Nonproprietary Statistical Combination of Uncertainties for Waterford 3
ML20215H696
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/31/1986
From:
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To:
Shared Package
ML19292G101 List:
References
CEN-343(C)-NP, NUDOCS 8610240093
Download: ML20215H696 (7)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _

ARD477M/2 WATERFORD STEAM ELECTRIC STATION UNIT 3 CEN-343(C)-NP

?

g 4 Statistical Combination of Uncertainties for Waterford-3 i

I I

October 1986 Nuclear Power Systems

! COMBUSTION ENGINEERING, INC.

Windsor, Connecticut m

Y'

'O 8610240093 861013 PDR ADOCK0500g2 P

ARD477M/3 l LEGAL NOTICE

, l This report was prepared as an account of work sponsored by (

Combustion Engineering, Inc. Neither Combustion Engineering nor any person '

acting on its behalf: t

~

a. Makes any warranty or representation, express or implied including the warranties of fitness for a particular purpose or merchantability, with respect to the accuracy, completeness, or usefulness of
  • the information contained in this report, or that the use of any information, 4 apparatus, method, or process disclosed in this report may not infringe l privately owned rights; or .
b. Assumes any liabilities with respect to the use of, or for damages resulting from the use of, any information, apparatus, method or process disclosed in this report.

t 1

  • l i l

l

  • I w -wr== w- r-w r vywmn----w----,a n-w -m y-,-yw,.w_,w-,,,.py,,,---w .m--,.7-y--w , - _ w,---,w-_,y,,,,-m-.,-y,-ww-y- ,._.--,----.e,g4,- -

-w--- . - - - - w-

. = - - - - -  : - -'

. _ . . ...=--- .z.=:--- n- - - =::Tr: -

ARD477M/4 STATISTICAL COMBINATION OF UNCERTAINTIES FOR WATERFORD-3 c.

Statistical Combination of Uncertainties (SCU) methods will be applied to the detennination of Limiting Conditions for Operation (LCO) end Limiting Safety System Setpoints (LSSS) on Linear Heat Rate (LHR) and Departure from Nucleate Boiling Ratio (DNBR) for Waterford Unit 3 beginning with Cycle 2. In the SCU program, the overall uncertainty factors for the Core Operating Limit Supervisory System (COLSS) and the Core Protection Calculator System (CPCS),

along with the minimum DNBR limit, are detennined at least at a 95/95 probability / confidence level.

The methodology used for Waterford-3 is similar to that described for SONGS Units 2 and 3 in Reference 1. Input and calculated data appropriate for Waterford-3 will be used to determine final COLSS and CPCS uncertainty factors and the minimum DNBR limit value.

Minor changes were made to the SCU methodology as part of the CPC Improvement Program (CIP, References 2 and 3). These changes, briefly discussed with NRC in November 1985, involve no substantial difference in basic methodology or results. The changes made to the SCU methodology as part of the CIP involve o

8 l

)

[ AR0477M/5 i

3.

[

0 j .

f i

l I

Figure 1 shows the revised simulator flow paths replacing Figures

'of Reference 1 Part II and Figures of Reference 1

_i _ ._.

Part III.

.i Table 1 lists uncertainty components to be considered in the Waterford-3 SCU program, grouped according to application method.

I I

4 t

- - . . - . . . . . - _ . . - - . _ . - - . . . . - - .. .. ~ .. , - , -. . . -

ARD477M/7 Table 1 Uncertainty Components Considered in Waterford-3 SCU Program A. Combined Statistically in Minimum DNBR Limit (per Reference 1, Part I)

1. Inlet flow distribution uncertainties
2. Enthalpy rise factor
3. Systematic pitch uncertainties 4 Tystenatic clad 0.D. uncertainties
5. Mc4% _ flux factor

'6. C.i+1 (HF correlation uncertainties (including NRC imposed cross-vi:lidation uncertainty)

7. TORC code uncertainty
8. Fuel rod bow penalty on DNBR
  • 9.- HID-1 grid penalty
  • i B.

i

  • applied deterministically

~ ~

. . Y . . . - . . - _ _ _ -- _ _ - _____

~

~. -. . . . _ . . _ . . - . . - . . . .

I ARD477M/8

..===

Table 1 (continued) i C. Applied Statistically to Overall Uncertainty Factors in[ ]

w

1. Radial peaking factor measurement uncertainty
2. Fuel and poison rod bow penalty on radial peaking factors
3. Computer processing uncertainties
4. Reactor core simulator modeling error
5. LHR engineering factor (CPC)

D. Appl ed Determinist 1cally to Overall Uncertainty Factors in -

1. LHR engir.eering factor (COLSS)
2. LHR axial densification factor

~

3. F
4. CFC power calibration allowance E. No Longer Applied in SCU Program 1-

,1

g ,,p s. w e d . Awhme h4 bWM " MO N - h * *O' #

Me e FIGURE 1 FLOW CHART F0R COLSS AND CPCS UNCERTAINTY ANALYSIS M

6 e

l 1

w M

?-~- -- . . . - _ AN?N .- - N

...______.._..__._1- . _ - . - . _ . . . _ _ . . . _ _ _ . . _ _ _ . _ _ _. . _ _

ARD477M/6 R_eferences

1. ' CEN-283(S)-P, " Statistical Combination of Uncertainties," Part I, June 1984, Part II and Part III, October 1984.
2. CEN-308-P-A, "CPC/CEAC Software Modifications for the CPC Improvement Program," April 1986.