Letter Sequence Approval |
---|
EPID:L-2021-NEW-0011, Hermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
|
MONTHYEARML21319A3542021-11-29029 November 2021 Acceptance of the Hermes Non-Power Test Reactor Construction Permit Application for Kairos Power LLC Project stage: Acceptance Review ML22024A4922022-01-10010 January 2022 Hermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1 Project stage: Request ML22198A0012022-01-19019 January 2022, 25 January 2022 Summary of 21Jan2022 Phone Conversation W City of Oak Ridge Public Works Project stage: Request ML22041A3372022-02-0303 February 2022 Kairos Power LLC, Transmittal of Responses-to NRC Questions 2.3-1 and 2.3-2 on the Hermes Preliminary Safety Analysis Report Project stage: Request ML21364A0132022-02-0808 February 2022 Kairos Power LLC - Application for Construction Permit for Hermes Test Reactor Project stage: Other ML22040A3382022-02-0909 February 2022 Kairos Power LLC, Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Other ML22040A3362022-02-0909 February 2022 Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Request ML22042A0952022-02-10010 February 2022 Kairos Power LLC, Transmittal of Changes to Hermes Construction Permit Application Project stage: Request ML22039A2262022-02-17017 February 2022 Audit Plan for the Kairos Hermes Preliminary Safety Analysis Report (PSAR) Section 6.3 Decay Heat Removal System - February 2022 Project stage: Other ML22106A0002022-02-28028 February 2022 Construction and Demonstration of a Prototype Mobile Microreactor Feis: Reference for Kairos Hermes CP Application Project stage: Other ML22060A2722022-03-0101 March 2022 Kairos Power, LLC, Transmittal of Changes to Maximum Hypothetical Accident Dose Results in Hermes Construction Permit Application Project stage: Request ML22031A2892022-03-10010 March 2022 Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review Project stage: Request ML22088A2942022-03-11011 March 2022 Scoping Comment (3) from Tennessee Historical Commission Kairos Hermes CP Application Review Project stage: Other ML22089A1662022-04-0808 April 2022 Kairos Power LLC - Hermes Construction Permit Preliminary Safety Analysis Report I&C Repor (Chapter 7) Audit Plan (Cac/Epid No. 000955/05007513/L-2021-NEW-0011) Project stage: Other ML22169A0092022-04-12012 April 2022 NPS Scoping Comments on Kairos Test Reactor Project stage: Request ML22107A0062022-04-17017 April 2022 Oak Ridge Reservation Annual Site Environmental Report 2017: Reference for Kairos Hermes CP Application Project stage: Other ML22115A2042022-04-22022 April 2022 Kairos Power, LLC, Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes Environmental Report Project stage: Request ML22117A2152022-04-22022 April 2022, 27 April 2022 Kairos Power LLC, Transmittal of Supplemental Information for NRC Information Need HCUL-10 for the Hermes Environmental Review Project stage: Request ML22117A2182022-04-27027 April 2022 Kairos Power LLC, Transmittal of Changes to Hermes Environmental Report Resulting from NRC Environmental Review Audit Project stage: Request ML22110A0182022-05-0505 May 2022 Kairos Power LLC, Summary of March 23, 2022, Public Outreach Meeting on the Proposed Kairos Hermes Test Reactor with Designated Period for Receipt of Environmental Scoping Comments Project stage: Request ML22143B0162022-05-27027 May 2022 Audit Plan for Hermes Site Characteristics PSAR Chapter 2 Project stage: Other ML22181B1572022-06-30030 June 2022 Kairos Power LLC Transmittal of Changes to Construction Permit Application Project stage: Request ML22194A0142022-08-0101 August 2022, 31 August 2022 Kairos Hermes Construction Permit Application - Issuance of Environmental Scoping Summary Report Project stage: Request ML22230D0762022-08-0505 August 2022 Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas System Project stage: Other ML22227A1802022-08-0808 August 2022 Final RAI 348 on Shutdown Rod Reliability Project stage: RAI ML22196A3872022-08-24024 August 2022 Kairos Hermes CP Review - Environmental Audit Report Project stage: Request ML22272A5932022-09-29029 September 2022 Kairos Power, LLC - Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1 Project stage: Request ML23019A3602022-11-0606 November 2022, 15 November 2022 Kairos Power LLC, Additional Information Related to Construction Permit Application - PSAR Chapter 1 Project stage: Request ML23019A3612022-11-15015 November 2022 Kairos Power LLC, Additional Information Related to Construction Permit Application - PSAR Chapter 1 Project stage: Other ML22342B2822022-12-0808 December 2022 Kairos Power LLC, Transmittal of Reponses to NRC Question on Hermes Preliminary Safety Analysis Report Project stage: Request ML22353A6252022-12-19019 December 2022 Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapter 6 and Response to NRC Question on Dhrs Testing Project stage: Request ML23055A6722023-02-24024 February 2023, 28 February 2023 Kairos Power LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 2 Project stage: Request ML23151A7432023-05-31031 May 2023 Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 Project stage: Request ML23158A2682023-06-13013 June 2023 Safety Evaluation for Hermes Construction Permit Application Project stage: Approval ML23158A2652023-06-13013 June 2023 Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes Non-Power Test Reactor Project stage: Request ML23158A2662023-06-13013 June 2023 Transmittal of Safety Evaluation for Hermes Construction Permit Application Project stage: Approval ML23181A1072023-07-18018 July 2023 Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis Report Project stage: Meeting 2022-04-12
[Table View] |
|
---|
Category:Letter
MONTHYEARML23338A2542023-12-14014 December 2023 Letter - Kairos Power LLC - Issuance of Construction Permit for Hermes Test Reactor ML23328A3972023-11-24024 November 2023 Request for Withholding Information from Public Disclosure - Enclosures of the Construction Permit Application for the Kairos Power, LLC Hermes Non-Power Reactor Facility ML23328A3982023-11-24024 November 2023 Request for Withholding Information from Public Disclosure Kairos Power LLC Postulated Event Analysis Methodology Technical Report, Kp TR 018 P ML23317A1672023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Response to NRC Question on Salt Spills from Chapters 4 and 13 on Hermes Preliminary Safety Analysis Report ML23317A4202023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Response to NRC Question on Decay Heat Removal Testing from Audit on Hermes PSAR Section 6.3 ML23317A4212023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Response to NRC Request for Additional Information 350 on Hermes Preliminary Safety Analysis Report ML23317A4232023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Response to NRC Question on Fluidic Diode Testing and PSAR Chapter 4 Changes ML23321A2442023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Changes to Hermes Construction Permit Application Financial Information ML23313A1232023-11-16016 November 2023 Request from Withholding Information from Public Disclosure - Enclosures of the Construction Permit Application for the Kairos Power LLC Non-Power Reactor Facility ML23313A1972023-11-16016 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Changes to KP-FHR Core Design and Analysis Methodology Technical Report KP-TR-017-P ML23313A2072023-11-16016 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Changes to KP-FHR Core Design and Analysis Methodology Technical Report KP-TR-017-P ML23268A0092023-11-0303 November 2023 Kairos Power, LLC - Approval of Kairos Power Safeguards Information Protection Plan ML23310A0742023-11-0202 November 2023 Letter to THC NHPA Section 106 Consultation Summary for the Hermes CP Review Redacted ML23304A2502023-10-25025 October 2023 NHPA Section 106 Consultation Summary for the Kairos Hermes CP Review - Redacted ML23268A3272023-09-25025 September 2023 Letter from EPA Regarding Kairos Hermes CP Feis ML23230A7092023-08-21021 August 2023 Ltr to Alabama-Quassarte Tribal Town, Notification of Issuance of the Feis for the Construction Permit ML23195A0762023-08-17017 August 2023 Issuance of the Final Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor ML23199A0062023-08-17017 August 2023 Letter to USFW Mary Jennings Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23199A0132023-08-17017 August 2023 Letter to NPS Niki S. Nicholas Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23199A0292023-08-17017 August 2023 Letter to Achp Blythe Semmer Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23199A0352023-08-17017 August 2023 Letter to THC E. Patrick Mcintyre Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23201A1372023-08-17017 August 2023 Letter to Absentee Shawnee Tribe, Notification of Issuance of the Final Environmental Impact Statement for the Construction Permit ML23214A1382023-08-17017 August 2023 Ltr to Alabama-Coushatta Tribe of Texas, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tennessee ML23214A1402023-08-17017 August 2023 Ltr to Cherokee Nation, Notification of Issuance of Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1412023-08-17017 August 2023 Letter to Coushatta Tribe of Louisiana, Notification of Issuance of the Final Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1422023-08-17017 August 2023 Ltr to Eastern Band of Cherokee Indians, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1492023-08-17017 August 2023 Ltr to Eastern Shawnee Tribe of Oklahoma, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1502023-08-17017 August 2023 Ltr to Jena Band of Choctaw Indians, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1512023-08-17017 August 2023 Ltr to Kialegee Tribal Town, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1532023-08-17017 August 2023 Ltr to Muscogee Creek Nation, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1592023-08-17017 August 2023 Ltr to Poarch Band of Creek Indians, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1602023-08-17017 August 2023 Ltr to Seminole Nation of Oklahoma, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1612023-08-17017 August 2023 Ltr to Seminole Tribe of Florida, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1622023-08-17017 August 2023 Ltr to Shawnee Tribe, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1632023-08-17017 August 2023 Ltr to Thlopthlocco Tribal Town, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1692023-08-17017 August 2023 Ltr to United Keetoowah Band of Cherokee Indians of Oklahoma, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23195A0152023-08-17017 August 2023 Letter to Environmental Protection Agency, Notification of the Issuance of the Final EIS for the Construction Permit for Kairos Hermes Test Reactor ML23178A0962023-06-23023 June 2023 Kairos Power, LLC - Supplemental Information for Environmental Report ML23158A2662023-06-13013 June 2023 Transmittal of Safety Evaluation for Hermes Construction Permit Application ML23151A7442023-05-31031 May 2023 Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 ML23139A2272023-05-19019 May 2023 Kairos Power LLC, Presentation Materials for the May 22, 2023 Pre?Submittal Meeting on Kairos Power Fuel Qualification Supporting the Hermes Operating License Application ML23117A0482023-04-27027 April 2023 Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards on Hermes Preliminary Safety Analysis Report ML23118A3232023-04-27027 April 2023 Kairos Power LLC, Submittal of Safeguards Information Protection Plan ML23115A3942023-04-25025 April 2023 Kairos Power, LLC - Transmittal of Changes to Preliminary Safety Analysis Report ML23102A2392023-04-11011 April 2023 Kairos Power LLC, Presentation Materials for Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes Preliminary Safety Analysis Report Section 12.9 and Chapter 13 ML23089A3872023-03-30030 March 2023 Kairos Power LLC, Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1 ML23088A0682023-03-28028 March 2023 Kairos Power LLC, Transmitatl of Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Subcommittee on Hermes Preliminary Safety Analysis Report Chapters 5, 7, 8, and 11 ML23076A2182023-03-15015 March 2023 Kairos Power, LLC, Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes Preliminary Safety Analysis Report Chapters 1, 2, 3, 4, 6, and 9 ML23062A7342023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Graphite Material Qualification for the KP-FHR ML23062A7302023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Metallic Material Qualification for the KP-FHR 2023-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 13, 2023 Mr. Peter Hastings Vice President, Regulatory Affairs and Quality Kairos Power LLC 707 W Tower Ave Alameda, CA 94501
SUBJECT:
SAFETY EVALUATION FOR THE KAIROS POWER LLC CONSTRUCTION PERMIT APPLICATION FOR THE HERMES NON-POWER TEST REACTOR (EPID NO. L-2021-NEW-0011)
Dear Mr. Hastings:
This letter is to inform you that the U.S. Nuclear Regulatory Commission (NRC) staff has completed the safety evaluation (SE) for the Kairos Power LLC (Kairos) construction permit application for the Hermes non-power test reactor. Kaiross application was submitted in two parts by letters dated September 29, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21272A375) and October 31, 2021 (ML21306A131).
The enclosed SE is provided to Kairos for information and will be submitted to the Commission in preparation for the mandatory (uncontested) hearing. The SE has also been made public (ML23158A268). The NRC staff issuance of this SE does not constitute a commitment to issue the construction permit.
Sincerely, Signed by Shams, Mohamed on 06/13/23 Mohamed Shams, Director Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-7513
Enclosure:
As stated
Pkg: ML23158A265 Letter: ML23158A266 Safety Evaluation: ML23158A268 NRR-043 OFFICE NRR/DANU/UAL1:PM NRR/DANU/UAL1:LA NMSS/DFM/MCAB:BC* NSIR/DPR/RLB:BC*
NAME MHiser (EHelvenston for) DGreene JRubenstone JQuichocho DATE 6/12/2023 6/12/2023 2/15/23 2/22/23 OFFICE NRR/DRA/APLB:BC* NRR/DEX/EXHB:BC* NRR/DEX/ESEB:BC* NRR/DEX/EICB:BC*
NAME JRobinson BHayes ITseng MWaters DATE 2/23/23 2/24/23 2/27/23 2/27/23 OFFICE NMSS/REFS/FAB:BC* NRR/DEX/EEEB:BC* NRR/DANU/UNPO* NRR/DRO/IQVB*
NAME FMiller WMorton TTate KKavanagh (YDiaz-Castillo for)
DATE 2/27/23 2/28/23 6/6/23 6/7/23 OFFICE NRR/DANU/UTB2:BC NRR/DANU/UAL1:BC(A) OGC/NLO* NRR/DANU/D NAME CdeMessieres AProffitt BAyersman MShams DATE 6/13/2023 6/13/2023 4/10/23 6/13/2023