ML20195H448

From kanterella
Revision as of 09:40, 9 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Proposed SALP Evaluation for Facility Based on Insps Conducted During Assessment Period
ML20195H448
Person / Time
Site: Three Mile Island, 05000000
Issue date: 11/14/1986
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20195F814 List: ... further results
References
FOIA-87-830 NUDOCS 8806280294
Download: ML20195H448 (1)


Text

r

  1. %'*,, UNITED 8TATES JC L f' fr 6 -5 7 8 e NUCLEAR REGULATORY COMMISSION 5 REGION I

(

,/'j M1 PARK AVENut KING OF PRUS$1A, PENNSYLVANIA IMOG November 14, 1986 MEMORANDUM FOR: Harry B. Kister, Chief i Projects Branch No. 1, DRP FROM: Lee H. Bettenhausen, Chief .

Operations Branch, DRS

SUBJECT:

THREE MILE ISLAND, UNIT 1. DRS SALP INPUT FOR l

SALP PERIOD MAY 1, 1986 TO OCTOBER 31, 1986 '

I Attached is a proposed SALP evaluation for THI-1 based on inspections by DRS t personnel conducted during the subject period. In addition to the attached I inspections, Suresh Chaudhary, Operation Programs Section, participated in an )

inspection performed by the Performance Appraisal Branch (PAB). As a separate l SALP evaluation is being prepared by the PAB, Mr. Chaudhary's inspection '

activities are not included in the attached SALP, If you have any further questions in this regard please contact Norman Blumberg or Jon Johnson.

1 Lee H. Bettenhausen Chief, Operations Branch Division of Reactor Safety

Attachment:

As stated cc w/ attachment:

S. Ebneter, DRS L. Bettenhausen, DR!

J. Johnson, DRS N. Blumberg, DRS A. Blough, DRP R. Conte, TMI-1 SALP Notebook IDICTC3N:n in t,'J3 tc:::3w- w.w I30CWh iiMt% 2 Sefre:[-$ h..m a M0l,- eAfm$

F0lA _ )J ]

8YO6280294 88061D

$8"cvSseaa G.L/