Letter Sequence Approval |
---|
CAC:000431, (Approved, Closed) EPID:L-2021-TOP-0022, Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) (Approved, Closed) |
|
MONTHYEARML23011A1052011-01-11011 January 2011 Redacted Draft Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Draft Approval ML20329A1452020-11-20020 November 2020 Terrapower'S QAPD Preliminary Questions Project stage: Other ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email Project stage: Other ML23062A7302023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Metallic Material Qualification for the KP-FHR Project stage: Approval ML23062A7272023-03-13013 March 2023 Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) Project stage: Request ML23062A7282023-03-13013 March 2023 Redacted Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) Project stage: Approval ML23062A7342023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Graphite Material Qualification for the KP-FHR Project stage: Approval ML23062A7322023-03-13013 March 2023, 14 March 2023 Final Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Request ML23062A7332023-03-14014 March 2023 Redacted Final Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Approval 2020-11-20
[Table View] |
|
---|
Category:Letter
MONTHYEARML24261C0092024-09-16016 September 2024 Kairos Power LLC - Charlotte Office Address ML24158A2322024-08-30030 August 2024 Letter to Kairos, Inc., Exemption and Final EA ML24200A1172024-07-19019 July 2024 Transmittal Letter for the Hermes 2 Safety Evaluation ML24155A0612024-06-0303 June 2024 Kairos Power LLC, Presentation Materials for the Kairos Power Meeting with the Nuclear Regulatory Commission on the Hermes Foundation Design ML24150A2442024-05-29029 May 2024 Kairos Power, LLC - Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report, Chapters 2, 3, 5, 9, and 13 ML24150A2172024-05-28028 May 2024 Kairos Power, LLC - Request for Documents Related to Non-Power Security ML24144A0912024-05-23023 May 2024 Kairos Power, LLC - Submittal of the Hermes 2 Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor, Revision 1, and the Postulated Event Analysis Methodology Technical Report, Revi ML24138A2122024-05-16016 May 2024 Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapters 3, 5, and 13 ML24136A2542024-05-15015 May 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 9 ML24135A3832024-05-14014 May 2024 Kairos Power, LLC - Transmittal of Response to NRC Request for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 ML24131A1262024-05-10010 May 2024 Kairos Power, LLC - Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report Chapters 1, 4, 6-8, 10-12, 14, and 16-18 ML24101A0772024-04-23023 April 2024 Hermes 2 NPS Dea ML24101A0782024-04-23023 April 2024 Hermes 2 SHPO Dea ML24101A0722024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Johnson, J ML24113A1732024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hill, D ML24113A1702024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Bunch, J ML24113A1692024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Bryan, a ML24113A1682024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Barnes, B ML24113A1712024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Cernek, J ML24113A1722024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hicks, M ML24113A1742024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hoskin, Jr., C ML24113A1752024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Johnson, L J ML24113A1762024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Morrow, R K ML24113A1782024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Rogers, L ML24113A1772024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Osceola, Jr. M W ML24113A1792024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Sylestine, R ML24113A1822024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Yargee, W ML24113A1802024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Wallace, G J ML24113A1812024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Yahola, ML24101A2172024-04-19019 April 2024 Letter to Kairos Power, LLC-Notice of Availability of the Draft Environmental Assessment for the Construction Permit for Hermes 2 Test Reactors ML24109A2952024-04-16016 April 2024 Kairos Power, LLC - Slides to Support April 22, 2024, Public Meeting About Hermes Physical Security ML24103A2422024-04-12012 April 2024 Kairos Power, LLC, Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 ML24103A2452024-04-12012 April 2024 Kairos Power, LLC, Transmittal of Changes to Construction Permit Application - Financial Information Enclosure and PSAR Chapter 15 ML24206A0852024-03-20020 March 2024 NPS Section 106 Initiation Response - Hermes 2 ML24073A3182024-03-13013 March 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 13 and KP-TR-022 ML24072A2982024-03-12012 March 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 7 ML24065A1012024-03-0404 March 2024 Kairos Power LLC, Transmittal of Reponses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report ML24039A1902024-02-0808 February 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 ML24032A1932024-02-0202 February 2024 Ltr Hon Marcellus W Osceola Jr Chairman Seminole Tribe of Fl Re Hermes 2 ML24032A2002024-02-0202 February 2024 Ltr Libby Rogers, Principal Chief, Jena Band of Choctaw Indians Re Hermes 2 ML24032A1992024-02-0202 February 2024 Ltr Hon Wilson Yargee, Chief Alabama-Quassarte Tribal Town Re Hermes 2 ML24032A1982024-02-0202 February 2024 Ltr Hon Stephanie Yahola, Mekko Kialegee Tribal Town Re Hermes 2 ML24032A1972024-02-0202 February 2024 Ltr Hon Stephanie a Bryan Chairwoman Poarch Band of Creek Indians Re Hermes 2 ML24032A1962024-02-0202 February 2024 Ltr Hon Ryan K Morrow Town King Thlopthlocco Tribal Town Re Hermes 2 ML24032A1952024-02-0202 February 2024 Ltr Hon Rick Sylestine, Chairman, Alabama-Coushatta Tribe of Tx Re Hermes 2 ML24032A1942024-02-0202 February 2024 Ltr Hon Michell Hicks Principal Chief Eastern Band of Cherokee Indians Re Hermes 2 ML24032A1922024-02-0202 February 2024 Ltr Hon Lewis J Johnson Chief Seminole Nation of Oklahoma Re Hermes 2 ML24032A1912024-02-0202 February 2024 Ltr Hon Jonathan Cernek Chairman Coushatta Tribe of Louisiana Re Hermes 2 ML24032A1902024-02-0202 February 2024 Ltr Hon Joe Bunch Chief United Keetoowah Band of Cherokee Indians Re Hermes 2 ML24032A1892024-02-0202 February 2024 Ltr Hon Glenna J Wallace Chief Eastern Shawnee Tribe of Oklahoma Re Hermes 2 2024-09-16
[Table view] |
Text
OFFICIAL USE ONLY - PROPRIETARY AND EXPORT CONTROLLED INFORMATION OFFICIAL USE ONLY - PROPRIETARY AND EXPORT CONTROLLED INFORMATION Mr. Peter Hastings Vice President, Regulatory Affairs and Quality Kairos Power LLC 707 W Tower Ave.
Alameda, CA 94501
SUBJECT:
KAIROS POWER LLC - FINAL SAFETY EVALUATION FOR TOPICAL REPORT METALLIC MATERIAL QUALIFICATION FOR THE KAIROS POWER FLUORIDE SALT-COOLED HIGH-TEMPERATURE REACTOR (REVISION 4)
(EPID NO. L-2021-TOP-0022/CAC NO. 000431)
Dear Mr. Hastings:
This letter provides the final safety evaluation (SE) for the Kairos Power LLC (Kairos) topical report (TR) Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor, Revision 4. By letter dated June 30, 2020, Kairos submitted Revision 0 of the TR for the U.S. Nuclear Regulatory Commission (NRC) staff review (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20182A799). On November 25, 2020, the NRC staff provided its review questions to Kairos (ML20332A076).
The review questions were discussed during a closed meeting held between the NRC staff and Kairos on January 13, 2021. By letter dated June 30, 2021, Kairos submitted Revision 1 of the TR (ML21181A385) to address the NRC staff review questions. By letter dated April 26, 2022, Kairos submitted Revision 2 of the TR (ML22116A246) to address questions discussed during a closed meeting held between the NRC staff and Kairos on February 2, 2022, and February 14, 2022. By letter dated August 19, 2022, Kairos submitted Revision 3 (ML22231B221) to address technical items discussed with the NRC staff during closed meetings held on July 18, 2022, and August 10, 2022. By letter dated September 20, 2022, Kairos submitted Revision 4 (ML22263A456) to address technical items discussed with the NRC staff during a closed meeting held on September 12, 2022.
The NRC staffs final SE for Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor, Revision 4, is enclosed. The NRC staff provided Kairos a draft of the SE for the purpose of identifying proprietary information on December 19, 2022 (ML22355A307). On December 23, 2022, Kairos confirmed that the proprietary information in the draft SE was appropriately marked (ML23058A225). to this letter contains Proprietary and Export Controlled Information. When separated from, this letter is DECONTROLLED.March 13, 2023 OFFICIAL USE ONLY - PROPRIETARY AND EXPORT CONTROLLED INFORMATION OFFICIAL USE ONLY - PROPRIETARY AND EXPORT CONTROLLED INFORMATION The Advisory Committee on Reactor Safeguards (ACRS) was briefed on this TR on January 12, 2023, and February 1, 2023. The ACRS provided its recommendations for the publication of this SE in a letter dated February 15, 2023 (ML23037A951). The enclosed SE is final, and a redacted version will be made publicly available.
The NRC staff requests that Kairos publish an accepted version of this TR within 3 months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed SE after the title page. The accepted version shall include an "-A" (designating accepted) following the TR identification number.
If you have any questions, please contact Richard Rivera at Richard.Rivera@nrc.gov.
Sincerely, William Jessup, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Project No.: 99902069 and Docket No.: 05007513
Enclosures:
- 1. Proprietary (Non-Public) Safety Evaluation
- 2. Redacted (Public) Safety Evaluation cc via ListServ: Distribution at Kairos Power FHR and Kairs Power Hermes Signed by Jessup, William on 03/13/23
Pkg: ML23062A727 Letter: ML23062A730 Safety Evaluation: ML23039A169 Redacted Safety Evaluation: ML23062A728 NRR-106 OFFICE NRR/DANU/UAL1:PM NRR/DANU/UAL1:LA OGC/NLO NAME RRivera DGreene MWright DATE 3/6/2023 3/8/2023 3/10/2023 OFFICE NRR/DANU/UAL1/BC NAME WJessup DATE 3/13/2023