ML20210H677

From kanterella
Revision as of 02:54, 4 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address
ML20210H677
Person / Time
Site: University of Missouri-Rolla
Issue date: 03/26/1986
From: Berkow H
Office of Nuclear Reactor Regulation
To: Bolon A
MISSOURI, UNIV. OF, ROLLA, MO
References
NUDOCS 8604030127
Download: ML20210H677 (3)


Text

.

PDL MAR 2 01986

-Docket No. 50-123 Dr. Albert E. Bolon, Director Nuclear Reactor Facility University of Missouri, Rolla Rolla, Missouri 65401

Dear Dr. Bolon:

SUBJECT:

REORGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION As a result of the recent reorganization of the Office of Nuclear Reactor Regulation, the telephone number of our Project Manager for your facility, Robert Carter, as been changed. Mr. Carter can now be reached at (301) 492-8206.

Our new Section Leader for the Non-Power Reactors and Safeguards Licensing Section is Dominic Tondi. He can be reached at (301) 492-8251. If neither Mr. Carter.or Mr. Tondi can be reached, I can be contacted at (301) 492-8795.

All correspondence should still be addressed as follows:

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk Sincerely, Wriginal Signed 44 Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR' Licensing-B cc: See next page DISTRIBUTION:

F# Central File SSPD Readidg PNoonan RCarter DTondi HBerkow hN:SSPD SPD DPWRL-B:SSPD D lthfSPD l

pan:cw D @tg r R tr DTondi }{ He V 4/86 03/y>/86 03/;f/85{ 03/)s,/86 8604030127 860326 PDR ADOCM 0 % Q 3 P

2 f'  %,

o UNITED STATES NUCLEAR REGULATORY COMMISSION

, r. j WASHINGTON, D. C. 2CSES

~s.,*****/

MAR 2 61986 Docket No. 50-123 Dr. Albert E. Bolon, Director Nuclear Reactor Facility University of Missouri, Rolla Rolla, Missouri 65401

Dear Dr. Bolon:

SUBJECT:

REORGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION As a result of the recent reorganization of the Office of Nuclear Reactor Regulation, the telephone number of our Project Nanager for your facility, Robert Carter, as been changed. Mr. Carter can now be reachedat(301)492-8206.

Our new Section Leader for the Non-Power Reactors and Safeguards Licensing SectJon is Dominic Tondi. He can be reached at (301) 492-8251. If neither Mr. Carter or Mr. Tondi can be reached I can be contacted at (301) 492-8795.

All correspondence should still be addressed as follows:

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk Sincerely,

(

l

  • r eri N. Ber ow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B cc: See next page

University of Missouri Docket No. 50-123 at Rolla cc: A-95 Coordinator Division of Planning Office of Administration P. O. Box 809 State Capitol Building Jefferson City, Missouri 65101 Dean Don L. Warner Nuclear Reactor Facility University of Missour.i-Rolla Rolla, Missouri 65401 Attorney General Supreme Court Building Jefferson City, Missouri 65101 Mr. Milan K. Straka Reactor Manager Nuclear Reactor Facility University of Missouri-Rolla Rolla, Missouri 65401

- -