ML23089A387
| ML23089A387 | |
| Person / Time | |
|---|---|
| Site: | 99902069, Hermes File:Kairos Power icon.png |
| Issue date: | 03/30/2023 |
| From: | Hastings P Kairos Power |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| Shared Package | |
| ML23089A386 | List: |
| References | |
| KP-NRC-2303-003 | |
| Download: ML23089A387 (1) | |
Text
KP-NRC-2303-003 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 March 30, 2023 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1
References:
Letter, Kairos Power LLC to Document Control Desk, Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 0, October 31, 2021 (ML21306A131)
In October 2021, Kairos Power submitted Revision 0 of the Environmental Report (ER) as part of the Construction Permit Application (CPA) for the Hermes non-power reactor (referenced above).
Kairos Power has submitted various discrete changes to the ER to address NRC feedback received as part of the Hermes CPA review since the submittal of ER, Revision 0. This letter transmits Revision 1 of the ER to reflect the integration of previously submitted changes and new changes to the pages of the ER to address NRC feedback.
contains Revision 1 of the ER.
If you have any questions or need any additional information, please contact me at hastings@kairospower.com or (704) 336-9596, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on March 30, 2023 Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosure:
Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1
KP-NRC-2303-003 Page 2 xc (w/enclosure):
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Tamsen Dozier, Environmental Project Manager, NMSS, Environmental Review Branch Daniel Barnhurst, Environmental Project Manager, NMSS, Environmental Review Branch