours and will be responsible for monitoring facility conditions and managing the activities at IPEC. If an abnormal condition or event occurs, the IP3 Shift Manager shall assess the condition; make an emergency declaration, if appropriate; and assume the position of Emergency Director in accordance with the IPEC Permanently Defueled Emergency Plan, with the overall responsibility to direct and control the emergency response.

PDTS 5.3, Facility Staff Qualifications PDTS 5.3.2 requires that an NRC approved training and retraining program for Certified Fuel Handlers to be maintained. As described in the existing PDTS 5.3.2, the IP2 shift command function is focused on operations involving the storage or movement of spent nuclear fuel within the IP2 SFP. With the removal of the spent fuel from the IP2 SFP, there are no remaining spent fuel assemblies to be monitored in the IP2 SFP and there are no credible accidents at IP2 that require the actions of a Certified Fuel Handler, Shift Manager, or a Non-certified Operator to prevent occurrence or mitigate the consequences of an accident. Following the transfer of all spent fuel from the IP2 SFP to dry storage within an ISFSI, storage of spent fuel in the IP2 SFP and transfers of spent fuel from IP3 to the IP2 SFP will be prohibited upon implementation of this License Amendment, thus there will no longer be a need for Certified Fuel Handlers or the associated training programs. Therefore, this proposed deletion will have no impact on safe storage and maintenance of spent fuel in the ISFSI and is acceptable.

The IP3 Shift Manager will be responsible for the IPEC site on a continuous 24-hour-per-day basis. The IP3 Shift Manager will be the senior management position at IPEC during off-hours and will be responsible for monitoring facility conditions and managing the activities at IPEC. If an abnormal condition or event occurs, make an emergency declaration, if appropriate; and assume the position of Emergency Director in accordance with the IPEC Permanently Defueled Emergency Plan, with the overall responsibility to direct and control the emergency response.

PDTS 5.7.2, High Radiation Areas with Dose Rates Greater than 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation, but less than 500 rads/hour at 1 Meter from the Radiation Source or from any Surface Penetrated by the Radiation PDTS 5.7.2.a.1 requires that the door and gate keys for high radiation areas be maintained under the control of the IP2 Shift Supervisor or the RP Manager. This PDTS is proposed to be revised by replacing the reference to the IP2 Shift Supervisor with a reference to the IP3 Shift Manager. This is an administrative change to reflect that there will no longer be a shift supervisor specifically for IP2 following the transfer of all spent fuel from the IP2 SFP to dry storage within an ISFSI.

Proposed Changes to Appendix C - Inter - Unit Fuel Transfer Technical Specifications The Appendix C TS defined requirements that permitted the transfer of spent fuel from IP3 to the IP2 SFP. The Appendix C TS are proposed to be deleted in their entirety.

Following the transfer of all the spent fuel from the IP2 SFP to dry storage within an ISFSI, inter-unit transfer of spent fuel from IP3 to IP2 will no longer be permitted. Thus, the Appendix C TS will be unnecessary, and their elimination is acceptable.

HDI-IPEC-22-057 Enclosure Page 7 of 12

4.0 REGULATORY EVALUATION

4.1 Applicable Regulatory Requirements/Criteria 10 CFR 50.36. Technical Specifications In 10 CFR 50.36, the Commission established its regulatory requirements related to the content of TS. In doing so, the Commission placed emphasis on those matters related to the prevention of accidents and mitigation of accident consequences; the Commission noted that applicants were expected to incorporate into their TS those items that are directly related to maintaining the integrity of the physical barriers designed to contain radioactivity. Pursuant to 10 CFR 50.36, TS are required to include items in the following five categories: (1) safety limits, limiting safety system settings, and limiting control settings; (2) LCOs; (3) surveillance requirements (SRs); (4) design features; and (5) administrative controls. However, the rule does not specify the particular requirements to be included in a plant's TS.

Addressing administrative controls, 10 CFR 50.36(c)(5) states that they " ... are the provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner." The particular administrative controls to be included in the TS, therefore, are the provisions that the Commission deems essential for the safe operation of the facility that are not already covered by other regulations.

10 CFR 50.36(c)(6), Decommissioning, applies only to nuclear power reactor facilities that have submitted the certifications required by 10 CFR 50.82(a)(1). For such facilities, TS involving safety limits, limiting safety system settings, and limiting control system settings; limiting conditions for operation; surveillance requirements; design features; and administrative controls will be developed on a case-by-case basis.

Section 6 of the IP2 DSAR describes the DBAs related to the IP2 SFP. Postulated accidents were predicated on spent fuel being stored in the IP2 SFP. With the removal of the spent fuel from the IP2 SFP, there are no remaining spent fuel assemblies to be monitored in the IP2 SFP and there are no credible accidents at IP2 that require the actions of a Certified Fuel Handler, Shift Manager, or a Non-certified Operator to prevent occurrence or mitigate the consequences of an accident.

The IP3 Shift Manager will be responsible for the IPEC site on a continuous 24-hour-per-day basis. The IP3 Shift Manager will be the senior management position at IPEC during off-hours and will be responsible for monitoring facility conditions and managing the activities at IPEC. If an abnormal condition or event occurs, the IP3 Shift Manager shall assess the condition; make an emergency declaration, if appropriate; and assume the position of Emergency Director in accordance with the IPEC Permanently Defueled Emergency Plan, with the overall responsibility to direct and control the emergency response.

10 CFR 50.51. Continuation of License 10 CFR 50.51 (b) states: Each license for a facility that has permanently ceased operations, continues in effect beyond the expiration date to authorize ownership and possession of the production or utilization facility, until the Commission notifies the licensee in writing that the license is terminated. During such period of continued effectiveness, the licensee shall:

HDI-IPEC-22-057 Enclosure Page 8 of 12 (1) Take actions necessary to decommission and decontaminate the facility and continue to maintain the facility, including, where applicable, the storage, control and maintenance of the spent fuel, in a safe condition, and (2) Conduct activities in accordance with all other restrictions applicable to the facility in accordance with the NRC regulations and the provisions of the specific 10 CFR part 50 license for the facility.

10 CFR 50.82. Termination of License 10 CFR 50.82(a)(2) states: Upon docketing of the certifications for permanent cessation of operations and permanent removal of fuel from the reactor vessel, or when a final legally effective order to permanently cease operations has come into effect, the 10 CFR part 50 license no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel.

5.0 No Significant Hazards Consideration Determination In Reference 1, Entergy certified to the NRC, in accordance with 10 CFR 50.82(a)(1)(i), that power operations ceased at IP2 on April 30, 2020. In addition, Entergy certified in accordance with 10 CFR 50.82(a)(1)(ii), that the fuel was permanently removed from the lP2 reactor vessel and placed in the IP2 Spent Fuel Pit (SFP) on May 12, 2020.

HDI expects that the transfer of the spent fuel from the IP2 SFP to the Independent Spent Fuel Storage Installation (ISFSI) will be completed in February 2023. A revision to the IP2 Facility License (FL), Appendix A Permanently Defueled Technical Specifications (PDTS), and Appendix C Inter - Unit Fuel Transfer Technical Specifications, (Appendix C TS) is proposed to modify the IP2 staffing requirements to be commensurate with the hazards associated with a permanently shutdown and defueled facility that has transferred all spent fuel from its SFP to dry storage within an ISFSI. With the removal of the spent fuel from the IP2 SFP, there are no remaining spent fuel assemblies to be monitored in the IP2 SFP and there are no credible accidents at IP2 that require the actions of a Certified Fuel Handler, Shift Manager, or a Noncer-tified Operator to prevent occurrence or mitigate the consequences of an accident.

The IP3 Shift Manager will be responsible for the Indian Point Energy Center (IPEC) site on a continuous 24-hour-per-day basis. The IP3 Shift Manager will be the senior management position at IPEC during off-hours and will be responsible for monitoring facility conditions and managing the activities at IPEC. If an abnormal condition or event occurs, the IP3 Shift Manager shall assess the condition; make an emergency declaration, if appropriate; and assume the position of Emergency Director in accordance with the IPEC Permanently Defueled Emergency Plan (Reference 2), with the overall responsibility to direct and control the emergency response.

In accordance with 10 CFR 50.92, HDI has reviewed the proposed changes and concludes that the changes do not involve a significant hazards consideration because the proposed changes satisfy the criteria in 10 CFR 50.92(c). These criteria require that operation of the facility in accordance with the proposed License Amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated; (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety.

HDI-IPEC-22-057 Enclosure Page 9 of 12 The discussion below addresses each of these criteria and demonstrates that the proposed License Amendment for IP2 does not constitute a significant hazard.

1. Does the proposed License Amendment involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

Section 6 of the IP2 Defueled Safety Analysis Report (DSAR) described the design basis accidents (DBAs) related to the IP2 SFP. These postulated accidents are predicated on spent fuel being stored in the IP2 SFP. With the removal of the spent fuel from the IP2 SFP, there are no remaining spent fuel assemblies to be monitored in the IP2 SFP and there are no credible accidents at IP2 that require the actions of a Certified Fuel Handler, Shift Manager, or a Non-certified Operator to prevent occurrence or mitigate the consequences of an accident.

The proposed changes modify the IP2 staffing commensurate with the hazards associated with a permanently shutdown and defueled facility that has transferred all spent fuel from its SFP to dry storage within an ISFSI. After the removal of the spent fuel from the IP2 SFP and transfer to the ISFSI, no spent fuel assemblies will remain in the IP2 SFP. Coupled with a prohibition against storage of fuel in the IP2 SFP and the elimination of the allowance to transfer IP3 spent fuel to the IP2 SFP, the potential for fuel related accidents is removed.

The proposed changes do not have an adverse impact on the remaining decommissioning activities or any of their postulated consequences. The proposed changes related to the relocation of certain administrative requirements do not affect operating procedures or administrative controls that have the function of preventing or mitigating any accidents applicable to the safe management of spent fuel or decommissioning of the facility.

Therefore, the proposed License Amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed License Amendment create the possibility of a new or different kind of accidentfrom any accident previously evaluated?

Response: No.

With the removal of the spent fuel from the IP2 SFP, there are no remaining spent fuel assemblies to be monitored in the IP2 SFP and there are no credible accidents at IP2 that require the actions of a Certified Fuel Handler, Shift Manager, or a Non-certified Operator to prevent occurrence or mitigate the consequences of an accident.

The proposed changes modify the IP2 staffing commensurate with the hazards associated with a permanently shutdown and defueled facility that has transferred all spent fuel from its SFP to dry storage within an ISFSI. After the removal of the spent fuel from the IP2 SFP and transfer to the ISFSI, no spent fuel assemblies will remain in the IP2 SFP. Coupled with a prohibition against storage of fuel in the IP2 SFP and the elimination of the allowance to transfer IP3 spent fuel to the IP2 SFP, the potential for fuel related accidents is removed.

HDI-IPEC-22-057 Enclosure Page 10 of 12 The proposed changes do not involve installation of new equipment or modification of existing equipment that could create the possibility of a new or different kind of accident.

Hence, the proposed changes do not result in a change to the way the facility or equipment is operated in a manner which could cause a new or different kind of accident initiator to be created.

Therefore, the proposed License Amendment does not create the possibility of a new or different kind of accident from any previously evaluated.

3. Does the proposed License Amendment involve a significant reduction in a margin of safety?

Response: No.

The proposed changes modify the IP2 staffing commensurate with the hazards associated with a permanently shutdown and defueled facility.

The proposed changes modify the IP2 staffing commensurate with the hazards associated with a permanently shutdown and defueled facility that has transferred all spent fuel from its SFP to dry storage within an ISFSI. After the removal of the spent fuel from the IP2 SFP and transfer to the ISFSI, no spent fuel assemblies will remain in the IP2 SFP. Coupled with a prohibition against storage of fuel in the IP2 SFP and the elimination of the allowance to transfer IP3 spent fuel to the IP2 SFP, the potential for fuel related accidents is removed.

The design basis and accident assumptions within the IP2 DSAR, PDTS, and Appendix C TS relating to safe management and safety of spent fuel in the IP2 SFP are no longer applicable. The proposed changes do not affect remaining plant operations, systems, or components supporting decommissioning activities.

Therefore, the proposed License Amendment does not involve a significant reduction in a margin of safety.

Based on the above, HDI concludes that the proposed changes to the IP2 PDTS present no significant hazards consideration under the standards set forth in 10 CFR 50.92(c) and, accordingly, a finding of no significant hazards consideration is justified.

5.1 Precedent This proposed License Amendment is consistent, in part, with recently approved License Amendments issued for Kewaunee Power Station on June 7, 2017 (Reference 6), Vermont Yankee Power Station on August 15, 2018 (Reference 7), Crystal River Nuclear Plant on June 27, 2017 (Reference 8), and Fort Calhoun Station on December 11, 2019 (Reference 9). These License Amendments addressed the ISFSI only configuration in toto, while this LAR only deals with modifications to the IP2 staffing requirements commensurate with the hazards in a permanently shutdown and defueled facility that transferred all of the spent fuel from the IP2 SFP to dry storage within an ISFSI and establishes prohibitions from storing spent fuel in the IP2 SFP and transferring spent fuel from IP3 to the IP2 SFP.

HDI-IPEC-22-057 Enclosure Page 11 of 12 5.2 Conclusion Based on the analyses and considerations described above: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

6.0 ENVIRONMENTAL CONSIDERATION

S This LAR meets the eligibility criteria for categorical exclusion from environmental review set forth in 10 CFR 51.22(c)(9) as follows:

(i) The License Amendment involves no significant hazard consideration.

As described in Section 5.2 of this evaluation, the proposed License Amendment involves nosignificant hazards consideration.

(ii) There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite.

The proposed License Amendment does not involve any physical alterations to the configuration that could lead to a change in the type or amount of effluent release offsite.

(iii) There is no significant increase in individual or cumulative occupational radiation exposure.

The proposed License Amendment does not involve a significant increase in individual or cumulativeoccupational radiation exposure.

Based on the above, HDI concludes that the proposed License Amendment meets the eligibility criteria for categorical exclusion as set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this License Amendment.

7.0 REFERENCES

1. Letter, Entergy to NRC, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel, Indian Point Nuclear Generating Unit No. 2, (Letter NL-20-042) (ADAMS Accession No. ML20133J902), dated May 12, 2020
2. Holtec Decommissioning International, LLC (HDI) letter to U.S. NRC, Revision to Holtec Decommissioning International, LLC (HDI) License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition, (Letter HDI-IPEC-22-018) (ADAMS Accession No. ML22035A121) dated February 4, 2022
3. Indian Point Energy Center, Indian Point Units 1, 2 and 3, Post Shutdown Decommissioning Activities Report, Revision 0, December 2019 as amended by HDI

HDI-IPEC-22-057 Enclosure Page 12 of 12 Letter to U.S. NRC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec Decommissioning International, LLC, (Letter HDI-IPEC-22-029) (ADAMS Accession No. ML22084A059) dated March 25, 2022

4. HI-2210651, Revision 6, Fuel Loading Plan for Indian Point Unit 2 and Unit 3, dated July 8, 2022
5. IP2 Defueled Safety Analysis Report, Revision 0, 2020
6. Letter, USNRC to Dominion Energy Kewaunee, Inc., Kewaunee Power Station Issuance of Amendment for Proposed Changes to License and Technical Specifications to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pool (CAC No. L53079),

dated June 7, 2017(ML17123A031)

7. Letter, USNRC to Entergy Nuclear Operations, Inc, Vermont Yankee Nuclear Power Station - Issuance of Amendment to Change the Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool (EPID NO. L-2017-LLA-0125), dated August 15, 2018, (ML8156A179)
8. Letter, USNRC to Crystal River Nuclear Plant, Crystal River Unit 3 Nuclear Generating Plant - Issuance of Amendment 255 for the License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pools (TAC No. L53146), dated June 27, 2017 (ML17027A160)
9. Letter, USNRC to Omaha Public Power District, Fort Calhoun Station, Unit No. 1-Issuance of Amendment to Revise the Permanently Defueled Technical Specifications to Align the Requirements for Permanent Removal of Spent Fuel from the Spent Fuel Pool (EPID NO. L-2018- LLA-0274), dated December 11, 2019 (ML19297D677)

HDI-IPEC-22-057 Enclosure - Attachment 1 Markup of the FL, PDTS, and Appendix C TS Pages (53 Pages)

(3) HDI pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess and use, at any time any byproduct, source and special nuclear material as sealed neutron sources that were used for reactor startup, sealed sources that were used for reactor instrumentation and are used in the calibration of radiation monitoring equipment, and that were used as fission detectors in amounts as required; (4) HDI pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) HDI pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials that were produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Deleted per Amendment No. 294.

(2) Technical Specifications and The Technical Specifications contained in Appendices A, B, and C, as revised through Amendment No. 295, are hereby incorporated in the renewed license. HDI shall maintain the facility in accordance with the Technical Specifications.

(3) Deleted per Amendment No. 294.

Amendment No. 295

Deleted per Amendment No. XXX (c) Actions to minimize release to include consideration of:

1. Water spray scrubbing
2. Dose to onsite responders O. Deleted per Amendment No. 294.

P. HDI may transfer IP3 spent fuel to the IP2 spent fuel pit subject to the conditions listed in Appendix C. HDI is further authorized to transfer IP3 spent fuel into NRC approved storage casks for onsite storage by HDI and Holtec Indian Point 3, LLC.

Q. License Renewal License Conditions (1) The information in the UFSAR supplement, submitted pursuant to 10 CFR 54.21(d) and as revised during the license renewal application review process, and licensee commitments as listed in Appendix A of the Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Units 2 and 3, (SER) and supplements to the SER, are collectively the License Renewal UFSAR Supplement. The UFSAR Supplement is henceforth part of the UFSAR, which will be updated in accordance with 10 CFR 50.71(e). As such, the licensee may make changes to the programs, activities, and commitments described in the UFSAR Supplement, provided the licensee evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59, Changes, Tests, and Experiments, and otherwise complies with the requirements in that section.

(2) The License Renewal UFSAR Supplement, as defined in license condition Q(1) above, describes certain programs to be implemented and activities to be completed prior to the period of extended operation (PEO).

a. The licensee shall implement those new programs and enhancements to existing programs no later than the date specified in the License Renewal UFSAR Supplement.
b. The licensee shall complete those activities no later than the date specified in the License Renewal UFSAR Supplement.
c. The licensee shall notify the NRC in writing within 30 days after having accomplished item (2)a above and include the status of those activities that have been or remain to be completed in item (2)b above.
3. Deleted (a) Deleted (b) Provisional Trust:

(i) The provisional trust agreement must be in a form acceptable to the NRC.

(ii) Investments in the securities or other obligations of Holtec International or its affiliates, subsidiaries, successors, or assigns are and shall be prohibited.

Except for investments tied to market indexes or other non-nuclear-sector mutual funds, investments in any entity owning one or more nuclear power plants are and shall be prohibited.

Amendment No. 295

(iii) The provisional trust agreement must provide that no disbursements or payments from the trust, other than for ordinary administrative expenses, shall be made by the trustee unless the trustee has first given the Director of the Office of Nuclear Reactor Regulation 30 days prior written notice of payment. The provisional trust agreement shall further contain a provision that no disbursements or payments from the trust shall be made if the trustee receives prior written notice of objection from the NRC.

(iv) The provisional trust agreement must provide that the agreement cannot be amended in any material respect, or terminated, without 30 days prior written notification to the Director of the Office of Nuclear Reactor Regulation.

(v) The appropriate section of the provisional trust agreement shall state that the trustee, investment advisor, or anyone else directing the investments made in the trust shall adhere to a "prudent investor" standard, as specified in 18 CFR 35.32(a)(3) of the Federal Energy Regulatory Commission's regulations.

(vi) Use of assets in the provisional trust, in the first instance, shall be limited to the expenses related to decommissioning IP2 or IP1 as defined by the NRC in its regulations and issuances, and as provided in this license and any amendments thereto.

(c) Deleted

4. Deleted
5. Deleted
6. This renewed license is effective as of the date of issuance, and until the Commission notifies the licensee in writing that the license is terminated.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Ho K. Nieh, Director Office of Nuclear Reactor Regulation Attachments:

Appendix A - Permanently Defueled Technical Specifications Appendix B - Environmental Technical Specification Requirements Appendix C - Inter-Unit Fuel Transfer Technical Specifications Date of Issuance: September 17, 2018 Amendment No. 295

APPENDIX A TO FACILITY LICENSE DPR-26 FOR HOLTEC INDIAN POINT 2, LLC AND HOLTEC DECOMMISSIONING INTERNATIONAL, LLC INDIAN POINT NUCLEAR GENERATING PLANT UNIT NO. 2 DOCKET NO. 50-247 PERMANENTLY DEFUELED TECHNICAL SPECIFICATIONS AND BASES Amendment No. 295

FACILITY LICENSE No. DPR-26 Appendix A - Permanently Defueled Technical Specifications Table of Contents 1.0 USE AND APPLICATION 1.1 Definitions 1.2 Logical Connectors 1.3 Completion Times 1.4 Frequency 2.0 DELETED 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY SURVEILLANCE REQUIREMENT (SR) APPLICABILITY 3.7 SPENT FUEL PIT REQUIREMENTS 3.7.11 Spent Fuel Pit Water Level 3.7.12 Spent Fuel Pit Boron Concentration 3.7.13 Spent Fuel Pit Storage 4.0 DESIGN FEATURES 4.1 Site Location 4.2 Deleted 4.3 Fuel Storage 5.0 ADMINISTRATIVE CONTROLS 5.1 Responsibility 5.2 Organization 5.2.1 Onsite and Offsite Organizations 5.2.2 Facility Staff 5.3 Facility Staff Qualifications 5.4 Procedures 5.5 Programs And Manuals 5.5.1 Offsite Dose Calculation Manual (ODCM) 5.5.2 Deleted 5.5.3 Radioactive Effluent Controls Program 5.5.4 Deleted 5.5.5 Deleted 5.5.6 Deleted 5.5.7 Deleted 5.5.8 Deleted 5.5.9 Deleted 5.5.10 Explosive Gas and Storage Tank Radioactivity Monitoring Program 5.5.11 Deleted 5.5.12 Technical Specification (TS) Bases Control Program 5.5.13 Deleted 5.5.14 Deleted 5.5.15 Deleted 5.5.16 Deleted Indian Point 2 i Amendment No. 294

Definitions 1.1 1.0 USE AND APPLICATION 1.1 Definitions


NOTE-----------------------------------------------------------

The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.

Term Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.

CERTIFIED FUEL HANDLER A CERTIFIED FUEL HANDLER is an individual who complies with the provisions of the CERTIFIED FUEL HANDLER Training and Retraining Program required by TS 5.3.2.

NON-CERTIFIED OPERATOR A NON-CERTIFIED OPERATOR is a non-licensed operator who complies with the qualification requirements of Specification 5.3.1, but is not a CERTIFIED FUEL HANDLER.

Indian Point 2 1.1 - 1 Amendment No. 294

Design Features 4.0 4.0 DESIGN FEATURES 4.1 Site Location Indian Point 2 is located on the East bank of the Hudson River at Indian Point, Village of Buchanan, in upper Westchester County, New York. The site is approximately 24 miles north of the New York City boundary line. The nearest city is Peekskill which is 2.5 miles northeast of Indian Point.

The minimum distance from the reactor center line to the boundary of the site exclusion area and the outer boundary of the low population zone, as defined in 10 CFR 100.3, is 520 meters and 1100 meters, respectively. For the purpose of satisfying 10 CFR Part 20, the Restricted Area is the same as the Exclusion Area shown in the Defueled Safety Analysis Report (DSAR), Figure 2.2-2.

4.2 Deleted 4.3 Fuel Storage 4.3.1 Criticality 4.3.1.1 The spent fuel storage racks are designed and shall be maintained with:

Spent fuel shall not be stored in the Spent Fuel Pit.

Indian Point 2 4.0 - 1 Amendment No. 294

Design Features 4.0 4.0 DESIGN FEATURES 4.3 Fuel Storage (continued)

a. Fuel assemblies having a maximum U-235 enrichment of 5.0 weight percent, and poisons, if necessary, to meet the limit for keff,
b. keff 0.95 when flooded with borated water, keff < 1.0 if fully flooded with unborated water, and
c. Each fuel assembly categorized based on initial enrichment, burnup, cooling time, averaged assembly peaking factor, and number of Integral Fuel Burnable Absorbers (IFBA) rods with individual fuel assembly storage location within the spent fuel storage rack restricted as required by Technical Specification 3.7.13.

4.3.2 Drainage The spent fuel pit is designed and shall be maintained to prevent inadvertent draining of the pit below a nominal elevation of 88 feet, 6 inches.

4.3.3 Capacity The spent fuel pit is designed and shall be maintained with a storage capacity limited to no more than 269 fuel assemblies in Region I and 1105 fuel assemblies in Region II.

Indian Point 2 4.0 - 2 Amendment No. 294

Responsibility 5.1 5.0 ADMINISTRATIVE CONTROLS 5.1 Responsibility 5.1.1 The plant manager shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.

The plant manager or his designee shall approve, prior to implementation, each proposed test, experiment or modification to systems or equipment that affect nuclear safety.

5.1.2 The Shift manager (SM) shall be responsible for the shift command function.

INDIAN POINT 2 5.1 - 1 Amendment No. 292

Organization 5.2 5.0 ADMINISTRATIVE CONTROLS 5.2 Organization 5.2.1 Onsite and Offsite Organizations Onsite and offsite organizations shall be established for facility staff and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting safety of the nuclear fuel.

a. Lines of authority, responsibility, and communication shall be defined and established throughout highest management levels, intermediate levels, and all decommissioning organization positions. These relationships shall be documented and updated, as appropriate, in organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements including the facility-specific titles of those personnel fulfilling the responsibilities of the positions delineated in these Technical Specifications shall be documented in the DSAR,
b. The plant manager shall be responsible for overall safe maintenance of the facility and shall have control over those onsite activities necessary for storage and maintenance of nuclear fuel.
c. The corporate officer with direct responsibility for IP2 shall have corporate responsibility for the safe storage and handling of nuclear fuel and shall take any measures needed to ensure acceptable performance of the staff in maintaining and providing technical support to the facility to ensure safe management of nuclear fuel, and individuals that
d. The individuals who train the CERTIFIED FUEL HANDLERS, carry out health physics, or perform quality assurance functions may report to the appropriate onsite manager; however, these individuals shall have sufficient organizational freedom to ensure their ability to perform their assigned functions.

5.2.2 Facility Staff The facility staff organization shall include the following:

a. Each duty shift shall be composed of at least one shift manager and one NON-CERTIFIED OPERATOR. The NON-CERTIFIED OPERATOR position may be filled by a CERTIFIED FUEL HANDLER.

Indian Point 2 5.2 - 1 Amendment No. 294

Organization 5.2 5.2 Organization 5.2.2 Facility Staff (continued)

At least one person qualified to stand watch in the control room (NON-CERTIFIED OPERATOR or CERTIFIED FUEL HANDLER) shall be present in the control room when nuclear fuel is stored in the spent fuel pool.

b. Shift crew composition may be less than the minimum requirement of 5.2.2.a for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements and all of the following conditions are met:
1) No fuel movements are in progress;
2) No movement of loads over fuel are in progress; and
3) No unmanned shift positions during shift turnover shall be permitted while the shift crew is less than the minimum.
c. An individual qualified in radiation protection procedures shall be on site during fuel handling operations and during movement of heavy loads over the fuel storage racks. The position may be vacant for not more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.
d. Not Used.
e. The shift manager shall be a CERTIFED FUEL HANDLER.
f. Deleted.

INDIAN POINT 2 5.2 - 2 Amendment No. 292

Procedures 5.3 5.0 ADMINISTRATIVE CONTROLS 5.3 Facility Staff Qualifications 5.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI/ANS 3.1-1978 for comparable positions with exceptions specified in the HDI Quality Assurance Program Manual (QAPM).

5.3.2 An NRC approved training and retraining program for CERTIFIED FUEL HANDLERS shall be maintained.

Indian Point 2 5.3 - 1 Amendment No. 295

High Radiation Area 5.7 5.7 High Radiation Area 5.7.1 High Radiation Areas with Dose Rates Not Exceeding 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation (continued)

4. A self-reading dosimeter (e.g., pocket ionization chamber or electronic dosimeter) and, (i) Be under the surveillance, as specified in the RWP or equivalent, while in the area, of an individual qualified in radiation protection procedures, equipped with a radiation monitoring device that continuously displays radiation dose rates in the area; who is responsible for controlling personnel exposure within the area, or (ii) Be under the surveillance as specified in the RWP or equivalent, while in the area, by means of closed circuit television, of personnel qualified in radiation protection procedures, responsible for controlling personnel radiation exposure in the area, and with the means to communicate with individuals in the area who are covered by such surveillance.
e. Except for individuals qualified in radiation protection procedures, or personnel continuously escorted by such individuals, entry into such areas shall be made only after dose rates in the area have been determined and entry personnel are knowledgeable of them. These continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to initial entry.

5.7.2 High Radiation Areas with Dose Rates Greater than 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation, but less than 500 rads/hour at 1 Meter from the Radiation Source or from any Surface Penetrated by the Radiation

a. Each entryway to such an area shall be conspicuously posted as a high radiation area and shall be provided with a locked or continuously guarded door or gate that prevents unauthorized entry, and, in addition:
1. All such door and gate keys shall be maintained under the administrative control of the shift supervisor, radiation protection manager, or his or her designee. IP3 Shift Manager
2. Doors and gates shall remain locked except during periods of personnel or equipment entry or exit.

INDIAN POINT 2 5.7-2 Amendment No. 250

APPENDIX C TO FACILITY LICENSE FOR HOLTEC INDIAN POINT 2, LLC (HOLTEC IP2) AND HOLTEC DECOMMISSIONING INTERNATIONAL, LLC (HDI)

INDIAN POINT NUCLEAR GENERATING UNIT No. 2 INTER-UNIT FUEL TRANSFER TECHNICAL SPECIFICATIONS PART I: SPENT FUEL TRANSFER CANISTER AND TRANSFER CASK SYSTEM FACILITY LICENSE NO. DPR-26 DOCKET NO. 50-247 Amendment No. 295

Facility License Appendix C - Inter-Unit Fuel Transfer Technical Specifications SPENT FUEL SHIELDED TRANSFER CANISTER AND TRANSFER CASK SYSTEM

1.0 DESCRIPTION

The spent fuel transfer system consists of the following components: (1) a spent fuel shielded transfer canister (STC), which contains the fuel; (2) a transfer cask (HI-TRAC 100D) (hereafter referred to as HI-TRAC), which contains the STC during transfer operations; and (3) a bottom missile shield.

The STC and HI-TRAC are designed to transfer irradiated nuclear fuel assemblies from the Indian Point 3 (IP3) spent fuel pit to the Indian Point 2 (IP2) spent fuel pit. A fuel basket within the STC holds the fuel assemblies and provides criticality control. The shielded transfer canister provides the confinement boundary, water retention boundary, gamma radiation shielding, and heat rejection capability. The HI-TRAC provides a water retention boundary, protection of the STC, gamma and neutron radiation shielding, and heat rejection capability. The STC contains up to 12 fuel assemblies.

The STC is the confinement system for the fuel. It is a welded, multi-layer steel and lead cylinder with a welded base-plate and bolted lid. The inner shell of the canister forms an internal cylindrical cavity for housing the fuel basket. The outer surface of the canister inner shell is buttressed with lead and steel shells for radiation shielding. The minimum thickness of the steel, lead and steel shells relied upon for shielding starting with the innermost shell are 3/4 inch steel, 2 3/4 inch lead and 3/4 inch steel, respectively. The canister closure incorporates two O-ring seals to ensure its confinement function. The confinement system consists of the canister inner shell, bottom plate, top flange, top lid, top lid O-ring seals, vent port seal and cover plate, and drain port seal and coverplate. The fuel basket, for the transfer of 12 Pressurized Water Reactor (PWR) fuel assemblies, is a fully welded, stainless steel, honeycomb structure with neutron absorber panels attached to the individual storage cell walls under stainless steel sheathing.

The maximum gross weight of the fully loaded STC is 40 tons.

The HI-TRAC is a multi-layer steel and lead cylinder with a bolted bottom (or pool) and top lid.

For the fuel transfer operation the HI-TRAC is fitted with a solid top lid, an STC centering assembly, and a bottom missile shield. The inner shell of the transfer cask forms an internal cylindrical cavity for housing the STC. The outer surface of the cask inner shell is buttressed with intermediate lead and steel shells for radiation shielding. The minimum thickness of the steel, lead and steel shells relied upon for shielding starting with the innermost shell are 3/4 inch steel, 2 inch lead and 1 inch steel, respectively. An outside shell called the water jacket contains water for neutron shielding, with a minimum thickness of 5. The HI-TRAC bottom and top lids incorporate a gasket seal design to ensure its water confinement function. The water confinement system consists of the HI-TRAC inner shell, bottom lid, top lid, top lid seal, bottom lid seal, vent port seal, vent port cap and bottom drain plug.

The HI-TRAC provides a water retention boundary, protection of the STC, gamma and neutron radiation shielding, and heat rejection capability. The bottom missile shield is attached to the bottom of the HI-TRAC and provides tornado missile protection of the pool lid bolted joint. The HI-TRAC can withstand a tornado missile in other areas without the need for additional shielding. The STC centering assembly provides STC position control within the HI-TRAC and also acts as an internal impact limiter in the event of a non-mechanistic tipover accident.

INDIAN POINT 2 1 Amendment No. 294

Facility License Appendix C - Inter-Unit Fuel Transfer Technical Specifications 2.0 CONDITIONS 2.1 OPERATING PROCEDURES Written operating procedures shall be prepared for cask handling, loading, movement, surveillance, maintenance, and recovery from off normal conditions such as crane hang-up. The written operating procedures shall be consistent with the technical basis described in Chapter 10 of the Licensing Report (Holtec International Report HI-2094289).

2.2 ACCEPTANCE TESTS AND MAINTENANCE PROGRAM Written cask acceptance tests and maintenance program shall be prepared consistent with the technical basis described in Chapter 8 of the Licensing Report (Holtec International Report HI-2094289).

2.3 PRE-OPERATIONAL TESTING AND TRAINING EXERCISE A training exercise of the loading, closure, handling/transfer, and unloading, of the equipment shall be conducted prior to the first transfer. The training exercise shall not be conducted with irradiated fuel. The training exercise may be performed in an alternate step sequence from the actual procedures, but all steps must be performed. The training exercise shall include, but is not limited to the following:

a) Moving the STC into the IP3 spent fuel pool.

b) Preparation of the HI-TRAC for STC loading.

c) Selection and verification of specific fuel assemblies and non-fuel hardware to ensure type conformance.

d) Loading specific assemblies and placing assemblies into the STC (using a single dummy fuel assembly), including appropriate independent verification.

e) Remote installation of the STC lid and removal of the STC from the spent fuel pool.

f) Placement of the STC into the HI-TRAC with the STC centering assembly.

g) STC closure, establishment of STC water level with steam, verification of STC water level, STC leakage testing, and operational steps required prior to transfer, as applicable.

h) Establishment and verification of HI-TRAC water level.

i) Installation of the HI-TRAC top lid.

j) HI-TRAC closure, leakage testing, and operational steps required prior to transfer, as applicable.

k) Movement of the HI-TRAC with STC from the IP3 fuel handling building to the IP2 fuel handling building along the haul route with designated devices.

l) Moving the STC into the IP2 spent fuel pool.

m) Manual crane operations for bare STC movements including demonstration of recovery from a crane hang-up with the STC suspended from the crane.

INDIAN POINT 2 2 Amendment No. 294

APPENDIX C TO FACILITY LICENSE FOR ENTERGY NUCLEAR INDIAN POINT 2, LLC (ENIP2)

AND ENTERGY NUCLEAR OPERATIONS, INC. (ENO)

INDIAN POINT NUCLEAR GENERATING UNIT No. 2 INTER-UNIT FUEL TRANSFER TECHNICAL SPECIFICATIONS PART II: TECHNICAL SPECIFICATIONS FACILITY LICENSE NO. DPR-26 DOCKET NO. 50-247 Amendment No. 294

TABLE OF CONTENTS_________________________________________________________

1.0 USE AND APPLICATION 1.1 Definitions 1.2 Logical Connectors 1.3 Completion Times 1.4 Frequency 2.0 NOT USED 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY 3.1 INTER-UNIT FUEL TRANSFER 3.1.1 Boron Concentration 3.1.2 Shielded Transfer Canister (STC) Loading 3.1.3 Shielded Transfer Canister (STC) Initial Water Level 3.1.4 Shielded Transfer Canister (STC) Pressure Rise 3.1.5 Shielded Transfer Canister (STC) Unloading 4.0 DESIGN FEATURES 4.1 Inter-Unit Fuel Transfer 5.0 PROGRAMS 5.1 Transport Evaluation Program 5.2 Metamic Coupon Sampling Program 5.3 Technical Specifications Bases Control Program 5.4 Radiation Protection Program INDIAN POINT 2 i Amendment 268

Definitions 1.1 1.0 USE AND APPLICATION 1.1 Definitions


NOTE--------------------------------------------------------------

The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.

Term Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.

INTACT FUEL ASSEMBLIES INTACT FUEL ASSEMBLIES are fuel assemblies without known or suspected cladding defects greater than pinhole leaks or hairline cracks, and which can be handled by normal means. Fuel assemblies without fuel rods in fuel rod locations shall not be classified as INTACT FUEL ASSEMBLIES unless dummy fuel rods are used to displace an amount of water greater than or equal to that displaced by the original fuel rod(s).

LOADING OPERATIONS LOADING OPERATIONS include all licensed activities on an STC while it is being loaded with fuel assemblies and while the STC is being placed in the HI-TRAC. LOADING OPERATIONS begin when the first fuel assembly is placed in the STC and end when the HI-TRAC is suspended from or secured on the TRANSPORTER.

NON-FUEL HARDWARE (NFH) NFH is defined as Burnable Poison Rod Assemblies (BPRAs), Thimble Plug Devices (TPDs), Wet Annular Burnable Absorbers (WABAs), Rod Cluster Control Assemblies (RCCAs), Neutron Source Assemblies (NSAs), Hafnium Flux Suppressors, and Instrument Tube Tie Rods (ITTRs).

TRANSFER OPERATIONS TRANSFER OPERATIONS include all licensed activities performed on a HI-TRAC loaded with one or more fuel assemblies when it is being moved after LOADING OPERATIONS or before UNLOADING OPERATIONS.

TRANSFER OPERATIONS begin when the HI-TRAC is first suspended from or secured on the TRANSPORTER and end when the TRANSPORTER is at its destination and the HI-TRAC is no longer secured on or suspended from the TRANSPORTER.

TRANSPORTER TRANSPORTER is the device or vehicle which moves the HI-TRAC. The TRANSPORTER can either support the HI-TRAC from underneath or the HI-TRAC can be suspended from it.

(continued)

INDIAN POINT 2 1.1-1 Amendment 268

Definitions 1.1 1.1 Definitions (continued)

Term Definition UNLOADING OPERATIONS UNLOADING OPERATIONS include all licensed activities on an STC or HI-TRAC while it is being unloaded of the contained fuel assemblies. UNLOADING OPERATIONS begin when the HI-TRAC is no longer suspended from or secured on the TRANSPORTER and end when the last fuel assembly is removed from the STC.

ZR ZR means any zirconium-based fuel cladding authorized for use in a commercial nuclear power plant reactor.

INDIAN POINT 2 1.1-2 Amendment 268

Logical Connectors 1.2 1.0 USE AND APPLICATION 1.2 Logical Connectors PURPOSE The purpose of this section is to explain the meaning of logical connectors.

Logical connectors are used in Technical Specifications (TS) to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies. The only logical connectors that appear in TS are AND and OR. The physical arrangement of these connectors constitutes logical conventions with specific meanings.

BACKGROUND Several levels of logic may be used to state Required Actions. These levels are identified by the placement (or nesting) of the logical connectors and by the number assigned to each Required Action. The first level of logic is identified by the first digit of the number assigned to a Required Action and the placement of the logical connector in the first level of nesting (i.e., left justified with the number of the Required Action).

The successive levels of logic are identified by additional digits of the Required Action number and by successive indentions of the logical connectors.

When logical connectors are used to state a Condition, Completion Time, Surveillance, or Frequency, only the first level of logic is used, and the logical connector is left justified with the statement of the Condition, Completion Time, Surveillance, or Frequency.

(continued)

INDIAN POINT 2 1.2-1 Amendment 268

Logical Connectors 1.2 1.2 Logical Connectors (continued)

EXAMPLES The following examples illustrate the use of logical connectors.

EXAMPLE 1.2-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met. A.1 VERIFY . . .

AND A.2 Restore . . .

In this example the logical connector AND is used to indicate that when in Condition A, both Required Actions A.1 and A.2 must be completed.

(continued)

INDIAN POINT 2 1.2-2 Amendment 268

Logical Connectors 1.2 1.2 Logical Connectors (continued)

EXAMPLES EXAMPLE 1.2-2 (continued)

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met. A.1 Stop . . .

OR A.2.1 Verify . . .

AND A.2.2.1 Reduce . . .

OR A.2.2.2 Perform . . .

OR A.3 Remove . . .

This example represents a more complicated use of logical connectors.

Required Actions A.1, A.2, and A.3 are alternative choices, only one of which must be performed as indicated by the use of the logical connector OR and the left justified placement. Any one of these three ACTIONS may be chosen. If A.2 is chosen, then both A.2.1 and A.2.2 must be performed as indicated by the logical connector AND. Required Action A.2.2 is met by performing A.2.2.1 or A.2.2.2. The indented position of the logical connector OR indicates that A.2.2.1 and A.2.2.2 are alternative choices, only one of which must be performed.

INDIAN POINT 2 1.2-3 Amendment 268

Completion Times 1.3 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify the lowest functional capability or performance levels of equipment required for safe operation of the facility. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Times(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the Spent Fuel Shielded Transfer Canister and Transfer Cask System is in a specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the Spent Fuel Shielded Transfer Canister and Transfer Cask System is not within the LCO Applicability.

Once a Condition has been entered, subsequent subsystems, components, or variables expressed in the Condition, discovered to be not within limits, will not result in separate entry into the Condition unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition.

(continued)

INDIAN POINT 2 1.3-1 Amendment 268

Completion Times 1.3 1.3 Completion Times (continued)

EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.

EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required B.1 Perform Action B.1 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action and associated AND Completion Time not met. B.2 Perform Action B.2 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Condition B has two Required Actions. Each Required Action has its own separate Completion Time. Each Completion Time is referenced to the time that Condition B is entered.

The Required Actions of Condition B are to complete action B.1 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND complete action B.2 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. A total of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is allowed for completing action B.1 and a total of 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (not 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />) is allowed for completing action B.2 from the time that Condition B was entered. If action B.1 is completed within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, the time allowed for completing action B.2 is the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> because the total time allowed for completing action B.2 is 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

(continued)

INDIAN POINT 2 1.3-2 Amendment 268

Completion Times 1.3 1.3 Completion Times (continued)

EXAMPLES EXAMPLE 1.3-2 (continued)

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One system A.1 Restore system 7 days not within limit. to within limit.

B. Required B.1 Complete 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action and action B.1.

associated Completion AND Time not met.

B.2 Complete 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> action B.2.

When a system is determined not to meet the LCO, Condition A is entered. If the system is not restored within 7 days, Condition B is also entered and the Completion Time clocks for Required Actions B.1 and B.2 start. If the system is restored after Condition B is entered, Conditions A and B are exited, and therefore, the Required Actions of Condition B may be terminated.

(continued)

INDIAN POINT 2 1.3-3 Amendment 268

Completion Times 1.3 1.3 Completion Times (continued)

EXAMPLES EXAMPLE 1.3-3 (continued)

ACTIONS


NOTE-------------------------------------------

Separate Condition entry is allowed for each component.

CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met. A.1 Restore 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> compliance with LCO.

B. Required B.1 Complete action 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action and B.1.

associated Completion AND Time not met.

B.2 Complete action 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B.2.

The Note above the ACTIONS table is a method of modifying how the Completion Time is tracked. If this method of modifying how the Completion Time is tracked was applicable only to a specific Condition, the Note would appear in that Condition rather than at the top of the ACTIONS Table.

The Note allows Condition A to be entered separately for each component, and Completion Times tracked on a per component basis.

When a component is determined to not meet the LCO, Condition A is entered and its Completion Time starts. If subsequent components are determined to not meet the LCO, Condition A is entered for each component and separate Completion Times start and are tracked for each component.

IMMEDIATE When "Immediately" is used as a Completion Time, the Required Action COMPLETION should be pursued without delay and in a controlled manner.

TIME INDIAN POINT 2 1.3-4 Amendment 268

Frequency 1.4 1.0 USE AND APPLICATION 1.4 Frequency PURPOSE The purpose of this section is to define the proper use and application of Frequency requirements.

DESCRIPTION Each Surveillance Requirement (SR) has a specified Frequency in which the Surveillance must be met in order to meet the associated Limiting Condition for Operation (LCO). An understanding of the correct application of the specified Frequency is necessary for compliance with the SR.

The "specified Frequency" is referred to throughout this section and each of the Specifications of Section 3.0, Surveillance Requirement (SR)

Applicability. The "specified Frequency" consists of the requirements of the Frequency column of each SR.

Situations where a Surveillance could be required (i.e., its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 3.0.4 conflicts. To avoid these conflicts, the SR (i.e., the Surveillance or the Frequency) is stated such that it is only "required" when it can be and should be performed. With an SR satisfied, SR 3.0.4 imposes no restriction.

(continued)

INDIAN POINT 2 1.4-1 Amendment 268

Frequency 1.4 1.4 Frequency (continued)

EXAMPLES The following examples illustrate the various ways that Frequencies are specified.

EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify pressure within limit 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications (TS). The Frequency specifies an interval (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 3.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when the equipment or variables are outside specified limits, or the facility is outside the Applicability of the LCO). If the interval specified by SR 3.0.2 is exceeded while the facility is in a condition specified in the Applicability of the LCO, the LCO is not met in accordance with SR 3.0.1.

If the interval as specified by SR 3.0.2 is exceeded while the facility is not in a condition specified in the Applicability of the LCO for which performance of the SR is required, the Surveillance must be performed within the Frequency requirements of SR 3.0.2 prior to entry into the specified condition. Failure to do so would result in a violation of SR 3.0.4.

(continued)

INDIAN POINT 2 1.4-2 Amendment 268

Frequency 1.4 1.4 Frequency (continued)

EXAMPLES (continued) EXAMPLE 1.4-2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify flow is within limits. Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to starting activity AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter Example 1.4-2 has two Frequencies. The first is a one time performance Frequency, and the second is of the type shown in Example 1.4-1. The logical connector "AND" indicates that both Frequency requirements must be met. Each time the example activity is to be performed, the Surveillance must be performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to starting the activity.

The use of "once" indicates a single performance will satisfy the specified Frequency (assuming no other Frequencies are connected by "AND").

This type of Frequency does not qualify for the 25% extension allowed by SR 3.0.2.

"Thereafter" indicates future performances must be established per SR 3.0.2, but only after a specified condition is first met (i.e., the "once" performance in this example). If the specified activity is canceled or not performed, the measurement of both intervals stops. New intervals start upon preparing to restart the specified activity.

INDIAN POINT 2 1.4-3 Amendment 268

Not Used 2.0 2.0 NOT USED This section is intentionally left blank INDIAN POINT 2 2.0-1 Amendment 268

LCO Applicability 3.0 3.0 LIMITING CONDITIONS FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during specified conditions in the Applicability, except as provided in LCO 3.0.2.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.

LCO 3.0.3 Not applicable.

LCO 3.0.4 When an LCO is not met, entry into a specified condition in the Applicability shall not be made except when the associated ACTIONS to be entered permit continued operation in the specified condition in the Applicability for an unlimited period of time. This Specification shall not prevent changes in specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of an STC.

LCO 3.0.5 Equipment removed from service or not in service in compliance with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate it meets the LCO or that other equipment meets the LCO. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing.

INDIAN POINT 2 3.0-1 Amendment 268

SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as once, the above interval extension does not apply. If a Completion Time requires periodic performance on a once per... basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

SR 3.0.4 Entry into a specified condition in the Applicability of an LCO shall not be made unless the LCO's Surveillances have been met within their specified Frequency. This provision shall not prevent entry into specified conditions in the Applicability that are required to comply with Actions or that are related to the unloading of an STC.

INDIAN POINT 2 3.0-2 Amendment 268

Boron Concentration 3.1.1 3.1 INTER-UNIT FUEL TRANSFER 3.1.1 Boron Concentration LCO 3.1.1 The boron concentration of the water in the Spent Fuel Pit and the STC shall be 2000 ppm.

APPLICABILITY: Whenever one or more fuel assemblies are in the STC.


NOTE-----------------------------------------------

Only applicable to the spent fuel pit when the STC is in the spent fuel pit ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME A. Boron concentration not A.1 Suspend LOADING Immediately within limit. OPERATIONS or UNLOADING OPERATIONS.

AND A.2 Suspend positive reactivity Immediately additions.

AND A.3 Initiate action to restore boron Immediately concentration to within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY


NOTE--------------------------------------------- Once, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to This surveillance is only required to be performed if the STC is entering the submerged in water in the spent fuel pool or if water is added to, or Applicability of this recirculated through, the STC when the STC is in the HI-TRAC. Any LCO.

added water must meet the boron concentration requirement of LCO 3.1.1.


AND SR 3.1.1.1 Verify the boron concentration is within limit using two Once per 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> separate measurements. thereafter.

INDIAN POINT 2 3.1.1-1 Amendment 268

STC Loading 3.1.2 3.1 INTER-UNIT FUEL TRANSFER 3.1.2 Shielded Transfer Canister (STC) Loading LCO 3.1.2 INTACT FUEL ASSEMBLIES placed into the Shielded Transfer Canister (STC) shall be classified in accordance with Table 3.1.2-1 based on initial enrichment and burnup and shall be restricted based on the following:

a. INTACT FUEL ASSEMBLIES classified as Type 2 may be placed in the STC basket (see Figure 3.1.2-1) with the following restrictions:
1. Post-irradiation cooling time, initial enrichment, and allowable average burnup shall be within the limits for the cell locations as specified in Table 3.1.2-3;
2. Decay heat including NON FUEL HARDWARE 1.2 kW (any cell);
3. T ot al ST C Decay heat f r o m a l l c e l l l o c a t i o n s including NON FUEL HARDWARE 9.621 kW;
4. Post-irradiation cooling time and the maximum average burnup of NON FUEL HARDWARE shall be within the cell locations and limits specified in Table 3.1.2-2. In accordance with Table 3.1.2-2 RCCAs and Hafnium Flux Suppressors cannot be placed in locations 5, 6, 7, 8, 9, 10, 11, 12 of the STC basket.

- NOTE -

If one or more Type 1 fuel assemblies are in the STC, cells 1, 2, 3, AND 4 must be empty, with a cell blocker installed that prevents inserting fuel assemblies and/or NON-FUEL HARDWARE.

b. INTACT FUEL ASSEMBLIES classified as Type 1 or Type 2 may be placed in locations 5, 6, 7, 8, 9, 10, 11, 12 of the STC basket (see Figure 3.1.2-1) with the following restrictions:
1. Post-irradiation cooling time, initial enrichment, and allowable average burnup shall be within the limits for the cell locations as specified in Table 3.1.2-3;
2. Decay heat including NON FUEL HARDWARE 1.2 kW;
3. Post-irradiation cooling time and the maximum average burnup of NON FUEL HARDWARE shall be within the cell locations and limits specified in Table 3.1.2-2. In accordance with Table 3.1.2-2 RCCAs and Hafnium Flux Suppressors cannot be placed in locations 5, 6, 7, 8, 9, 10, 11, 12 of the STC basket.
c. Only INTACT FUEL ASSEMBLIES with initial average enrichment 4.4 wt% U-235 and discharged prior to IP3 Cycle 12 shall be placed in the STC basket. IP3 fuel assemblies V43 and V48 shall not be selected for transfer.

INDIAN POINT 2 3.1.2-1 Amendment 287

STC Loading

3.1.2 APPLICABILITY

Whenever one or more fuel assemblies are in the STC.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more fuel A.1.1 Initiate action to Immediately assemblies or NON restore compliance FUEL HARDWARE in with LCO 3.1.2.

the STC do not meet the LCO limits. OR A.1.2 Initiate action to move fuel to the IP3 spent fuel pit in accordance with IP3 Appendix A Technical Specification LCO 3.7.16.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.2.1 Verify by administrative means that the fuel Prior to placing the fuel assembly and NON FUEL HARDWARE meets the assembly in the STC.

requirements specified in the LCO for placement in the STC.

SR 3.1.2.2 Verify by visual inspection that a cell blocker which Prior to placing a Type 1 prevents inserting fuel assemblies and/or NON- fuel assembly in the STC.

FUEL HARDWARE into cells 1, 2, 3, and 4 of the STC is installed.

INDIAN POINT 2 3.1.2-2 Amendment 268

STC Loading 3.1.2 Cell Cell 5 6 Cell Cell Cell Cell 12 1 2 7 Cell Cell Cell Cell 11 4 3 8 Cell Cell 10 9 Figure 3.1.2-1 Shielded Transfer Canister Layout (Top View)

INDIAN POINT 2 3.1.2-3 Amendment 268

STC Loading 3.1.2 Table 3.1.2-1 Minimum Burnup Requirements at Varying Initial Enrichments(a)

Configuration A(c) Configuration B(d)

Maximum Assembly Minimum Assembly Minimum Assembly Initial Enrichment(f)(g)

Average Burnup Average Burnup (wt% U235)

(MWD/MTU)(b) (MWD/MTU)(b) 2.0 5,400 6,000 2.5 13,800 18,800 3.0 22,100 28,600 3.5 30,000 37,300 4.0 36,900 44,600 4.5 42,700 52,500 5.0 48,700 Note (e)

(a) Fuel that does not meet the minimum assembly average burnup at a given initial enrichment is classified as Type 1 fuel. Fuel that meets the minimum assembly average burnup at a given initial enrichment is classified as Type 2 fuel.

(b) Linear interpolation between enrichment levels to determine minimum burnup requirements is permitted.

(c) Assemblies that have not been located in any cycle under a control rod bank that was permitted to be inserted during full power operation or where it can be shown that the insertion did not exceed 8 inches below the top of the active fuel.

(d) Assemblies that have been located under a control rod bank that was permitted to be inserted during full power operation and where the insertion was more than 8 inches below the top of the active fuel. This configuration also applies to fuel assemblies that have contained a Hafnium Flux Suppressor.

(e) Configuration B assemblies with enrichment greater than 4.5 are classified as Type 1 fuel.

(f) Natural or enriched uranium blankets are not considered in determining the fuel assembly average enrichment for comparison to the maximum allowed initial average enrichment.

(g) Rounding to one decimal place to determine initial enrichment is not permitted.

INDIAN POINT 2 3.1.2-4 Amendment 268

STC Loading 3.1.2 Table 3.1.2-2 NON FUEL HARDWARE(a) Post Irradiation Cooling Times and Allowable Average Burnup Maximum Burnup Post-irradiation (MW D/MTU)

Cooling Time (years) BPRAs and Hafnium Flux TPDs(b)(c) RCCAs WABAs(b, d) Suppressors 6 20000 N/A 630000 20000 7 - 20000 - -

8 30000 - - 30000 9 40000 30000 - -

10 50000 40000 - -

11 60000 45000 - -

12 - 50000 - -

13 - 60000 - -

14 - - - -

15 - 90000 - -

16 - 630000 - -

20 - - - -

Allowed Up to twelve Up to twelve Up to four (4) Up to four (4)

Quantity and (12) per transfer (12) per per transfer in per transfer in Location in any location transfer in Cells 1, 2, 3, Cells 1, 2, 3, any location and/or 4 and/or 4 (a) NON-FUEL HARDWARE burnup and cooling time limits are not applicable to Instrument Tube Tie Rods (ITTRs), since they are installed post-irradiation. NSAs are not authorized for loading in the STC.

(b) Linear interpolation between points is only permitted for BPRAs, WABAs, and TPDs, with the exception that interpolation is not permitted for TPDs with burnups greater than 90 GWd/MTU and cooling times greater than 15 years.

(c) N/A means not authorized for loading at this cooling time.

(d) Burnup and Cooling time limits in this column are only applicable to Loading Patterns 1-6 in Table 3.1.2-3. For Loading Patterns 7-12 in Table 3.1.2-3, the burnup and cooling time limits for a BPRA are the same as those for the fuel assembly they are located in.

INDIAN POINT 2 3.1.2-5 Amendment No. 287

STC Loading 3.1.2 Table 3.1.2-3 (Sheet 1 of 2)

Allowable STC Loading Configurations Configuration(c) Cells 1, 2, 3, 4(a)(b) Cells 5, 6, 7, 8, 9, 10, 11, 12(a)(b)

Burnup 55,000 MWD/MTU Burnup 40,000 MWD/MTU Cooling time 10 years Cooling time 25 years 1 Initial Enrichment 3.4 wt% U-235 Initial Enrichment 2.3 wt% U-235 Burnup 45,000 MWD/MTU Burnup 45,000 MWD/MTU Cooling time 10 years Cooling time 20 years 2 Initial Enrichment 3.2 wt% U-235 Initial Enrichment 3.2 wt% U-235 Burnup 55, 000 MWD/MTU Burnup 45,000 MWD/MTU Cooling time 10 years Cooling time 20 years 3 Initial Enrichment 3.4 wt% U-235 Initial Enrichment 3.2 wt% U-235 Burnup 45, 000 MWD/MTU Burnup 40,000 MWD/MTU Cooling time 10 years Cooling time 12 years 4 Initial Enrichment 3.6 wt% U-235 Initial Enrichment 3.2 wt% U-235 Burnup 45, 000 MWD/MTU Burnup 40,000 MWD/MTU Cooling time 14 years Cooling time 12 years 5 Initial Enrichment 3.4 wt% U-235 Initial Enrichment 3.2 wt% U-235 Burnup 45,000 MWD/MTU Burnup 40,000 MWD/MTU Cooling time 20 years Cooling time 20 years 6 Initial Enrichment 3.2 wt% U-235 Initial Enrichment 2.3 wt% U-235 INDIAN POINT 2 3.1.2-6 Amendment No. 287

STC Loading 3.1.2 Table 3.1.2-3 (Sheet 2 of 2)

Allowable STC Loading Configurations Configuration(c) Cells 1, 2, 3, 4(a)(b) Cells 5, 6, 7, 8, 9, 10, 11, 12(a)(b)

Burnup 45,000 MWD/MTU Burnup 45,000 MWD/MTU 7

Cooling time 10 years Cooling time 12 years Initial Enrichment 3.2 wt% U-235 Initial Enrichment 3.2 wt% U-235 Burnup 55,000 MWD/MTU Burnup 55,000 MWD/MTU 8

Cooling time 10 years Cooling time 15 years Initial Enrichment 3.4 wt% U-235 Initial Enrichment 3.4 wt% U-235 Burnup 55,000 MWD/MTU Burnup 45,000 MWD/MTU 9

Cooling time 11 years Cooling time 12 years Initial Enrichment 3.4 wt% U-235 Initial Enrichment 3.2 wt% U-235 Burnup 45,000 MWD/MTU Burnup 55,000 MWD/MTU 10 Cooling time 10 years Cooling time 15 years Initial Enrichment 3.2 wt% U-235 Initial Enrichment 3.4 wt% U-235 Burnup 45,000 MWD/MTU Burnup 45,000 MWD/MTU 11 Cooling time 6 years Cooling time 14 years Initial Enrichment 3.2 wt% U-235 Initial Enrichment 3.2 wt% U-235 Burnup 60,000 MWD/MTU Burnup 50,000 MWD/MTU 12 Cooling time 9 years Cooling time 14 years Initial Enrichment 4.2 wt% U-235 Initial Enrichment 3.6 wt% U-235 (a) Initial enrichment is the assembly average enrichment. Natural or enriched uranium blankets are not considered in determining the fuel assembly average enrichment for comparison to the minimum allowed initial average enrichment.

(b) Rounding to one decimal place to determine initial enrichment is permitted.

(c) Fuel with five middle lnconel spacers are limited to cells 1, 2, 3, and 4 for all loading configurations except loading configuration 6 which allows fuel with lnconel spacers in all cells.

INDIAN POINT 2 3.1.2-7 Amendment No. 287

STC Initial Water Level 3.1.3 3.1 INTER-UNIT FUEL TRANSFER 3.1.3 Shielded Transfer Canister (STC) Initial Water Level LCO 3.1.3 The established water level in the STC shall be 9.0+0.5/-1.5 inches below the bottom of the STC lid.

APPLICABILITY: Prior to TRANSFER OPERATIONS when the STC is in the HI-TRAC and the STC lid has been installed.

ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME A. STC water level not within -------------------NOTE---------------- Immediately limit.

Water used for level restoration must meet the boron concentration requirement of LCO 3.1.1.

A.1 Initiate action to restore STC water level.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.3.1 Verify the initial STC water level is within limit by Once prior to verifying the following during STC water level TRANSFER establishment: OPERATIONS.

a. steam is emitted from the STC drain tube; and
b. the volume of water removed is 35.4 gallons and 47.9 gallons.

INDIAN POINT 2 3.1.3-1 Amendment 268

STC Pressure Rise 3.1.4 3.1 INTER-UNIT FUEL TRANSFER 3.1.4 Shielded Transfer Canister (STC) Pressure Rise LCO 3.1.4 The pressure rise in the STC cavity shall be 0.2 psi/hr averaged over a rolling 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> period.

APPLICABILITY: Over a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period after successful completion of LCO 3.1.3 and prior to TRANSFER OPERATIONS when the STC is in the HI-TRAC and the STC lid has been installed.

ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME A. Rate of STC cavity A.1.1 Establish a vent path on the Immediately pressure rise not within STC.

limit.

AND


NOTE--------------

Water used for recirculation must meet the boron concentration requirement of LCO 3.1.1.

A.1.2 Begin circulation of borated water in the STC to establish and maintain the STC water exit temperature < 180oF.

AND A.1.3 Begin actions to determine the reason for exceeding the pressure rise limit.

(continued)

INDIAN POINT 2 3.1.4-1 Amendment 268

STC Pressure Rise 3.1.4 ACTIONS (continued)

COMPLETION CONDITION REQUIRED ACTION TIME B. Required Action A.1.3 B.1.1 Return the STC to the spent 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> indicates a fuel misload. fuel pool and remove the STC lid.

AND B.1.2 Return any misloaded fuel to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the IP3 spent fuel pit in accordance with IP3 Appendix A Technical Specification LCO 3.7.16.

C. Required Action A.1.3 C.1 Develop and initiate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> does not indicate a fuel corrective actions necessary misload. to return the STC to compliance with LCO 3.1.3 and LCO 3.1.4.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.4.1 ------------------------------NOTE--------------------------- Once prior to Pressure measurements shall be taken once upon TRANSFER establishing required water level AND hourly OPERATIONS.

thereafter for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Pressure may initially drop during pressure stabilization.

Verify by direct measurement that the rate of STC cavity pressure rise is within limit.

SR 3.1.4.2 Verify that an ASME code compliant pressure relief During valve or rupture disc and two channels of pressure performance of SR instrumentation with a range of at least 0.1 psia to 15 3.1.4.1.

psia and calibrated to within 1% accuracy within the past 12 months are installed on the STC.

INDIAN POINT 2 3.1.4-2 Amendment 268

STC Unloading 3.1.5 3.1 INTER-UNIT FUEL TRANSFER 3.1.5 Shielded Transfer Canister (STC) Unloading


NOTE-----------------------------------------------------

1. Only IP3 spent fuel assemblies are permitted to be in the STC.
2. Once each IP3 spent fuel assembly removed from the STC has been placed in an IP2 spent fuel rack location and disconnected from the spent fuel pit bridge crane, it may not be returned to the STC.

LCO 3.1.5 IP3 spent fuel assemblies transferred to IP2 via the STC must be either in an approved IP2 spent fuel pit storage rack location per IP2 Appendix A Technical Specification LCO 3.7.13, in their authorized STC fuel basket cell, or be in transit between these two locations.

APPLICABILITY: Whenever the STC is in the Unit 2 spent fuel pit.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more fuel A.1 Initiate action to Immediately assemblies not in the restore compliance required location. with LCO 3.1.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify by administrative means that a fuel Once, after each re-loaded assembly returned to the STC has been re- fuel assembly is returned to loaded into the same STC cell from which it was the STC.

removed.

INDIAN POINT 2 3.1.5-1 Amendment 268

Design Features 4.0 4.0 DESIGN FEATURES 4.1 Inter-Unit Fuel Transfer 4.1.1 Fuel Assemblies Fuel assemblies selected for inter-unit transfer of fuel shall meet the fuel characteristics specified in Table 4.1.1-1.

4.1.2 Criticality 4.1.2.1 The Shielded Transfer Canister (STC) is designed and shall be maintained with:

a. Fuel assemblies having a maximum U-235 enrichment of 5.0 weight percent;
b. keff 0.95 if fully flooded with unborated water;
c. A nominal 9.218 inch center-to-center distance between fuel assemblies placed in the STC basket;
d. Basket cell ID: 8.79 in. (nominal);
e. Basket cell wall thickness: 0.28 in. (nominal);
f. B4C in the Metamic neutron absorber: 31.5 wt.% and 33.0 wt.%;
g. The B4C in the Metamic neutron absorber will contain boron with an isotopic B-10 content of at least 18.4%;
h. Metamic panel thickness: 0.102 in.;
i. The size and location of the neutron absorber panels shall be in accordance with drawing 6015, revision 6, which can be found in the Licensing Report (Holtec International Report HI-2094289).

4.1.2.2 Drainage The STC is designed and shall be maintained to prevent inadvertent draining.

4.1.2.3 Capacity The STC is designed and shall be maintained with a capacity of no more than 12 fuel assemblies.

(continued)

INDIAN POINT 2 4.0-1 Amendment 268

Design Features 4.0 4.0 DESIGN FEATURES (continued) 4.1.3 Codes and Standards The American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), 2004 Edition, is the governing Code for the STC, as clarified below, except for Code Sections V and IX. The latest effective editions of ASME Code Sections V and IX, including addenda, may be used for activities governed by those sections, provided a written reconciliation of the later edition against the 2004 Edition, is performed. Table 4.1.3-1 lists approved alternatives to the ASME Code for the design of the STC.

4.1.4 Geometric Arrangements and Process Variables The following are geometric arrangements and process variables that require a one time verification as part of each inter-unit fuel transfer operation:

1. LOADING OPERATIONS, TRANSFER OPERATIONS, and UNLOADING OPERATIONS shall only be conducted with working area ambient temperatures 0oF.
2. LOADING OPERATIONS shall only be conducted when the spent fuel pit water temperature and the fuel handling building ambient temperatures are both 100oF.
3. LOADING OPERATIONS shall only be conducted when the IP3 spent fuel pit contains no unirradiated fuel assemblies.
4. LOADING OPERATIONS shall only be conducted when the irradiated fuel assemblies in the IP3 spent fuel pit have been subcritical for at least 90 days.
5. TRANSFER OPERATIONS shall only be conducted when the outside air temperature is 100oF.
6. TRANSFER OPERATIONS shall only be conducted when the STC trunnions are offset from the HI-TRAC trunnions in the azimuthal direction by at least 30 degrees.
7. TRANSFER OPERATIONS shall only be conducted after STC seal leak tests have demonstrated no detected leakage when tested to a sensitivity of 1x10-3 ref-cm3/s in accordance with the pre-shipment test requirements of ANSI N14.5.
8. Prior to installing the HI-TRAC lid the HI-TRAC water level shall be verified by two separate inspections to be within +0/-1 inch of the top of the STC lid.

(continued)

INDIAN POINT 2 4.0-2 Amendment 268

Design Features 4.0 4.0 DESIGN FEATURES (continued)

9. TRANSFER OPERATIONS shall only be conducted after the combined leak rate through the HI-TRAC top lid and vent port cover seals are confirmed to be water tight using an acceptable leak test from ANSI N14.5 and the pool lid seal is verified to be water tight by visual inspection.
10. TRANSFER OPERATIONS shall not occur with a TRANSPORTER that contains > 50 gallons of diesel fuel.

Table 4.1.1-1 Fuel Assembly Characteristics Fuel Assembly Class 15x15(a)

No. of Fuel Rod Locations 204 Cladding Type ZR Guide/Instrument Tube Type ZR Design Initial U (kg/assembly) 473 Fuel Rod Clad O.D. (in) 0. 422 Fuel Rod Clad I.D. (in) 0. 3734 Fuel Pellet Diameter (in) 0. 3659 Fuel Rod Pitch (in) 0.563 Active Fuel Length (in) 144 Fuel Assembly Length (in) 160 Fuel Assembly Width (in) 8.54 No. of Guide and/or Instrument Tubes 21 Guide/Instrument Tube Thickness (in) 0. 017 (b)

Axial Blanket Enrichment (wt % U-235) 3.2 (b)

Axial Blanket Length (in) 6 (a) All dimensions are design nominal values. Maximum and minimum dimensions are specified to bound variations in design nominal values among fuel assemblies within the 15x15 class.

(b) Applicable only if axial blankets are present.

(continued)

INDIAN POINT 2 4.0-3 Amendment 268

Design Features 4.0 4.0 DESIGN FEATURES (continued)

Table 4.1.3-1 (page 1 of 2)

List of ASME Code Alternatives for the STC Component Reference ASME Code Requirement Alternative, Justification &

Code Compensatory Measures Section/Article STC ND-1000 Statement of Cask confinement boundary is designed, and will Confinement requirements for Code be fabricated in accordance with ASME Code, Boundary stamping of Section III, Subsection ND to the maximum components. practical extent, but Code stamping is not required.

STC ND-2000 Requires materials to be Holtec approved suppliers will supply materials Confinement supplied by ASME- with CMTRs per ND-2000.

Boundary approved material supplier.

STC and STC ND-3100 Provides requirements These requirements are not applicable. The basket NG-3100 for determining design Licensing Report, serving as the Design assembly loading conditions, such Specification, establishes the service conditions as pressure, and load combinations for fuel transfer.

temperature, and mechanical loads.

STC ND-7000 Vessels are required to No overpressure protection is provided. Function Confinement have overpressure of cask vessel is as a radionuclide confinement Boundary protection. boundary under normal and hypothetical accident conditions. Cask is designed to withstand maximum internal pressure and maximum accident temperatures.

STC ND-8000 States requirement for STC to be marked and identified in accordance Confinement name, stamping and with drawing 6013(a). Code stamping is not Boundary reports per NCA-8000 required. QA data package prepared in accordance with Holtecs approved QA program.

INDIAN POINT 2 4.0-4 Amendment 268

Design Features 4.0 4.0 DESIGN FEATURES (continued)

Table 4.1.3-1 (page 2 of 2)

List of ASME Code Alternatives for the STC Component Reference ASME Code Requirement Alternative, Justification &

Code Compensatory Measures Section/Article STC Basket NG-4420 NG-4427(a) requires a Modify the Code requirement (intended for core Assembly fillet weld in any single support structures) with the following text prepared to continuous weld may accord with the geometry and stress analysis be less than the imperatives for the fuel basket: For the longitudinal specified fillet weld STC basket fillet welds, the following criteria apply:

dimension by not 1) The specified fillet weld throat dimension must be more than 1/16 inch, maintained over at least 92 percent of the total weld provided that the total length. All regions of undersized weld must be less undersize portion of than 3 inches long and separated from each other by the weld does not at least 9 inches. 2) Areas of undercuts and porosity exceed 10 percent of beyond that allowed by the applicable ASME Code the length of the weld. shall not exceed 1/2 inch in weld length. The total Individual undersize length of undercut and porosity over any 1-foot weld portions shall not length shall not exceed 2 inches. 3) The total weld exceed 2 inches in length in which items (1) and (2) apply shall not length. exceed a total of 10 percent of the overall weld length. The limited access of the STC basket panel longitudinal fillet welds makes it difficult to perform effective repairs of these welds and creates the potential for causing additional damage to the basket assembly (e.g., to the neutron absorber and its sheathing) if repairs are attempted. The acceptance criteria provided in the foregoing have been established to comport with the objectives of the basket design and preserve the margins demonstrated in the supporting stress analysis.

From the structural standpoint, the weld acceptance criteria are established to ensure that any departure from the ideal, continuous fillet weld seam would not alter the primary bending stresses on which the design of the fuel baskets is predicated. Stated differently, the permitted weld discontinuities are limited in size to ensure that they remain classifiable as local stress elevators (peak stress, F, in the ASME Code for which specific stress intensity limits do not apply).

STC Basket NG-8000 States requirements STC basket to be marked and identified in Assembly for nameplates, accordance with drawing 6015(a). No Code stamping stamping and reports is required. The STC basket data package is to be in per NCA-8000. conformance with Holtec's QA program.

(a) Holtec International Report HI-2094289 INDIAN POINT 2 4.0-5 Amendment 268

Programs 5.0 5.0 PROGRAMS The following programs shall be established, implemented and maintained.

5.1 Transport Evaluation Program

a. For lifting of the loaded STC or loaded HI-TRAC using equipment which is integral to a structure governed by 10 CFR Part 50 regulations, 10 CFR 50 requirements apply.
b. This program is not applicable when the loaded HI-TRAC is in the fuel building or is being handled by equipment providing support from underneath (e.g., on air pads).
c. The loaded HI-TRAC may be lifted to any height necessary during TRANSFER OPERATIONS provided the lifting equipment is designed in accordance with items 1, 2, and 3 below.
1. The metal body and any vertical columns of the lifting equipment shall be designed to comply with stress limits of ASME Section III, Subsection NF, Class 3 for linear structures. All vertical compression loaded primary members shall satisfy the buckling criteria of ASME Section III, Subsection NF.
2. The horizontal cross beam and any lifting attachments used to connect the load to the lifting equipment shall be designed, fabricated, operated, tested, inspected, and maintained in accordance with applicable sections and guidance of NUREG-0612, Section 5.1. This includes applicable stress limits from ANSI N14.6.
3. The lifting equipment shall have redundant drop protection features which prevent uncontrolled lowering of the load.
d. The lift height of the loaded HI-TRAC above the transport route surface or other supporting surface shall be limited to 6 inches, except as provided in Specification 5.1.c.

5.2 Metamic Coupon Sampling Program A coupon surveillance program shall be implemented to maintain surveillance of the Metamic neutron absorber material under the radiation, chemical, and thermal environment of the STC.

The surveillance program will be implemented to monitor the performance of Metamic by installing a minimum of four bare coupons near the maximum gamma flux elevation (mid height) at no less than four circumferential downcomer areas around the STC fuel basket. At any time during its use the STC must have a minimum of one coupon installed in each quadrant. Metamic coupons used for testing must have been installed during the entire fuel loading history of the STC.

The following specifications apply:

(i) Coupon size will be nominally 4 x 6. Each coupon will be marked with a unique identification number.

(continued)

INDIAN POINT 2 5.0-1 Amendment 268

Programs 5.0 5.0 PROGRAMS (continued)

(ii) Pre-characterization testing: Before installation, each coupon will be measured and weighed. The measurements shall be taken at locations pre-specified in the test program. Each coupon shall be tested by neutron attenuation before installation in the STC. The weight, length, width, thickness, and results of the neutron attenuation testing shall be documented and retained.

(iii) Four coupons shall be tested at the end of each inter-unit fuel transfer campaign. A campaign shall not last longer than two years. The coupons shall be measured and weighed and the results compared with the pre-characterization testing data. The results shall be documented and retained.

(iv) The coupons shall be examined for any indication of swelling, delamination, edge degradation, or general corrosion. The results of the examination shall be documented and retained.

(v) The coupons shall be tested by neutron attenuation and the results compared with the pre-characterization testing data. The results of the testing shall be documented and retained. Results are acceptable if the measured value is within +/-2.5% of the value measured for the same coupon at manufacturing.

(vi) The coupons shall be returned to their locations in the STC unless anomalous material behavior is found. If the results indicate anomalous material behavior, evaluation and corrective actions shall be pursued.

5.3 Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.

a. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
b. Licensees may make changes to Bases without prior NRC approval provided the changes do not involve either of the following:
1. a change in the TS incorporated in the license; or
2. a change to the updated FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
c. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the UFSAR.
d. Proposed changes that do not meet the criteria of Specification 5.3.b above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71(e).

(continued)

INDIAN POINT 2 5.0-2 Amendment 268

Programs 5.0 5.0 PROGRAMS (continued) 5.4 Radiation Protection Program 5.4.1 The radiation protection program shall appropriately address STC loading and unloading conditions, including transfer of the loaded TRANSFER CASK outside of facilities governed by 10 CFR Part 50. The radiation protection program shall include appropriate controls for direct radiation and contamination, ensuring compliance with applicable regulations, and implementing actions to maintain personnel occupational exposures As Low As Reasonably Achievable (ALARA).

The actions and criteria to be included in the program are provided below.

5.4.2 Total (neutron plus gamma) measured dose rates shall not exceed the following:

a. 1400 mrem/hr on the top of the STC (with lid in place).
b. 5 mrem/hr on the side of the TRANSFER CASK 5.4.3 The STC and TRANSFER CASK surface neutron and gamma dose rates shall be measured as described in Section 5.4.6 for comparison against the limits established in Section 5.4.2.

5.4.4 If the measured surface dose rates exceed the limits established in Section 5.4.2, then:

a. Administratively verify that the correct contents were loaded in the correct fuel basket cell locations.
b. Perform a written evaluation to determine whether TRANSFER OPERATIONS can proceed without exceeding the dose limits of 10 CFR 72.104 or 10 CFR 20.1301.

5.4.5 If the verification and evaluation performed pursuant to Section 5.4.4 show that the fuel is loaded correctly and the dose rates from the STC and TRANSFER CASK will not cause the dose limits of 10 CFR 72.104 or 10 CFR 20.1301 to be exceeded, TRANSFER OPERATIONS may occur. Otherwise, TRANSFER OPERATIONS shall not occur until appropriate corrective action is taken to ensure the dose limits are not exceeded.

5.4.6 STC and TRANSFER CASK surface dose rates shall be measured at approximately the following locations:

a. The dose rate measurement shall be taken at the approximate center of the STC top lid. Two (2) additional measurements shall be taken on the STC lid approximately 180 degrees apart and 12 to 18 inches from the center of the lid, avoiding the areas around the inlet and outlet ports. The measurements must be taken when the STC is in the HI-TRAC after the steam space is established and prior to HI-TRAC lid installation.

(continued)

INDIAN POINT 2 5.0-3 Amendment 268

Programs 5.0 5.0 PROGRAMS (continued)

b. A minimum of four (4) dose rate measurements shall be taken on the side of the TRANSFER CASK approximately at the cask mid-height plane. The measurement locations shall be approximately 90 degrees apart around the circumference of the cask. Dose rates shall be measured between the radial ribs of the water jacket.

INDIAN POINT 2 5.0-4 Amendment 268

HDI-IPEC-22-057 Enclosure - Attachment 2 Retyped FL and PDTS Pages (12 Pages)

(3) HDI pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess and use, at any time any byproduct, source and special nuclear material as sealed neutron sources that were used for reactor startup, sealed sources that were used for reactor instrumentation and are used in the calibration of radiation monitoring equipment, and that were used as fission detectors in amounts as required.

(4) HDI pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components.

(5) HDI pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials that were produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect.

and is subject to the additional conditions specified or incorporated below:

(1) Deleted per Amendment No. 294.

(2) Technical Specifications The Technical Specifications contained in Appendices A, and B, as revised through Amendment No. XXX, are hereby incorporated in the renewed license. HDI shall maintain the facility in accordance with the Technical Specifications.

(3) Deleted per Amendment No. 294.

Amendment No. XXX

(c) Actions to minimize release to include consideration of:

1. Water spray scrubbing
2. Dose to onsite responders O. Deleted per Amendment No. 294.

P. HDI is authorized to transfer IP3 spent fuel into NRC approved storage casks for onsite storage by HDI and Holtec Indian Point 3, LLC.

Q. License Renewal License Conditions (1) The information in the UFSAR supplement, submitted pursuant to 10 CFR 54.21(d) and as revised during the license renewal application review process, and licensee commitments as listed in Appendix A of the Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Units 2 and 3, (SER) and supplements to the SER, are collectively the License Renewal UFSAR Supplement. The UFSAR Supplement is henceforth part of the UFSAR, which will be updated in accordance with 10 CFR 50.71(e). As such, the licensee may make changes to the programs, activities, and commitments described in the UFSAR Supplement, provided the licensee evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59, Changes, Tests, and Experiments, and otherwise complies with the requirements in that section.

(2) The License Renewal UFSAR Supplement, as defined in license condition Q(1) above, describes certain programs to be implemented and activities to be completed prior to the period of extended operation (PEO).

a. The licensee shall implement those new programs and enhancements to existing programs no later than the date specified in the License Renewal UFSAR Supplement.
b. The licensee shall complete those activities no later than the date specified in the License Renewal UFSAR Supplement.
c. The licensee shall notify the NRC in writing within 30 days after having accomplished item (2)a above and include the status of those activities that have been or remain to be completed in item (2)b above.
3. Deleted (a) Deleted (b) Provisional Trust:

(i) The provisional trust agreement must be in a form acceptable to the NRC.

(ii) Investments in the securities or other obligations of Holtec International or its affiliates, subsidiaries, successors, or assigns are and shall be prohibited.

Except for investments tied to market indexes or other non-nuclear-sector mutual funds, investments in any entity owning one or more nuclear power plants are and shall be prohibited.

Amendment No. XXX

(iii) The provisional trust agreement must provide that no disbursements or payments from the trust, other than for ordinary administrative expenses, shall be made by the trustee unless the trustee has first given the Director of the Office of Nuclear Reactor Regulation 30 days prior written notice of payment. The provisional trust agreement shall further contain a provision that no disbursements or payments from the trust shall be made if the trustee receives prior written notice of objection from the NRC.

(iv) The provisional trust agreement must provide that the agreement cannot be amended in any material respect, or terminated, without 30 days prior written notification to the Director of the Office of Nuclear Reactor Regulation.

(v) The appropriate section of the provisional trust agreement shall state that the trustee, investment advisor, or anyone else directing the investments made in the trust shall adhere to a "prudent investor" standard, as specified in 18 CFR 35.32(a)(3) of the Federal Energy Regulatory Commissions regulations.

(vi) Use of assets in the provisional trust, in the first instance, shall be limited to the expenses related to decommissioning IP2 or IP1 as defined by the NRC in its regulations and issuances, and as provided in this license and any amendments thereto.

(c) Deleted

4. Deleted
5. Deleted
6. This renewed license is effective as of the date of issuance, and until the Commission notifies the licensee in writing that the license is terminated.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Ho K. Nieh, Director Office of Nuclear Reactor Regulation Attachments:

Appendix A - Permanently Defueled Technical Specifications Appendix B - Environmental Technical Specification Requirements Date of Issuance: September 17, 2018 Amendment No. XXX

APPENDIX A TO FACILITY LICENSE DPR-26 FOR HOLTEC NUCLEAR INDIAN POINT 2, LLC AND HOLTEC DECOMMSSIONING INTERNATIONAL, LLC INDIAN POINT NUCLEAR GENERATING PLANT UNIT NO. 2 DOCKET NO. 50-247 PERMANENTLY DEFUELED TECHNICAL SPECIFICATIONS AND BASES Amendment No. XXX

FACILITY LICENSE No. DPR-26 Appendix A - Permanently Defueled Technical Specifications Table of Contents 1.0 USE AND APPLICATION 1.1 Definitions 1.2 Logical Connectors 1.3 Completion Times 1.4 Frequency 2.0 DELETED 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY SURVEILLANCE REQUIREMENT (SR) APPLICABILITY 3.7 SPENT FUEL PIT REQUIREMENTS 3.7.11 Spent Fuel Pit Water Level 3.7.12 Spent Fuel Pit Boron Concentration 3.7.13 Spent Fuel Pit Storage 4.0 DESIGN FEATURES 4.1 Site Location 4.2 Deleted 4.3 Fuel Storage ADMINISTRATIVE CONTROLS 5.0 5.1 Responsibility 5.2 Organization 5.2.1 Onsite and Offsite Organizations 5.3 Facility Staff Qualifications 5.4 Procedures 5.5 Programs And Manuals 5.5.1 Offsite Dose Calculation Manual (ODCM) 5.5.2 Deleted 5.5.3 Radioactive Effluent Controls Program 5.5.4 Deleted 5.5.5 Deleted 5.5.6 Deleted 5.5.7 Deleted 5.5.8 Deleted 5.5.9 Deleted 5.5.10 Explosive Gas and Storage Tank Radioactivity Monitoring Program 5.5.11 Deleted 5.5.12 Technical Specification (TS) Bases Control Program 5.5.13 Deleted 5.5.14 Deleted 5.5.15 Deleted Indian Point 2 i Amendment No. XXX

1.0 USE AND APPLICATION 1.1 Definitions


NOTE-----------------------------------------------------------

The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.

Term Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.

Indian Point 2 1.1 - 1 Amendment No. XXX

4.0 DESIGN FEATURES 4.1 Site Location Indian Point 2 is located on the East bank of the Hudson River at Indian Point, Village of Buchanan, in upper Westchester County, New York. The site is approximately 24 miles north of the New York City boundary line. The nearest city is Peekskill which is 2.5 miles northeast of Indian Point.

The minimum distance from the reactor center line to the boundary of the site exclusion area and the outer boundary of the low population zone, as defined in 10 CFR 100.3, is 520 meters and 1100 meters, respectively. For the purpose of satisfying 10 CFR Part 20, the Restricted Area is the same as the Exclusion Area shown in the Defueled Safety Analysis Report (DSAR), Figure 2.2-2.

4.2 Deleted 4.3 Fuel Storage Spent fuel shall not be stored in the Spent Fuel Pit.

INDIAN POINT 2 4.0-1 Amendment No. XXX

INDIAN POINT 2 5.2-1 Amendment No. XXX 5.0 ADMINISTRATIVE CONTROLS 5.1 Responsibility 5.1.1 The plant manager shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.

The plant manager or his designee shall approve, prior to implementation, each proposed test, experiment or modification to systems or equipment that affect nuclear safety.

INDIAN POINT 2 5.2-1 Amendment No. XXX

5.0 ADMINISTRATIVE CONTROLS 5.2 Organization 5.2.1 Onsite and Offsite Organizations Onsite and offsite organizations shall be established for facility staff and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting safety of the nuclear fuel.

a. Lines of authority, responsibility, and communication shall be defined and established throughout highest management levels, intermediate levels, and all decommissioning organization positions. These relationships shall be documented and updated, as appropriate, in organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements including the facility-specific titles of those personnel fulfilling the responsibilities of the positions delineated in these Technical Specifications shall be documented in the DSAR,
b. The plant manager shall be responsible for overall safe maintenance of the facility and shall have control over those onsite activities necessary for storage and maintenance of nuclear fuel.
c. The corporate officer with direct responsibility for IP2 shall have corporate responsibility for the safe storage and handling of nuclear fuel and shall take any measures needed to ensure acceptable performance of the staff in maintaining and providing technical support to the facility to ensure safe management of nuclear fuel, and
d. The individuals who train the individuals that carry out health physics, or perform quality assurance functions may report to the appropriate onsite manager; however, these individuals shall have sufficient organizational freedom to ensure their ability to perform their assigned functions.

INDIAN POINT 2 5.2-1 Amendment No. XXX

Responsibility 5.1 5.0 ADMINISTRATIVE CONTROLS 5.1 Responsibility 5.1.1 The plant manager shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.

The plant manager or his designee shall approve, prior to implementation, each proposed test, experiment or modification to systems or equipment that affect nuclear safety.

INDIAN POINT 2 5.1 - 1 Amendment No. XXX

5.0 ADMINISTRATIVE CONTROLS 5.3 Facility Staff Qualifications 5.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI/ANS 3.1-1978 for comparable positions with exceptions specified in the IPEC Quality Assurance Program Manual (QAPM).

INDIAN POINT 2 5.3 - 1 Amendment No. XXX

High Radiation Area 5.7 5.7 High Radiation Area 5.7.1 High Radiation Areas with Dose Rates Not Exceeding 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation (continued)

4. A self-reading dosimeter (e.g., pocket ionization chamber or electronic dosimeter) and, (i) Be under the surveillance, as specified in the RWP or equivalent, while in the area, of an individual qualified in radiation protection procedures, equipped with a radiation monitoring device that continuously displays radiation dose rates in the area; who is responsible for controlling personnel exposure within the area, or (ii) Be under the surveillance as specified in the RWP or equivalent, while in the area, by means of closed circuit television, of personnel qualified in radiation protection procedures, responsible for controlling personnel radiation exposure in the area, and with the means to communicate with individuals in the area who are covered by such surveillance.
e. Except for individuals qualified in radiation protection procedures, or personnel continuously escorted by such individuals, entry into such areas shall be made only after dose rates in the area have been determined and entry personnel are knowledgeable of them. These continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to initial entry.

5.7.2 High Radiation Areas with Dose Rates Greater than 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation, but less than 500 rads/hour at 1 Meter from the Radiation Source or from any Surface Penetrated by the Radiation

a. Each entryway to such an area shall be conspicuously posted as a high radiation area and shall be provided with a locked or continuously guarded door or gate that prevents unauthorized entry, and, in addition:
1. All such door and gate keys shall be maintained under the administrative control of the IP3 shift manager, radiation protection manager, or his or her designee.
2. Doors and gates shall remain locked except during periods of personnel or equipment entry or exit.

INDIAN POINT 2 5.7-1 Amendment No. 250