MONTHYEARML23338A2542023-12-14014 December 2023 Letter - Kairos Power LLC - Issuance of Construction Permit for Hermes Test Reactor ML23328A3972023-11-24024 November 2023 Request for Withholding Information from Public Disclosure - Enclosures of the Construction Permit Application for the Kairos Power, LLC Hermes Non-Power Reactor Facility ML23328A3982023-11-24024 November 2023 Request for Withholding Information from Public Disclosure Kairos Power LLC Postulated Event Analysis Methodology Technical Report, Kp TR 018 P ML23317A1672023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Response to NRC Question on Salt Spills from Chapters 4 and 13 on Hermes Preliminary Safety Analysis Report ML23317A4202023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Response to NRC Question on Decay Heat Removal Testing from Audit on Hermes PSAR Section 6.3 ML23317A4212023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Response to NRC Request for Additional Information 350 on Hermes Preliminary Safety Analysis Report ML23317A4232023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Response to NRC Question on Fluidic Diode Testing and PSAR Chapter 4 Changes ML23321A2442023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Changes to Hermes Construction Permit Application Financial Information ML23313A1232023-11-16016 November 2023 Request from Withholding Information from Public Disclosure - Enclosures of the Construction Permit Application for the Kairos Power LLC Non-Power Reactor Facility ML23313A1972023-11-16016 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Changes to KP-FHR Core Design and Analysis Methodology Technical Report KP-TR-017-P ML23313A2072023-11-16016 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Changes to KP-FHR Core Design and Analysis Methodology Technical Report KP-TR-017-P ML23268A0092023-11-0303 November 2023 Kairos Power, LLC - Approval of Kairos Power Safeguards Information Protection Plan ML23310A0742023-11-0202 November 2023 Letter to THC NHPA Section 106 Consultation Summary for the Hermes CP Review Redacted ML23304A2502023-10-25025 October 2023 NHPA Section 106 Consultation Summary for the Kairos Hermes CP Review - Redacted ML23268A3272023-09-25025 September 2023 Letter from EPA Regarding Kairos Hermes CP Feis ML23230A7092023-08-21021 August 2023 Ltr to Alabama-Quassarte Tribal Town, Notification of Issuance of the Feis for the Construction Permit ML23195A0762023-08-17017 August 2023 Issuance of the Final Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor ML23199A0062023-08-17017 August 2023 Letter to USFW Mary Jennings Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23199A0132023-08-17017 August 2023 Letter to NPS Niki S. Nicholas Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23199A0292023-08-17017 August 2023 Letter to Achp Blythe Semmer Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23199A0352023-08-17017 August 2023 Letter to THC E. Patrick Mcintyre Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23201A1372023-08-17017 August 2023 Letter to Absentee Shawnee Tribe, Notification of Issuance of the Final Environmental Impact Statement for the Construction Permit ML23214A1382023-08-17017 August 2023 Ltr to Alabama-Coushatta Tribe of Texas, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tennessee ML23214A1402023-08-17017 August 2023 Ltr to Cherokee Nation, Notification of Issuance of Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1412023-08-17017 August 2023 Letter to Coushatta Tribe of Louisiana, Notification of Issuance of the Final Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1422023-08-17017 August 2023 Ltr to Eastern Band of Cherokee Indians, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1492023-08-17017 August 2023 Ltr to Eastern Shawnee Tribe of Oklahoma, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1502023-08-17017 August 2023 Ltr to Jena Band of Choctaw Indians, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1512023-08-17017 August 2023 Ltr to Kialegee Tribal Town, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1532023-08-17017 August 2023 Ltr to Muscogee Creek Nation, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1592023-08-17017 August 2023 Ltr to Poarch Band of Creek Indians, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1602023-08-17017 August 2023 Ltr to Seminole Nation of Oklahoma, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1612023-08-17017 August 2023 Ltr to Seminole Tribe of Florida, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1622023-08-17017 August 2023 Ltr to Shawnee Tribe, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1632023-08-17017 August 2023 Ltr to Thlopthlocco Tribal Town, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1692023-08-17017 August 2023 Ltr to United Keetoowah Band of Cherokee Indians of Oklahoma, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23195A0152023-08-17017 August 2023 Letter to Environmental Protection Agency, Notification of the Issuance of the Final EIS for the Construction Permit for Kairos Hermes Test Reactor ML23178A0962023-06-23023 June 2023 Kairos Power, LLC - Supplemental Information for Environmental Report ML23158A2662023-06-13013 June 2023 Transmittal of Safety Evaluation for Hermes Construction Permit Application ML23151A7442023-05-31031 May 2023 Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 ML23139A2272023-05-19019 May 2023 Kairos Power LLC, Presentation Materials for the May 22, 2023 Pre?Submittal Meeting on Kairos Power Fuel Qualification Supporting the Hermes Operating License Application ML23117A0482023-04-27027 April 2023 Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards on Hermes Preliminary Safety Analysis Report ML23118A3232023-04-27027 April 2023 Kairos Power LLC, Submittal of Safeguards Information Protection Plan ML23115A3942023-04-25025 April 2023 Kairos Power, LLC - Transmittal of Changes to Preliminary Safety Analysis Report ML23102A2392023-04-11011 April 2023 Kairos Power LLC, Presentation Materials for Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes Preliminary Safety Analysis Report Section 12.9 and Chapter 13 ML23089A3872023-03-30030 March 2023 Kairos Power LLC, Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1 ML23088A0682023-03-28028 March 2023 Kairos Power LLC, Transmitatl of Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Subcommittee on Hermes Preliminary Safety Analysis Report Chapters 5, 7, 8, and 11 ML23076A2182023-03-15015 March 2023 Kairos Power, LLC, Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes Preliminary Safety Analysis Report Chapters 1, 2, 3, 4, 6, and 9 ML23062A7342023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Graphite Material Qualification for the KP-FHR ML23062A7302023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Metallic Material Qualification for the KP-FHR 2023-09-25
[Table view] |
Text
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW ATLANTA, GEORGIA 30303-8960 September 25, 2023 Tamsen Dozier Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 RE: U.S. Environmental Protection Agency Comments on the Final Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor Permit. CEQ #20230107
Dear Tamsen Dozier:
The U.S. Environmental Protection Agency (EPA) has reviewed the U.S Nuclear Regulatory Commissions (NRC) above-referenced Final Environmental Impact Statement (FEIS) in accordance with Section 309 of the Clean Air Act (CAA) and Section 102(2)(C) of the National Environmental Policy Act (NEPA). The CAA Section 309 role is unique to EPA. It requires EPA to review and comment publicly on any proposed federal action subject to NEPAs environmental impact statement requirements and to make its comments public.
The FEIS was prepared in response to an application submitted by Kairos Power, LLC (Kairos) for a construction permit (CP) for a non-power test reactor termed Hermes at a site in Oak Ridge, Tennessee.
Kairos plans to build and operate Hermes to demonstrate key elements of the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor technology for possible future commercial deployment. The NRC proposes to issue a CP to Kairos to construct the proposed Hermes non-power test reactor facilities on a site in the East Tennessee Technology Park.
The FEIS considered three alternatives: the No Action alternative and two site location alternatives.
Under the No Action alternative, the NRC would not issue a construction permit to Kairos to build a test reactor to demonstrate the new technology. The alternative selection process involved consideration of multiple sites, leading to two alternative site locations: (1) the proposed site is located within the East Tennessee Technology Park in Oak Ridge, Tennessee; and (2) an alternative site in Eagle Rock, Idaho.
We appreciate the inclusion of our previous comments in the FEIS and NRCs responses related to water resources and environmental justice. Based on our review of the FEIS, we have not identified any additional public health, welfare, or environmental quality concerns that should be addressed in the Record of Decision.
The EPA appreciates the opportunity to review the FEIS for the Construction Permit for the Kairos Hermes Test Reactor. If you have any questions regarding this letter, please contact Larry Long at (404) 562-9460, or by e-mail at long.larry@epa.gov.
Sincerely, Kajumb Digitally signed by Kajumba, Ntale a, Ntale Date: 2023.09.25 07:29:27 -04'00' Ntale Kajumba NEPA Manager