IR 05000245/1991005

From kanterella
Revision as of 18:06, 8 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-245/91-05, 50-336/91-07 & 50-423/91-06 on 910424
ML20198C995
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/21/1991
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 9107030238
Download: ML20198C995 (2)


Text

. . ._ - - ... . . .

yI cr Oli 21 ;ggy Docket Nos. 50-245 50-336 50-423 Northeast Nuclear Energy Company ATTN: Mr. E. Senior Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Mroczka:

Subject: Inspection Nos. 50-245/91-05, 50-336/91-07, and 50-423/91-06 This refers to your letter dated May 22, 1991, in response to our letter dated April 24, 1991.

Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a future inspection of your licensed program.

Attachment 1 to your letter contains details of your security program that have been determined to be exempt from public disclosure in accordance with 10 CFR 73.21 (Safeguards Information). Therefore the enclosure will not be placed in the NRC Public Document Room and will receive limited distribution.

Your cooperation with us is appreciated.

Sincerely, Orig lna! Signed By:

Richard R. Ke rnig James H. Joyner, Chief Facilities Radiological Safety and Safeguards Branch Division of Radiation Safety

cc:

W. D. Romberg, Vice President, Nuclear Operations S. E. Scace, Nuclear Station Director H. F Haynes, Nuclear Unit Director R. M. Kacich, Manager, Nuclear Licensing D. O. Nordquist, Manager of Quality Assurance Gerald Garfield, Esquire Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Connecticut OFFICIAL RECORD COPY SG RL MILL 91-07/91-06 - 0001.0.0 9107030238 910621 OU2M1 - g l

{

PDR ADOCK 05000245 #- '

O PDR '

-

i

. .

. - _ _ ..

.

.

Northeast Nuclear Energy Company 2 49; ., y bcc:

Region I Docket Room (with concurrent is)

Management Assistant, DRMA J. Joyner, DRSS E. Kelly, DRP -i E. Wenzinger, DRP I J. Shedlosky, SRI, Haddam Neck

'

W. Raymond, SRI, Millstone l K. Brockman, EDO l D. Jaffe, PM, NRR 1 R. Arrighi, DRP

l l

l

i

.

l i

l l

'

l I ,

,

l

!

L

g O

!

RI:DRSS RI:DR 5 RI:DP

!' Dexter /mlb Keim g , Joyg,S-e 7tQ i- 06/xg/91 06/7t/91 06////91

OFFICIAL RECORD COPY SG RL MILL 91-07/91-06 - 0002.0.0
06/21/91-r - ,- -y g-m--

--_ _ _ _ _ . _ _

.

.

cenem c%ces . semen sweet. eemn connectice I NORTHEAST UTILITIES 1 .N E m . o., .vi.

$I.IN 5.I

.. w.'"

P O BOX 270 H ARTFORD. CONNECTICUT 06141-0270 1203) 665 5000 k k J . C' [.C$$',~

May 22, 1991

'" =- - Docket Nos. 50-245 50-336 C c 50-423

.,

" dE N C ~US. ..

' ' , , p-,

,,;, ,. pag- A09593

!SNDT Wec'"-- - - . - -

10CFR2.201 Re:

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:

Millstone Nuclear Power Station, Unit Nos. 1, 2, and 3 Reply to a Notice of Violation This letter transmits Northeast Nuclear Energy Company's (NNECO) resgse to con-the Notice of Violation transmitted by letter dated April 24, 1991, cerning physical security and routine safeguards inspection conducted at the Pursuant to the provisions of 10CFR2.201, Millstone Nuclear Power Station.

NNECO is hereby submitting our written statement and explanation within Attachment I 30 days of the letter which transmitted the Notice of Violation.

to this letter is NNECO's " Reply to the Notice of Violation."

The attachment to this letter contains safeguards information in accordance with 10CFR73.21(b) and, as such, NNECO requests that the attached information be withheld from public disclosure pursuant to 10CFR2.790(a).

If you have any questions, please contact us.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: E. " "

a ehhfg&*f '

BY: MMb

'

C. f. Sears Vice President Attachment cc: T. T. Martin, Region 1 Administrator D. H. Jaf fe. NRC Project Manager, Millstone Unit Nos. I and 3 G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 W. J. Raymond, Senior Resident inspector, Millstone Unit Nos. 1, 2, and 3 E. J. Mroczka, " Inspection No. 50-245/91-05, J. H. Joyner letter to (1)

50-336/91-07, and 50-423/91-06," dated April 24, 1991.

_ - _ _ _ _ _ _ - _ _ - _ _ _ _ - _ - _ _ _ _ -

_

_ _

..

-

d _. . . - ..

,

.

'-

f.Z Zic:_~i m, D"U,0; C:_ , T. . ; a an c. ;3 r,-

" " D'*N P';; ~ ~ ''~"

U.S. Nuclear Regulatory Commission A.09503/Page 2 May 22, 1991 STATE OF CONNECTICUT)

) ss. Berlin COUNTY OF HARTFORD )

Then personally appeared before me, C. F. Sears, who being duly sworn, did state that he is Vice President of Northeast Nuclear Energy Company, a Licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Licensee herein, and that the statements contained in said information are true and correct to the best of his knowledge and belief.

kym DD . E dAAG Notart Public l

l l

l l

,

_