MONTHYEARML24324A0202024-11-21021 November 2024 Letter - Kairos Power LLC - Issuance of Construction Permits for the Hermes 2 Test Reactor Facility ML24261C0092024-09-16016 September 2024 Kairos Power LLC - Charlotte Office Address ML24158A2322024-08-30030 August 2024 Letter to Kairos, Inc., Exemption and Final EA ML24200A1172024-07-19019 July 2024 Transmittal Letter for the Hermes 2 Safety Evaluation ML24155A0612024-06-0303 June 2024 Kairos Power LLC, Presentation Materials for the Kairos Power Meeting with the Nuclear Regulatory Commission on the Hermes Foundation Design ML24150A2442024-05-29029 May 2024 Kairos Power, LLC - Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report, Chapters 2, 3, 5, 9, and 13 ML24150A2172024-05-28028 May 2024 Kairos Power, LLC - Request for Documents Related to Non-Power Security ML24144A0912024-05-23023 May 2024 Kairos Power, LLC - Submittal of the Hermes 2 Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor, Revision 1, and the Postulated Event Analysis Methodology Technical Report, Revi ML24138A2122024-05-16016 May 2024 Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapters 3, 5, and 13 ML24136A2542024-05-15015 May 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 9 ML24135A3832024-05-14014 May 2024 Kairos Power, LLC - Transmittal of Response to NRC Request for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 ML24131A1262024-05-10010 May 2024 Kairos Power, LLC - Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report Chapters 1, 4, 6-8, 10-12, 14, and 16-18 ML24101A0772024-04-23023 April 2024 Hermes 2 NPS Dea ML24101A0782024-04-23023 April 2024 Hermes 2 SHPO Dea ML24101A0722024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Johnson, J ML24113A1732024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hill, D ML24113A1702024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Bunch, J ML24113A1692024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Bryan, a ML24113A1682024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Barnes, B ML24113A1712024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Cernek, J ML24113A1722024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hicks, M ML24113A1742024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hoskin, Jr., C ML24113A1752024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Johnson, L J ML24113A1762024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Morrow, R K ML24113A1782024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Rogers, L ML24113A1772024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Osceola, Jr. M W ML24113A1792024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Sylestine, R ML24113A1822024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Yargee, W ML24113A1802024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Wallace, G J ML24113A1812024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Yahola, ML24101A2172024-04-19019 April 2024 Letter to Kairos Power, LLC-Notice of Availability of the Draft Environmental Assessment for the Construction Permit for Hermes 2 Test Reactors ML24109A2952024-04-16016 April 2024 Kairos Power, LLC - Slides to Support April 22, 2024, Public Meeting About Hermes Physical Security ML24103A2422024-04-12012 April 2024 Kairos Power, LLC, Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 ML24103A2452024-04-12012 April 2024 Kairos Power, LLC, Transmittal of Changes to Construction Permit Application - Financial Information Enclosure and PSAR Chapter 15 ML24206A0852024-03-20020 March 2024 NPS Section 106 Initiation Response - Hermes 2 ML24073A3182024-03-13013 March 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 13 and KP-TR-022 ML24072A2982024-03-12012 March 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 7 ML24065A1012024-03-0404 March 2024 Kairos Power LLC, Transmittal of Reponses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report ML24039A1902024-02-0808 February 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 ML24032A1872024-02-0202 February 2024 Ltr Hon Chuck Hoskin Jr Principal Chief Cherokee Nation Re Hermes 2 ML24032A2002024-02-0202 February 2024 Ltr Libby Rogers, Principal Chief, Jena Band of Choctaw Indians Re Hermes 2 ML24032A1992024-02-0202 February 2024 Ltr Hon Wilson Yargee, Chief Alabama-Quassarte Tribal Town Re Hermes 2 ML24032A1982024-02-0202 February 2024 Ltr Hon Stephanie Yahola, Mekko Kialegee Tribal Town Re Hermes 2 ML24032A1972024-02-0202 February 2024 Ltr Hon Stephanie a Bryan Chairwoman Poarch Band of Creek Indians Re Hermes 2 ML24032A1962024-02-0202 February 2024 Ltr Hon Ryan K Morrow Town King Thlopthlocco Tribal Town Re Hermes 2 ML24032A1952024-02-0202 February 2024 Ltr Hon Rick Sylestine, Chairman, Alabama-Coushatta Tribe of Tx Re Hermes 2 ML24032A1942024-02-0202 February 2024 Ltr Hon Michell Hicks Principal Chief Eastern Band of Cherokee Indians Re Hermes 2 ML24032A1932024-02-0202 February 2024 Ltr Hon Marcellus W Osceola Jr Chairman Seminole Tribe of Fl Re Hermes 2 ML24032A1922024-02-0202 February 2024 Ltr Hon Lewis J Johnson Chief Seminole Nation of Oklahoma Re Hermes 2 ML24032A1912024-02-0202 February 2024 Ltr Hon Jonathan Cernek Chairman Coushatta Tribe of Louisiana Re Hermes 2 2024-09-16
[Table view] Category:Proprietary Information Review
MONTHYEARML23328A3972023-11-24024 November 2023 Request for Withholding Information from Public Disclosure - Enclosures of the Construction Permit Application for the Kairos Power, LLC Hermes Non-Power Reactor Facility ML23321A2442023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Changes to Hermes Construction Permit Application Financial Information ML23317A4232023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Response to NRC Question on Fluidic Diode Testing and PSAR Chapter 4 Changes ML23317A4212023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Response to NRC Request for Additional Information 350 on Hermes Preliminary Safety Analysis Report ML23313A2072023-11-16016 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Changes to KP-FHR Core Design and Analysis Methodology Technical Report KP-TR-017-P 2023-11-24
[Table view] |
Text
November 17, 2023
Mr. Peter Hastings Vice President, Regulatory Affairs and Quality Kairos Power LLC 707 W Tower Ave.
Alameda, CA 94501
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE - KAIROS POWER LLC RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION 350 ON HERMES PRELIMINARY SAFETY ANALYSIS REPORT
Dear Mr. Hastings:
By letter dated September 1, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22252A256), Kairos Power LLC (Kairos), submitted an affidavit dated September 1, 2022, executed by Darrell Gardner, to the U.S. Nuclear Regulatory Commission (NRC) staff, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390, Public inspections, exemptions, requests for withholding :
Enclosure 1, Response to NRC Request for Additional Information 350 (Proprietary)
A non-proprietary copy of this document has been placed in the NRCs Public Document Room and added to the NRC Library in ADAMS (ML22251A400).
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- a. The information sought to be withheld from public disclosure is owned and has been held in confidence by Kairos.
- b. The information is of a type customarily held in confidence by Kairos and not customarily disclosed to the public. Kairos has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitute Kairos policy and provide the rational basis required.
- c. The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR 2.390, it is to be received in confidence by the Commission.
P. Hastings
- d. This information is not readily available in public sources.
- e. Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Kairos, because it would enhance the ability of competitors to provide similar products and services by reducing their expenditure of resources using similar project methods, equipment, testing approach, contractors, or licensing approaches. This information is the result of considerable expense to Kairos and has great value in that it will assist Kairos in providing products and services to new, expanding markets not currently served by the company.
- f. The information could reveal or could be used to infer price information, cost information, budget levels, or commercial strategies of Kairos.
- g. Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Kairos of a competitive advantage.
- h. Unrestricted disclosure would jeopardize the position of Kairos in the world market, and thereby give a market advantage to the competition in those countries.
The NRC staff has reviewed the affidavit executed on September 1, 2022, and the subject material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the NRC staff agrees that the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, Kairos should promptly notify the NRC staff. You also should understand that the NRC staff may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes Kairos information. In all review situations, if the NRC staff makes a determination adverse to the above, you will be notified in advance of any public disclosure.
P. Hastings If you have any questions regarding this matter, please contact me via email at Samuel.CuadradoDeJesus@nrc.gov.
Sincerely,
Samuel Cuadrado, Project Manager Advanced Reactors Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation
Docket No.: 05007513
ML23317A421 NRR-106 OFFICE NRR/DANU/UAL1:PM NRR/DANU/UAL1:LA NRR/DANU/UAL1:BC NRR/DANU/UAL1:PM NAME SCuadrado ABaxter WJessup SCuadrado DATE 10/6/2023 10/30/2023 10/10/2023 11/17/2023