New York State Alyse Peterson Comments on Completion of Emergency Planning Nd License Amendment Request Prior to Spent Fuel Transfer from Spent Fuel Pools to Casts (Dockets50-003, 50-247, 50-286)
ML22332A048
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/22/2022
From: Peterson A
State of NY, Energy Research & Development Authority
To: Sturzebecher K
Office of Nuclear Material Safety and Safeguards
References
Download: ML22332A048 (1)


Text

November 22, 2022 Karl Sturzebecher Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Material Safety and Safeguards Reactor Decommissioning Branch Mail Stop: T-5A10 Rockville, MD 20852

Subject:

Emergency Planning Exemption Request and License Amendment Request for the Indian Point Site

Dear Mr. Sturzebecher:

The State of New York opposes reduction of emergency planning requirements before all spent fuel at the Indian Point site is removed from the spent fuel pools and placed in dry cask storage. On December 22, 2021, Holtec Decommissioning International, LLC (HDI) submitted two requests related to emergency preparedness for Indian Point Nuclear Generating Units 1, 2, and 3 (Indian Point): a request for exemptions from certain emergency planning requirements and a license amendment request (LAR) to revise the Permanently Defueled Emergency Plan (PDEP) and Permanently Defueled Emergency Action Level (EAL) scheme. New York State has reviewed the request documents, specifically:

  • License Amendment Request for Permanently Defueled Emergency Plan (PDEP) and Emergency Action Level Scheme o Initial Request dated December 22, 2022 (ML21356B704) o Revision dated February 4, 2022 (ML22035A121)

2 The requests seek reductions in emergency preparedness requirements reflective of those presented in NRCs proposed rulemaking proceeding entitled Regulatory Improvements for Production and Utilization Facilities Transitioning to Decommissioning (NRC-2015-0700). (That rulemaking proceeding is not expected to be final for another year.) New York State previously submitted comments in response to various stages of that rulemaking. We incorporate and reassert those by reference here. See comments of:

(ML22257A195);

The State of New York opposes reduction of emergency planning requirements before all spent fuel at the site is removed from the spent fuel pools and placed in dry cask storage. At Indian Point, that is currently scheduled to occur in approximately November 2023just ten months following NRCs anticipated decision on the exemption request and LAR.

Holtec acknowledges in its exemption request that the risk of credible accidents will still exist during this time period. In Enclosure HDI-IPEC-21-015 (pp. 2), Holtec states that the spectrum of credible accidents is much smaller and that the majority of the design basis accident (DBA) scenarios previously postulated in the safety analyses for the plant are no longer possible (emphasis added). But Holtec does not state that the risk is zero.

It is this continuing non-zero risk with which the State expresses concern. The Indian Point site is unlike any other commercial nuclear site in the county, and no site-specific analysis of a potential severe spent fuel pool accidents impacts has ever been conducted by NRC. With mere months remaining before all waste is scheduled to be out of the pools, passing any such level of risk on to neighboring communities is without justification and contrary to the public interest.

3 CHARACTERISTICS OF THE INDIAN POINT SITE A. Population Indian Points fifty-mile radius is densely populated and contains some of the most expensive real estate in the country, along with landmarks, parks, arenas, universities, and transportation facilities. The Indian Point power reactors, spent fuel pools, and dry storage casks are 24 miles north of New York City, 35 miles from Times Square, and approximately 38 miles from Wall Street. The U.S. Census Bureau recognizes that New York City is the largest city in the nationwith more than 8,000,000 residents.

Additionally, Indian Points facilities are approximately 3 miles southwest of Peekskill, with a population of 22,441; 5 miles northeast of Haverstraw, with a population of 33,811; 16 miles southeast of Newburgh, with a population of 31,400; and 17 miles northwest of White Plains, with a population of 52,802; 23 miles northwest of Greenwich, Connecticut; 37 miles west of Bridgeport, Connecticut; and 37-39 miles northeast of Jersey City and Newark, New Jersey.

With approximately 17 million people currently living within 50 miles of Indian Point, no other operating reactor site in the country comes close to Indian Point in terms of surrounding population. According to NRC:

NUREG-1437 (1996) at p. 2-2. NRC should not overlook the common-sense point that a credible accident affecting a hyper-urbanized area with 2,000 people per square mile plainly will have greater public health and

4 other consequences than a comparable accident affecting a rural area with only 300 or 800 people per square mile.

B. Drinking Water Resources Indian Points spent fuel pools are also 6 miles west of the New Croton Reservoir in Westchester County, which is part of the New York City reservoir system and provides drinking water to New York City residents. The pools are also in close proximity to other critical reservoirs in the New York metropolitan area:

5 A credible accident at Indian Point may accordingly threaten drinking water resources for millions of New York City residents.

C. Topography and Meteorology The Indian Point facilities were constructed close to the riverbank and are located at a relatively low point in the valley formed by the Hudson River. The hills of the Hudson River Valley in the vicinity of the Indian Point facilities are illustrated in the following two topographical maps.

The first map depicts the area within five miles of the facilities:

6 The following hillshade map depicts the lower Hudson River Valley in the vicinity of the Indian Point site:

7 This topography tends to concentrate wind direction to the south (toward the New York City metropolitan area) or to the north toward the U.S. Military Academy at West Point and other Hudson River cities and towns.

The following wind rose, prepared by Indian Points former owner, illustrates the dominant wind direction.

Plot of Weather for Years 1999 - 2002 from the site 10-meter tower showing wind direction (percent by direction) (ML093020492)

8 And the following population rose depicts the relative population densities in the various sectors around Indian Point. 1 1 Source: Site Specific MACCS2 Input Data for Indian Point Energy Center, Rev. 1, (December 1, 2009), Enercon Services, Inc. Prepared for Entergy Nuclear Northeast, at 2-7. As noted, winds blow from the Indian Point facilities southwardtoward the New York City metropolitan area.

9 Accordingly, there is reason to believe that Indian Points prevailing topographical and meteorological characteristics would direct the impacts of any accident at the site toward some of the States (and the countrys) most densely populated areas.

D. The Hudson River Ecosystem The Indian Point facilities are located on the eastern bank of the Hudson River at river mile 43. The Indigenous name for the river, Mahicantuck, means great waters in constant motion or river that flows two ways. This name highlights the fact that this waterway is more than a riverit is a tidal estuary. The Hudson River is an important regional resource of significant aesthetic value in addition to providing transportation, recreation, and water supply. More than 200 species of fish are found in the Hudson and its tributaries. Bald eagles, herons, waterfowl, and other birds feed from the rivers bounty. Tidal marshes, mudflats, and other significant habitats in and along the estuary support a diversity of life. Tidal freshwater wetlands near Indian Point support this life web. The Hudson River is one of the nations fourteen American Heritage Rivers. A credible accident at the Indian Point site, however, could cause potentially irreparable harm to this vital natural resource.

E. Seismic Hazards Indian Point is susceptible to earthquake damage since it was initially designed to withstand an earthquake and ground acceleration that are now deemed to be below the reasonably predictable earthquake and ground acceleration for the site and its environs.2 In 2008, the Bulletin of the Seismological Society of America 2 See generally, Declaration of Lynn R. Sykes, Ph.D., and Declaration of Leonardo Seeber and accompanying Exhibits, (Nov. 2007) (ML073400205) (Volume I of II); Letter from Attorney General Schneiderman to NRC Commissioners, Seismic Risk at Indian Point Nuclear Generating Station, (March 18, 2011) (ML110820058); see also Comments Concerning the Proposed Generic Communication Draft NRC Generic Letter 2011-XX: Seismic Risk Evaluations for Operating Reactors, Docket ID NRC-2011-0202, at 14-19 (Dec. 15, 2011) (ML11354A231).

10 published a peer-reviewed identifying a new seismic feature in the vicinity of Indian Point.3 The article concluded:

There is now substantial evidence that there is earthquake risk that NRC did not take into consideration when approving operating licenses for existing reactors and spent fuel storage facilities. In 2004, the United States Geological Survey (USGS) told NRC that earthquake hazards in the Central and Eastern United States (CEUS),

the portion of the lower 48 states east of the Rocky Mountains, were higher than previously understood. In May 2005, NRC staff acknowledged that earthquake risk for reactors and spent fuel storage in CEUS may be greater than NRC assumed when it approved operating licenses for these facilities.4 In 2014, Entergy provided an updated seismic hazard analysis for IP2 and IP3. That analysis shows that the anticipated ground motion is larger for higher frequency events than was understood when the two units received their operating licenses. After receiving the Entergy updated analysis, NRC Staff performed its own 3 Observations and Tectonic Setting of Historic and Instrumentally Located Earthquakes in the Greater New York City-Philadelphia Area, BULLETIN OF THE SEISMOLOGICAL SOCIETY OF AMERICA, Vol. 98:1696-1719 (Aug.

2008).

4 See, e.g., May 26, 2005 NRC Staff memorandum re: Identification of a Generic Seismic Issue (ML051450456).

11 analysis. The resulting ground motion curves appear to be higher than the Safe Shutdown Earthquake (or SSE) design curves that resulted from licensing hearings in the 1970s and were adopted by the Commission at that time.5 5 See NRC Staff, Slides, Near-Term Task Force Recommendation 2.1: Entergy, at 6 (June 19, 2014)

(ML14169A489).

12 The revised seismic curves reflect a significantly greater seismic risk for certain systems, structures, and components at both units when compared to their original safe shutdown earthquakes.

LACK OF SITE-SPECIFIC ANALYSIS OF SPENT FUEL POOL ACCIDENT AT INDIAN POINT The current exemption request, if approved, would effectuate a change to generally applicable NRC regulations as implemented at the Indian Point site in Buchanan, New York, and the surrounding Emergency Planning Zone. As such it would constitute a change to the Indian Point facilities current licensing basis, their operating licenses, and hence the regulatory baseline or status quo.6 Before engaging in such a site-specific regulatory change and site-specific amendment to federal regulations, the National Environmental Policy Act (NEPA) requires NRC to examine the site-specific environmental impacts of the proposed change. Such a review must also include a site-specific analysis of a severe spent pool accident at Indian Point and its impact on the sites Emergency Planning Zone and the New York City metropolitan area. No such review has ever been conducted for the Indian Point site.

When the Atomic Energy Commission (AEC) authorized the Consolidated Edison Company to construct the first nuclear power reactor at the Indian Point site, the federal government did not have siting regulations or restrictions for nuclear reactors to address site-specific issues such as nearby hazards, seismicity, sabotage, and population risks. Given this regulatory history, the Indian Point spent fuel pools and their dense inventory of spent nuclear fuel were not subjected to a severe accident mitigation alternatives analysis when AEC and NRC issued the construction permits and operating licenses for those facilities.

Spent nuclear fuel, one of the most dangerous and long-lasting substances known to humans, was never meant to be stored long-term and densely packed in pools at nuclear plants. When many of these facilities were built, AEC and NRC told the public that the spent fuel would be stored temporarily in pools only for a 6 10 C.F.R. §54.3(a). The current licensing basis is the set of NRC requirements applicable to a specific plant.

Id. The current licensing basis for Indian Point, which is in place and applicable today, includes the regulations that are the focus of the proposed exemption request. The NRC promulgated those regulations through a formal notice and comment rulemaking proceeding pursuant to the Administrative Procedure Act.

13 brief time before being promptly removed from the host communities. Contrary to those assurances, spent nuclear fuel has remained in densely packed spent fuel pools for decades.

When the federal government first licensed the operation of Indian Point Unit 2 and Indian Point Unit 3 it authorized each units single spent fuel pool to hold 241 spent fuel assemblies. NRC subsequently authorized the pools to hold five times the original limit.

If NRC wishes to exempt Indian Point from NRC regulations and the current licensing basis while spent fuel remains in the pools, it must conduct a site-specific review of the potential environmental impacts of such a change. All of the unique and outlier characteristics of the Indian Point site discussed above demonstrate why it is essential that a site-specific analysis of the potential environmental impacts from the storage of spent fuel at the Indian Point facilities and measures to mitigate those potential impacts must be addressed.

Once NRC recognizes the potential significant environmental impacts that spent fuel storage may have at Indian Point and surrounding host communities, there are a wide array of mitigation measures and alternatives that it is obligated to consider as part of the NEPA review. First, NRC is obligated to assure that:

the Commission has taken all practicable measures within its jurisdiction to avoid or minimize environmental harm from the alternative selected, and if not, to explain why those measures were not adopted.

10 C.F.R. § 51.103(a)(4). One such mitigation measure is to retain in place the currently applicable emergency planning regulations until all spent fuel is removed from the Indian Point Unit 3 spent fuel pool (the last pool to be emptied).

Second, where, as here, no legally sufficient prior analysis of spent fuel pool severe accident mitigation alternatives has been completed, NRC is obligated to assure that such an analysis has occurred, and that all reasonable severe accident scenarios and mitigation measures have been evaluated. The State further urges NRC to ensure that the severe accident mitigation alternatives analyses rely on site-specific cost estimates (i.e.,

inputs based on costs for the Indian Point site and its unique 50-mile EPZand not the inputs generated at the rural Surrey, Virginia, site).

NEPA further requires NRC to review the impacts and the mitigation measures before, not after, NRC takes a regulatory action. NEPA requires NRC to evaluate, to the fullest extent possible, the environmental impacts of

14 the proposed action and alternatives to mitigate those impacts at the earliest stagebefore commitment of resources and other actions narrow the scope and viability of alternatives. As the U.S. Court of Appeals for the District of Columbia observed in a case where the Atomic Energy Commission sought to avoid or defer a NEPA environmental impact review:

By refusing to consider requirement of alterations until construction is completed, the Commission may effectively foreclose the environmental protection desired by Congress. It may also foreclose rigorous consideration of environmental factors at the eventual operating license proceedings. If irreversible and irretrievable commitment[s] of resources have already been made, the license hearing (and any public intervention therein) may become a hollow exercise.

Calvert Cliffs Coordinating Comm. v. Atomic Energy Commn, 449 F.2d 1109, 1128 (D.C. Cir. 1971); accord NRDC

v. United States NRC, 539 F.2d 824 (2d Cir. 1976), vacated sub nom. as moot, Allied-General Nuclear Servs. v.

NRDC, 434 U.S. 1030 (1978):

Although an EIS may be supplemented, the critical agency decision must, of course, be made after the supplement has been circulated, considered and discussed in the light of the alternatives, not before. Otherwise, the process becomes a useless ritual, defeating the purpose of NEPA, and rather making a mockery of it. (Natural Resources Defense Council, Inc. v.

Callaway, supra, 524 F.2d at 92.)

NRDC, 539 F.2d at 845.

To comply with NEPA, NRCs environmental impact and regulatory analysis should acknowledge and include, for example, the impact of severe spent fuel pool accidents on drinking water resources within NRCs designated 50-mile Emergency Planning Zone around the Indian Point facilities. To date, NRCs analysis has not included an acknowledgment and analysis of the cost to replace these drinking water resources, which play a critical role in the daily life of New York Citys residents. Replacing radionuclide-contaminated drinking water resources for millions of City residents would likely represent a substantial cost, and this is by no means the only impact for which NEPA requires an analysis.

Conclusion Finally, because site owners have strong incentives to minimize fund expenditures where possible, NRC must closely scrutinize this type of request and strike an appropriate balance between licensee convenience and the

15 publics interests. In this case, investing in emergency preparedness for the final 10 months until all spent fuel is in dry cask storage is well worth the modest expense. Moreover, a high number of recent safety violations at Holtecs Oyster Creek facility raise questions about whether this facility and this owner in particular warrant this exemption; while similar exemptions have been granted at other facilities, it is not clear that this workforce is as experienced as that of other nationwide facilities not operating under this contract-worker business model.7 Holtec recently detailed each of these violations in a letter to the Indian Point Decommissioning Board; a copy of that letter is attached and incorporated herein.

Additionally, we submit that an exemption of this kind is inappropriate because this very issue is the subject of NRC rulemaking and one NRC Commissioner has noted that radiological risks remain at shutdown nuclear power plants that must be taken seriously and the revised draft proposed rule should postpone the Level 2 emergency preparedness reductions until all spent fuel at a site is transferred to dry cask storage. See SECY-18-0055, Proposed Rule: Regulatory Improvements for Production and Utilization Facilities Transitioning to Decommissioning (RIN 3150-AJ59) Notation Vote at 2 (ML21230A313).

Finally, we request that NRC conduct a public statement hearing regarding HDIs two requests related to emergency preparedness to garner additional public input prior to any recommendations or determinations being rendered by NRC staff or the Commission.

We appreciate the continued opportunity to provide input on facility licensing actions and other initiatives through NRCs State Consultation and State Liaison Officer programs. If you have any questions, please contact me.

Sincerely, Alyse Peterson, P.E.

Senior Advisor 7 See Douglas Macmillan, The dangerous business of decommissioning Americas nuclear plants - The Washington Post (May 13, 2022).

16 Attachment cc: Doug Tifft, NRC (w/attachment) chairman.resource@nrc.gov

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-IPEC-22-041 May 3, 2022 Mr.Thomas Congdon Chairman, Decommissioning Oversight Board NYS Department of Public Service 3 Empire State Plaza, Albany, NY 12223

Subject:

Holtecs Response to NYS Department of Public Service (DPS) Letter dated March 8, 2022

References:

1) NYS Department of Public Service (PSC) Thomas Congdon letter dated March 8, 2022 to Richard Burroni, Site Vice President - Indian Point, Holtec Decommissioning International, LLC

Dear Mr. Congdon:

Holtec Decommissioning International, LLC (HDI) is submitting the enclosed response to your letter on behalf of the Indian Point Decommissioning Oversight Board dated March 8, 2022. As requested, the response addresses Holtecs learnings from previous US Nuclear Regulatory Commission violations at other Holtec sites outside of New York.

If there are any questions regarding the enclosed responses or should you wish to discuss further, please do not hesitate to contact Walter Wittich at 914-254-7212 or myself at (856) 797-0900, ext. 3578.

Sincerely, Jean A. Fleming Vice President, Licensing, Regulatory Affairs and PSA Holtec Decommissioning International, LLC

Enclosure:

Response to NYS Department of Public Service (DPS) Letter dated March 8, 2022 cc: New York State Liaison Officer Designee, NYSERDA SIGN

Attachment to HDI-IPEC-22-041 Page 1 of 2 Response to NYS Department of Public Service (DPS) Letter dated March 8, 2022.

General Statement Holtec International has an NRC approved Quality Assurance (QA) program that meets the highest quality standards. This program ensures that engineering, design, and manufacturing work is done in accordance with requirements. If an issue is identified, the QA program also provides the path to resolving that issue and putting corrective actions in place to avoid a recurrence. So for each of the citations listed in the DPS letter, Holtec has performed a thorough evaluation and taken corrective actions to prevent similar citations. As necessary those corrective actions have been proceduralized and are carried forward to all future work (including that at IPEC).

A discussion of each of the citations is provided below:

10/28/2021: Three violations issued for unapproved changes to HI-STORM cask designs impacting water removal from the loaded canister for regular and high-burnup fuel.

While none of the violations listed in the referenced document relate to water removal from canisters, we will take the opportunity to address the items listed in the referenced inspection report. All of the three items listed were specific to a version of the HI-TRAC (100G), version of the HI-STORM 100 with a Girdle Beam Structure (GBS), and HI-STORM FW Version E which are not used at IPEC. However, for completeness Holtec evaluated its change control process and made changes to training material to ensure that these problems do not reoccur. In addition, the writers guide instructions for evaluations under 10CFR72.48 was revised to capture these lessons learned and prevent recurrence.

08/16/2019: Violation for improper evaluation and acceptance of gouges in the surfaces of fuel storage canisters at the San Onofre nuclear plant.

This citation was specific to the design of the HI-STORM Underground Maximum Capacity (UMAX) canister storage system, which is not used at the IPEC site.

11/29/2018: Three violations issued for (1) unapproved shim pin changes found during a receipt inspection of dry casks at the San Onofre nuclear plant; (2) unapproved modification to the HI-TRAC VW transfer cask design; and (3) unapproved reduction in the number of lift cleat studs on a multi-purpose canister at the Pilgrim nuclear plant in January 2015.

Item 3 was a site-specific issue, and the impacted cask has already been repaired and is safely stored. Additionally, the lift cleat stud thread design was updated to minimize the risk of re-occurrence. For items 1 and 2, these were related to design changes that the NRC determined should have been submitted as license amendment requests prior to implementation. It is important to note that the NRC never indicated that these modifications were unsafe or unlikely to be approved, but were implemented prior to the approval. In fact, both changes were submitted to the NRC subsequently and have been fully approved and are now acceptable for loading. However, as a result of these citations, especially the one outlined as item 1, Holtec implemented a number of enhancements to its design program. These enhancements included increased levels of oversight and improved manufacturability reviews to prevent occurrence of a similar issue.

Attachment to HDI-IPEC-22-041 Page 2 of 2

02/24/2011: Violation issued for an unacceptable evaluation of spent fuel rod integrity following a design basis accident drop of a loaded cask.

This citation related to an FSAR analysis of spent fuel rod integrity in the event of a drop, which was updated to use a different methodology. The NRC determined that this new analysis should have required prior approval. This citation was labeled as low significance because the analysis did demonstrate safety of the fuel rods, and no accidents involving drops of the system have occurred. However, to avoid future similar issues, updates to procedures and training were made so that there was a clear understanding across the organization about what is considered a method of evaluation and what changes are allowed without prior NRC approval.

08/05/2009: Violation issued for the unapproved elimination of a leak-tightness check for casks.

This violation occurred because Holtec followed change control processes to update manufacturing procedures related to helium leak tests of the canisters and determined that no NRC approval was needed before implementing a change. However, the NRC disagreed with this determination and stated that NRC approval would have been needed. All the canisters impacted by this change were identified to be safe in their current condition, and to avoid any further confusion, the helium leak test is now a legally specified requirement in the Holtec Certificate of Compliance. Additionally, Holtec implemented improvements in its change review process to ensure that confinement boundary limits were clearly specified, so that similar issues will not arise in the future.

In Summary:

As noted in the opening statement, Holtecs QA Program does meet the highest of quality standards and does ensure that engineering activities, design and manufacturing are performed in accordance with all applicable standards. Relative to the noted violations in this document, in all cases corrective actions were put in place to ensure regulations were met and actions in place to preclude recurrence.

The first three noted violations in this document pertain specifically to different cask versions, designs and a cask storage design that are not used at IPEC. However, the responses to the violations did take into account extent of condition to determine if there was any impact that would pertain to any other cask system that the company manufactures. In this case, specific to IPEC, our Defueling Procedures which were previously used to load 54 casks successfully under Entergy were totally revised based in part on the corrective actions from the violations (and Operating Experience) prior to loading 4 casks in the 4th quarter of 2021 under Holtecs ownership. This is a classical example of a company using its learnings to enhance performance.

In addition, the Regulatory & Licensing Department at Camden headquarters is under new leadership that brings the right level of expertise regarding communication and technical knowledge with the NRC and all other regulatory agencies. This department is further supported by IPEC personnel assigned to the same functional area.

All of this is not to say that there will be zero violations across the fleet as we continue to Defuel, Decontaminate and Dismantle nuclear plants in the future. However, using a fleet concept, the company structure is such that it is a learning organization and will ensure all violations are respectfully answered with the right corrective actions.