Letter Sequence Approval |
|---|
CAC:000431, (Approved, Closed) EPID:L-2021-TOP-0022, Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: ML20280A970, ML20343A224, ML21147A547, ML21160A221, ML21218A045, ML22018A300, ML23097A123, ML23097A127, ML24036A222, ML24036A224, ML24043A242, ML24043A244, ML24103A224, ML24212A030, ML24262A066, ML24297A138, ML25017A130, ML25023A086, ML25028A267, ML25101A297, ML25161A172, ML25209A071, ML25248A302, ML25248A303, ML25325A151
|
MONTHYEARML23011A1052011-01-11011 January 2011 Redacted Draft Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Draft Approval ML21263A2362020-08-0505 August 2020 Safety Evaluation by the Office of Nuclear Reactor Regulation Regarding the Terrapower, LLC Quality Assurance Topical Report Project stage: Approval ML20280A9702020-10-21021 October 2020 Terrapower - Acceptance Topical Report Quality Assurance Program Description Project stage: Other ML20294A3372020-11-10010 November 2020 Letter and Final Safety Evaluation for Kairos Power, LLC Topical Report-KP Fhr Risk-Informed Performance-Based Licensing Basis Development Methodology (Revision 1) (EPID No. L-2019-TOP-0009/CAC No. 000431) Project stage: Approval ML20343A2242020-12-0808 December 2020 Verification Letter of the Approval Version of Kairos Power LLC Topical Report KP-TR-O09-NP, - KP-FHR Risk-Informed Performance-Based Licensing Basis Development Methodology - (Revision 1) (CAC No. 000431) Project stage: Other ML21005A0152020-12-23023 December 2020 Revision to Terrapower, LLC - Quality Assurance Topical Report Project stage: Request ML21021A3642021-01-21021 January 2021 Enclosure 2: Presentation Materials About Construction Permit Application for the KP-FHR (Non-Proprietary) Project stage: Request ML21071A0822021-03-0808 March 2021 Kairos Power, LLC - Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 1) Project stage: Request ML21071A0832021-03-31031 March 2021 Kairos Power, LLC - KP-TR-007-NP, Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report, Revision 1 (Non-Proprietary) Project stage: Request ML21105A5182021-04-15015 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 2) Project stage: Request ML21117A0482021-04-26026 April 2021 Quality Assurance Program for the Kairos Power Flouride Salt Cooled High Temperature Reactor Topical Report, Revision 3 Project stage: Request ML21117A0472021-04-26026 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report(Revision 3) Project stage: Request ML21105A5192021-04-30030 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report Revision 2 Project stage: Request ML21148A2362021-05-28028 May 2021 Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21147A5472021-06-0909 June 2021 Kairos Power Hermes Test Reactor Psotulated Events Audit Plan Project stage: Other ML21160A2212021-06-22022 June 2021 Letter SE Kairos Fuel Performance Methodology Topical Project stage: Other ML21183A2002021-07-0202 July 2021 Revised Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21218A0452021-08-17017 August 2021 Kairos Hermes PSAR Pre-Submittal Audit Plan - Rev. 3 Project stage: Other ML21194A4392021-08-20020 August 2021 Draft Kairos Flibe Thermophisical Properties Audit Plan 6 30 21 Project stage: Draft Other ML21215A5092021-08-31031 August 2021 NRC Form 898, Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor, Revision 1 Project stage: Other ML21308A5972021-11-16016 November 2021 Enclosure - Safety Evaluation for Kairos Power LLC Topical Report KP-TR-007-NP, Quality Assurance Program for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Revision 3 Project stage: Approval ML21308A5982021-11-16016 November 2021 Letter - Kairos Power, LLC - Safety Evaluation for Kairos Power, LLC Topical Report KP-TR-007-NP, Quality Assurance Program Project stage: Approval ML22018A3002022-01-21021 January 2022 Letter - NRC Feedback on Terrapower Advanced SER QAPD Project stage: Other ML22018A1612022-01-31031 January 2022 Kairos Power LLC, Kp& 8208;TR& 8208;004& 8208;NP, Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Rev. 4 Project stage: Request PMNS20220090, Technical Discussion of Kairos Power Responses to the NRC Staffs Preliminary Questions on the Graphite Materials Qualification Topical Report, Revision 12022-02-0404 February 2022 Technical Discussion of Kairos Power Responses to the NRC Staffs Preliminary Questions on the Graphite Materials Qualification Topical Report, Revision 1 Project stage: Request ML22024A4852022-02-0808 February 2022 OEDO-21-00545 -Safety Evaluation of the Kairos Power LLC Topical Report KP-TR-012-P, Revision 1, KP-FHR Mechanistic Source Term Methodology Project stage: Request ML22088A2312022-03-28028 March 2022 KP-TR-012-NP, Revision 3, KP-FHR Mechanistic Source Term Methodology Topical Report Project stage: Request ML22112A1332022-04-22022 April 2022 Kairos Power, LLC, Safety Evaluation for KP-TR-012 KP-FHR Mechanistic Source Term Methodology Topical Report, Revision 3 (EPID L-2020-TOP-0051/CAC 000431) Project stage: Approval ML22136A0892022-05-26026 May 2022 Safety Evaluation for Kairos Regulatory Analysis Topical Report Kp TR-004, Revision 4 Project stage: Approval PMNS20220667, Kairos Power Graphite Materials Qualification Topical Report, Rev. 2: Follow-Up Clarification Meeting2022-06-16016 June 2022 Kairos Power Graphite Materials Qualification Topical Report, Rev. 2: Follow-Up Clarification Meeting Project stage: Request ML22186A2132022-07-0505 July 2022 Kairos Power LLC, Fuel Qualification Methodology for Fluoride Salt-Cooled High Temperature Reactor (KP-FHR), Revision 2 Project stage: Request ML22216A1792022-07-29029 July 2022 Submission of X Energy, LLC (X-energy) TRISO-X Pebble Fuel Qualification Methodology Project stage: Request ML22265A2182022-09-21021 September 2022 Withdrawal of X Energy, LLC (X-energy) Xe-100 Topical Report: TRISO-X Pebble Fuel Qualification Methodology, Revisions 1 and 2 Project stage: Request ML22266A2862022-09-23023 September 2022 Submittal of Revised Terrapower, LLC Quality Assurance Topical Report, Revision 14 Project stage: Request ML22259A1452022-09-30030 September 2022 KP-TR-014-NP, Revision 4, Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor Project stage: Request ML22318A2362022-11-10010 November 2022 Submission of X Energy, LLC (X-energy) Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Request ML23024A2632023-02-0808 February 2023 Staff Response to Advisory Committee on Reactor Safeguards Letter on Safety Evaluation of the Kairos TR Project stage: Request ML23038A1682023-02-13013 February 2023 Draft Safety Evaluation of the Kairos Topical Report - KP-TR-014, Revision 4 - Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor Project stage: Request ML23048A3262023-03-0202 March 2023 Final Safety Evaluation for Kairos Fuel Qualification TR Project stage: Approval ML22327A2012023-03-0909 March 2023 X Energy LLC - Safety Evaluation of XE-100 Topical Report TRISO-X Pebble Fuel Qualification Methodology Revision No. 3 (EPID No. L-2021-TOP-0011) - Redacted Project stage: Approval ML22327A1982023-03-0909 March 2023 Cover Letter – X Energy, LLC - Safety Evaluation of Xe-100 Topical Report, TRISO-X Pebble Fuel Qualification Methodology, Revision No. 3 Project stage: Approval ML23062A7302023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Metallic Material Qualification for the KP-FHR Project stage: Approval ML23062A7282023-03-13013 March 2023 Redacted Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) Project stage: Approval ML23062A7342023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Graphite Material Qualification for the KP-FHR Project stage: Approval ML23062A7322023-03-13013 March 2023, 14 March 2023 Final Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Request ML23062A7272023-03-13013 March 2023 Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) Project stage: Request ML23062A7332023-03-14014 March 2023 Redacted Final Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Approval ML24325A3772023-03-20020 March 2023 Revised Draft SE Natrium EPZ TR Project stage: Draft Approval ML23116A1782023-05-0909 May 2023 Letter - Safety Evaluation of Quality Assurance Topical Report TP-QA-PD-0001, Terrapower QA Program Description, Revisions 13 and 14 Project stage: Approval ML23116A1832023-05-0909 May 2023 Enclosure - Safety Evaluation of Quality Assurance Topical Report TP-QA-PD-0001, Terrapower QA Program Description, Revisions 13 and 14 Project stage: Approval 2022-01-21
[Table View] |
Text
OFFICIAL USE ONLY - PROPRIETARY AND EXPORT CONTROLLED INFORMATION OFFICIAL USE ONLY - PROPRIETARY AND EXPORT CONTROLLED INFORMATION Mr. Peter Hastings Vice President, Regulatory Affairs and Quality Kairos Power LLC 707 W Tower Ave.
Alameda, CA 94501
SUBJECT:
KAIROS POWER LLC - FINAL SAFETY EVALUATION FOR TOPICAL REPORT METALLIC MATERIAL QUALIFICATION FOR THE KAIROS POWER FLUORIDE SALT-COOLED HIGH-TEMPERATURE REACTOR (REVISION 4)
(EPID NO. L-2021-TOP-0022/CAC NO. 000431)
Dear Mr. Hastings:
This letter provides the final safety evaluation (SE) for the Kairos Power LLC (Kairos) topical report (TR) Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor, Revision 4. By letter dated June 30, 2020, Kairos submitted Revision 0 of the TR for the U.S. Nuclear Regulatory Commission (NRC) staff review (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20182A799). On November 25, 2020, the NRC staff provided its review questions to Kairos (ML20332A076).
The review questions were discussed during a closed meeting held between the NRC staff and Kairos on January 13, 2021. By letter dated June 30, 2021, Kairos submitted Revision 1 of the TR (ML21181A385) to address the NRC staff review questions. By letter dated April 26, 2022, Kairos submitted Revision 2 of the TR (ML22116A246) to address questions discussed during a closed meeting held between the NRC staff and Kairos on February 2, 2022, and February 14, 2022. By letter dated August 19, 2022, Kairos submitted Revision 3 (ML22231B221) to address technical items discussed with the NRC staff during closed meetings held on July 18, 2022, and August 10, 2022. By letter dated September 20, 2022, Kairos submitted Revision 4 (ML22263A456) to address technical items discussed with the NRC staff during a closed meeting held on September 12, 2022.
The NRC staffs final SE for Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor, Revision 4, is enclosed. The NRC staff provided Kairos a draft of the SE for the purpose of identifying proprietary information on December 19, 2022 (ML22355A307). On December 23, 2022, Kairos confirmed that the proprietary information in the draft SE was appropriately marked (ML23058A225). to this letter contains Proprietary and Export Controlled Information. When separated from, this letter is DECONTROLLED.
March 13, 2023
OFFICIAL USE ONLY - PROPRIETARY AND EXPORT CONTROLLED INFORMATION OFFICIAL USE ONLY - PROPRIETARY AND EXPORT CONTROLLED INFORMATION P. Hastings The Advisory Committee on Reactor Safeguards (ACRS) was briefed on this TR on January 12, 2023, and February 1, 2023. The ACRS provided its recommendations for the publication of this SE in a letter dated February 15, 2023 (ML23037A951). The enclosed SE is final, and a redacted version will be made publicly available.
The NRC staff requests that Kairos publish an accepted version of this TR within 3 months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed SE after the title page. The accepted version shall include an "-A" (designating accepted) following the TR identification number.
If you have any questions, please contact Richard Rivera at Richard.Rivera@nrc.gov.
Sincerely, William Jessup, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Project No.: 99902069 and Docket No.: 05007513
Enclosures:
1.
Proprietary (Non-Public) Safety Evaluation 2.
Redacted (Public) Safety Evaluation cc via ListServ: Distribution at Kairos Power FHR and Kairs Power Hermes Signed by Jessup, William on 03/13/23
Pkg: ML23062A727 Letter: ML23062A730 Safety Evaluation: ML23039A169 Redacted Safety Evaluation: ML23062A728 NRR-106 OFFICE NRR/DANU/UAL1:PM NRR/DANU/UAL1:LA OGC/NLO NAME RRivera DGreene MWright DATE 3/6/2023 3/8/2023 3/10/2023 OFFICE NRR/DANU/UAL1/BC NAME WJessup DATE 3/13/2023