Category:Letter
MONTHYEARML23338A2542023-12-14014 December 2023 Letter - Kairos Power LLC - Issuance of Construction Permit for Hermes Test Reactor ML23328A3972023-11-24024 November 2023 Request for Withholding Information from Public Disclosure - Enclosures of the Construction Permit Application for the Kairos Power, LLC Hermes Non-Power Reactor Facility ML23328A3982023-11-24024 November 2023 Request for Withholding Information from Public Disclosure Kairos Power LLC Postulated Event Analysis Methodology Technical Report, Kp TR 018 P ML23317A1672023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Response to NRC Question on Salt Spills from Chapters 4 and 13 on Hermes Preliminary Safety Analysis Report ML23317A4202023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Response to NRC Question on Decay Heat Removal Testing from Audit on Hermes PSAR Section 6.3 ML23317A4212023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Response to NRC Request for Additional Information 350 on Hermes Preliminary Safety Analysis Report ML23317A4232023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Response to NRC Question on Fluidic Diode Testing and PSAR Chapter 4 Changes ML23321A2442023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Changes to Hermes Construction Permit Application Financial Information ML23313A1232023-11-16016 November 2023 Request from Withholding Information from Public Disclosure - Enclosures of the Construction Permit Application for the Kairos Power LLC Non-Power Reactor Facility ML23313A1972023-11-16016 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Changes to KP-FHR Core Design and Analysis Methodology Technical Report KP-TR-017-P ML23313A2072023-11-16016 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Changes to KP-FHR Core Design and Analysis Methodology Technical Report KP-TR-017-P ML23268A0092023-11-0303 November 2023 Kairos Power, LLC - Approval of Kairos Power Safeguards Information Protection Plan ML23310A0742023-11-0202 November 2023 Letter to THC NHPA Section 106 Consultation Summary for the Hermes CP Review Redacted ML23304A2502023-10-25025 October 2023 NHPA Section 106 Consultation Summary for the Kairos Hermes CP Review - Redacted ML23268A3272023-09-25025 September 2023 Letter from EPA Regarding Kairos Hermes CP Feis ML23230A7092023-08-21021 August 2023 Ltr to Alabama-Quassarte Tribal Town, Notification of Issuance of the Feis for the Construction Permit ML23195A0762023-08-17017 August 2023 Issuance of the Final Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor ML23199A0062023-08-17017 August 2023 Letter to USFW Mary Jennings Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23199A0132023-08-17017 August 2023 Letter to NPS Niki S. Nicholas Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23199A0292023-08-17017 August 2023 Letter to Achp Blythe Semmer Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23199A0352023-08-17017 August 2023 Letter to THC E. Patrick Mcintyre Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23201A1372023-08-17017 August 2023 Letter to Absentee Shawnee Tribe, Notification of Issuance of the Final Environmental Impact Statement for the Construction Permit ML23214A1382023-08-17017 August 2023 Ltr to Alabama-Coushatta Tribe of Texas, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tennessee ML23214A1402023-08-17017 August 2023 Ltr to Cherokee Nation, Notification of Issuance of Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1412023-08-17017 August 2023 Letter to Coushatta Tribe of Louisiana, Notification of Issuance of the Final Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1422023-08-17017 August 2023 Ltr to Eastern Band of Cherokee Indians, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1492023-08-17017 August 2023 Ltr to Eastern Shawnee Tribe of Oklahoma, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1502023-08-17017 August 2023 Ltr to Jena Band of Choctaw Indians, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1512023-08-17017 August 2023 Ltr to Kialegee Tribal Town, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1532023-08-17017 August 2023 Ltr to Muscogee Creek Nation, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1592023-08-17017 August 2023 Ltr to Poarch Band of Creek Indians, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1602023-08-17017 August 2023 Ltr to Seminole Nation of Oklahoma, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1612023-08-17017 August 2023 Ltr to Seminole Tribe of Florida, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1622023-08-17017 August 2023 Ltr to Shawnee Tribe, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1632023-08-17017 August 2023 Ltr to Thlopthlocco Tribal Town, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1692023-08-17017 August 2023 Ltr to United Keetoowah Band of Cherokee Indians of Oklahoma, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23195A0152023-08-17017 August 2023 Letter to Environmental Protection Agency, Notification of the Issuance of the Final EIS for the Construction Permit for Kairos Hermes Test Reactor ML23178A0962023-06-23023 June 2023 Kairos Power, LLC - Supplemental Information for Environmental Report ML23158A2662023-06-13013 June 2023 Transmittal of Safety Evaluation for Hermes Construction Permit Application ML23151A7442023-05-31031 May 2023 Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 ML23139A2272023-05-19019 May 2023 Kairos Power LLC, Presentation Materials for the May 22, 2023 Pre?Submittal Meeting on Kairos Power Fuel Qualification Supporting the Hermes Operating License Application ML23117A0482023-04-27027 April 2023 Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards on Hermes Preliminary Safety Analysis Report ML23118A3232023-04-27027 April 2023 Kairos Power LLC, Submittal of Safeguards Information Protection Plan ML23115A3942023-04-25025 April 2023 Kairos Power, LLC - Transmittal of Changes to Preliminary Safety Analysis Report ML23102A2392023-04-11011 April 2023 Kairos Power LLC, Presentation Materials for Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes Preliminary Safety Analysis Report Section 12.9 and Chapter 13 ML23089A3872023-03-30030 March 2023 Kairos Power LLC, Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1 ML23088A0682023-03-28028 March 2023 Kairos Power LLC, Transmitatl of Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Subcommittee on Hermes Preliminary Safety Analysis Report Chapters 5, 7, 8, and 11 ML23076A2182023-03-15015 March 2023 Kairos Power, LLC, Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes Preliminary Safety Analysis Report Chapters 1, 2, 3, 4, 6, and 9 ML23062A7342023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Graphite Material Qualification for the KP-FHR ML23062A7302023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Metallic Material Qualification for the KP-FHR 2023-09-25
[Table view] Category:Preliminary Safety Analysis Report (PSAR)
MONTHYEARML23151A7452023-05-31031 May 2023 Enclosure 1 - Preliminary Safety Analysis Report ML23115A3952023-04-25025 April 2023 Kairos Power, LLC - Enclosure 1, Changes to Hermes PSAR Chapters 2, 3, 4, 7, 8, 9, 13, and 14 ML23034A2142023-02-0303 February 2023 Kairos Power LLC, Changes to Preliminary Safety Analysis Report (Psar), Revision 1, Chapter 2 ML22353A6252022-12-19019 December 2022 Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapter 6 and Response to NRC Question on Dhrs Testing ML22286A2432022-10-13013 October 2022 Kairos Power, LLC - Preliminary Safety Analysis Report ML22285A2292022-10-12012 October 2022 Enclosure 1: Changes to PSAR Chapter 4 ML22284A1562022-10-11011 October 2022 Enclosure 1: Changes to Hermes PSAR Chapters 3, 4, 6, and 14 ML22284A1532022-10-11011 October 2022 Kairos Power LLC, Changes to Preliminary Safety Analysis Report Chapter 13 ML22279B0642022-10-0606 October 2022 Enclosure 1: Changes to Hermes PSAR Chapters 3 and 7 ML22272A5952022-09-29029 September 2022 Enclosure 1: HER-PSAR-001, Preliminary Safety Analysis Report, Rev. 1 ML22263A0352022-09-19019 September 2022 Kairos Power, LLC - Transmittal of Changes to Construction Permit Application - Exemptions Enclosure, PSAR Chapter 1, PSAR Chapter 3, and PSAR Chapter 14S ML22263A0342022-09-19019 September 2022 Enclosure 2 - Changes to PSAR Chapter 15 (Non-Proprietary) ML22259A1412022-09-16016 September 2022 Kairos Power, LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapters 3 and 4 ML22256A3012022-09-13013 September 2022 Enclosure 1: Changes to Hermes PSAR Chapters 3, 4, and 6 ML22250A6802022-09-0707 September 2022 Enclosure 1: Changes to PSAR Chapters 4 and 5 ML22242A1682022-08-30030 August 2022 Kairos Power LLC, Changes to Construction Permit Application - PSAR Chapters 3, 4, 8, and 13 ML22237A3262022-08-25025 August 2022 Kairos Power LLC, Changes to Preliminary Safety Analysis Report Chapters 3, 4, 5, 9 and 14 ML22236A5952022-08-24024 August 2022 Kairos Power, LLC, Preliminary Safety Analysis Report, Chapter 6 ML22231B0302022-08-19019 August 2022 Enclosure 1: Change to Hermes PSAR Chapter 14 ML22230D0532022-08-18018 August 2022 Enclosure 1 - Changes to PSAR Table 4.2-5 ML22230D0492022-08-18018 August 2022 Kairos Power LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapter 4.2 ML22252A2592022-08-18018 August 2022 Kairos Power LLC, Changes to Preliminary Safety Analysis Report Table 4.2-5 ML22224A2022022-08-12012 August 2022 Enclosure 2: Changes to Preliminary Safety Analysis Report Chapter 13 ML22210A3192022-07-29029 July 2022 Enclosure 1: Changes to PSAR Chapter 4 and Chapter 6 ML22209A1392022-07-27027 July 2022 Enclosure 1: Change to Hermes PSAR Chapter 5 ML22181B1592022-06-30030 June 2022 Enclosure 1 - Changes to PSAR Chapters 3, 4, and 6 (Non-Proprietary) ML22181B1762022-06-30030 June 2022 Enclosure 1 - Changes to PSAR Chapter 4.2 ML22181B0562022-06-30030 June 2022 Enclosure 1: Changes to PSAR Chapter 7 ML22181B1132022-06-27027 June 2022 Enclosure 1: Changes to PSAR Chapter 3 ML22178A2382022-06-27027 June 2022 Enclosure 1: Changes to PSAR Chapter 9 ML22171A0172022-06-20020 June 2022 Kairos Power, LLC Preliminary Safety Analysis Report ML22167A1922022-06-16016 June 2022 Kairos Power LLC, Changes to Construction Permit Application - PSAR Chapter 14 ML22161B0142022-06-10010 June 2022 Kairos Power LLC, Changes to Preliminary Safety Analysis Report Chapter 7 ML22160A6912022-06-0909 June 2022 Enclosure 1: Changes to PSAR Sections 9.1.1 and 9.1.4 ML22125A2722022-05-0505 May 2022 Enclosure 1: Changes to PSAR Chapter 12 ML22095A2822022-04-0505 April 2022 Enclosure 1: Changes to the PSAR (Non-Proprietary) ML22062B6772022-03-0303 March 2022 Enclosure 1: Changes to PSAR Section 3.1 ML22060A2722022-03-0101 March 2022 Kairos Power, LLC, Transmittal of Changes to Maximum Hypothetical Accident Dose Results in Hermes Construction Permit Application ML22042A0972022-02-10010 February 2022 Kairos Power LLC, Preliminary Safety Analysis Report 2023-05-31
[Table view] |