Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20196K2781999-01-0404 January 1999 Summary of 981217 Meeting with Util to Discuss Plans & Activities Re Spent Fuel Storage at Plant.List of Attendees & Handouts Encl ML20236F7861998-06-30030 June 1998 Summary of 980623 Meeting W/Vynp Re Plans & Activities Related to long-term Spent Fuel Storage Plans.List of Attendees & Copies of Handouts Distributed at Meeting Encl ML20216H5751998-04-16016 April 1998 Summary of 980407 Meeting W/Vynp Re Plans & Activities Re Assurance of Adequate Net Positive Head for Certain safety- Related Pumps.List of Meeting Attendees & Copies of Meeting Handouts Encl ML20217J9111998-03-31031 March 1998 Summary of 980324 Meeting W/Representative of Vynpc Re Torus Strainer Installation,Post Installation Torus Testing & Containment Analysis Methodology.List of Attendees & Handouts Distributed at Meeting ML20198Q5211997-11-0505 November 1997 Summary of 971103 Meeting W/Vynpc in Rockville,Md on Plans & Activities Re Submittal & Implementation of Improved TS at Plant.List of Attendees,Handout of Plant Presentation & W Beckners Comments Encl ML20211P4991997-10-0909 October 1997 Summary of 970917 Meeting W/Vynp in Rockville,Maryland Re ASME Code Case N560.List of Meeting Attendees,Meeting Agenda & Meeting Handouts Encl ML20137X1131997-04-0303 April 1997 Summary of 970326 Meeting W/Vynp in Rockville,Md to Discuss Licensee Engineering,Improved Ts,Correction Actions & Plant Goals for 1997.List of Attendees & Presentation Matls Encl ML20133M4341997-01-16016 January 1997 Summary of 961223 Meeting W/Vynp Re Licensee Request to Be Briefed on Vynp Plan for Analysis in Preparation for Vermont Yankee Fuel Cycle 20 Reload.List of Attendees & Handouts Encl ML20059L8351993-11-0909 November 1993 Summary of 931025 Meeting W/Util in Bolton,Ma Re Status of Open Licensing Issues Involving Plant.Attendees Listed in Encl 1 ML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20128E7681993-02-0404 February 1993 Summary of 921216 Meeting W/Vynp in Rockville,Md Re Licensing Issues Related to Plant.List of Attendees Encl ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20248K3761989-04-10010 April 1989 Summary of Operating Reactors Events Meeting 89-014 on 890405.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams for Wk Ending 890402 Encl ML20247F1991989-03-24024 March 1989 Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20245H8011989-02-23023 February 1989 Summary of Operating Reactors Events Meeting 89-08 on 890222.Attendee List & Events Discussed & Significant Elements of Events Encl ML20235M1671989-02-17017 February 1989 Summary of Operating Reactors Events Meeting 89-07 on 890215.List of Attendees,List of Events Discussed,Summary of Events for Long Term Followup or Input to NRC Performance Indicator Program & Summary of Reactor Scrams Encl ML20196B9821988-12-0101 December 1988 Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl ML20195H0271988-11-25025 November 1988 Summary of Operating Reactor Events Meeting 88-46 on 881122 ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20206E3591988-11-10010 November 1988 Summary of Operating Reactors Events Meeting 88-44 on 881108.List of Meeting Attendees,Significant Events & Summary of Reactor Scrams Encl.One Significant Event Identified for Input to Performance Indicator Program ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML20207M0771988-10-0505 October 1988 Summary of Operating Reactors Events Meeting 88-39 on 881004.List of Attendees & Viewgraphs Encl ML20207K9461988-10-0404 October 1988 Summary of 880830 Meeting W/Util in Rockville,Md Re Fire protection-related Issues.Draft Fire Protection Engineering Evaluation, Cables on Svc Bldg Outside Wall & List of Attendees Encl ML20245D8411988-09-28028 September 1988 Summary of Operating Reactors Events Meeting 88-38 on 880927 Re Events Which Occurred Since Last Meeting on 880920 ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20154F7971988-09-15015 September 1988 Summary of 880901 QA Meeting W/Util in Rockville,Md to Discuss Rev 2 of Util Operational QA Plan for Plants.Agenda & List of Participants Encl 1999-01-04
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20196K2781999-01-0404 January 1999 Summary of 981217 Meeting with Util to Discuss Plans & Activities Re Spent Fuel Storage at Plant.List of Attendees & Handouts Encl ML20236F7861998-06-30030 June 1998 Summary of 980623 Meeting W/Vynp Re Plans & Activities Related to long-term Spent Fuel Storage Plans.List of Attendees & Copies of Handouts Distributed at Meeting Encl ML20216H5751998-04-16016 April 1998 Summary of 980407 Meeting W/Vynp Re Plans & Activities Re Assurance of Adequate Net Positive Head for Certain safety- Related Pumps.List of Meeting Attendees & Copies of Meeting Handouts Encl ML20217J9111998-03-31031 March 1998 Summary of 980324 Meeting W/Representative of Vynpc Re Torus Strainer Installation,Post Installation Torus Testing & Containment Analysis Methodology.List of Attendees & Handouts Distributed at Meeting ML20198Q5211997-11-0505 November 1997 Summary of 971103 Meeting W/Vynpc in Rockville,Md on Plans & Activities Re Submittal & Implementation of Improved TS at Plant.List of Attendees,Handout of Plant Presentation & W Beckners Comments Encl ML20211P4991997-10-0909 October 1997 Summary of 970917 Meeting W/Vynp in Rockville,Maryland Re ASME Code Case N560.List of Meeting Attendees,Meeting Agenda & Meeting Handouts Encl ML20137X1131997-04-0303 April 1997 Summary of 970326 Meeting W/Vynp in Rockville,Md to Discuss Licensee Engineering,Improved Ts,Correction Actions & Plant Goals for 1997.List of Attendees & Presentation Matls Encl ML20133M4341997-01-16016 January 1997 Summary of 961223 Meeting W/Vynp Re Licensee Request to Be Briefed on Vynp Plan for Analysis in Preparation for Vermont Yankee Fuel Cycle 20 Reload.List of Attendees & Handouts Encl ML20059L8351993-11-0909 November 1993 Summary of 931025 Meeting W/Util in Bolton,Ma Re Status of Open Licensing Issues Involving Plant.Attendees Listed in Encl 1 ML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20128E7681993-02-0404 February 1993 Summary of 921216 Meeting W/Vynp in Rockville,Md Re Licensing Issues Related to Plant.List of Attendees Encl ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20248K3761989-04-10010 April 1989 Summary of Operating Reactors Events Meeting 89-014 on 890405.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams for Wk Ending 890402 Encl ML20247F1991989-03-24024 March 1989 Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20245H8011989-02-23023 February 1989 Summary of Operating Reactors Events Meeting 89-08 on 890222.Attendee List & Events Discussed & Significant Elements of Events Encl ML20235M1671989-02-17017 February 1989 Summary of Operating Reactors Events Meeting 89-07 on 890215.List of Attendees,List of Events Discussed,Summary of Events for Long Term Followup or Input to NRC Performance Indicator Program & Summary of Reactor Scrams Encl ML20196B9821988-12-0101 December 1988 Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20195H0271988-11-25025 November 1988 Summary of Operating Reactor Events Meeting 88-46 on 881122 ML20206E3591988-11-10010 November 1988 Summary of Operating Reactors Events Meeting 88-44 on 881108.List of Meeting Attendees,Significant Events & Summary of Reactor Scrams Encl.One Significant Event Identified for Input to Performance Indicator Program ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML20207M0771988-10-0505 October 1988 Summary of Operating Reactors Events Meeting 88-39 on 881004.List of Attendees & Viewgraphs Encl ML20207K9461988-10-0404 October 1988 Summary of 880830 Meeting W/Util in Rockville,Md Re Fire protection-related Issues.Draft Fire Protection Engineering Evaluation, Cables on Svc Bldg Outside Wall & List of Attendees Encl ML20245D8411988-09-28028 September 1988 Summary of Operating Reactors Events Meeting 88-38 on 880927 Re Events Which Occurred Since Last Meeting on 880920 ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20154F7971988-09-15015 September 1988 Summary of 880901 QA Meeting W/Util in Rockville,Md to Discuss Rev 2 of Util Operational QA Plan for Plants.Agenda & List of Participants Encl ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl 1999-01-04
[Table view] |
Text
_ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _
I L
/i" c W FT l
t l January 7, 1972
( .
I i
j Horris Rosen, Chief Systems Perfromance Branch l
l SITd!ARY5,OF JAMUARY WEET1HC WITH CE AND YEINGMT varrrr ON THE ROD DROP ACCIDENT 1972 Background i' j As part of their program to study various aspects of reactor physics and core
' related transients, our BNL consultants, principally C.1411enche, have been j working on the BWR rod drop transients for the past six months and more. j q While ganarally agreeing with the CE results in most areas, one area of the j t
analysis began to emerge as highly suspect. This was the scram functions
{ used in the CE analysia, i.e. the reactivity as a function of time 1meerted by the scram bank. This involves bank worth, more importantly beak insertion l
' time, and even more importantly reactivity insertions as a immetion of bank position. The BNL work indicated that GE had been highly neo-conservative in this area, and, contrary to past CE response to questions which indicated i
little sensitivity to scram, that for the larger dropped rod worths peak enthalples would be much larger and well beyond our 280 cal /sm limit.
i i
As a result of theaa and continuing studies, conversations were initiated
{ with CE, via telephone, in November and December. These conversations in-j dicated that CE (R. C. Stirn) admitted that the scram functions used in the SAR analysis were not completely defensible but that CE had been doing new j
calculations over the past year or se (which would not be completed for
' another several months) which still give results within limits. They did not wish to present their calculations until some time in the spring (or later).
'We learned in mid-December of questions from a Vermont Yankee intervenor which could, in effect, require us to state at this time our agreement with GE on the SAR analysis methods., input and results. Vermont Yankee was in-formed of our present difficulty in being able to do this and they requested a meeting with us, CE, and our BNL consultants to discuss the situation.
Meeting CE (R. C. Stirn, J.' 'A. Woolley) did not attempt to defend the old scram func-tion with the old methods and input. Rather, they presented available re-suits from their new calculations. These results and expected results from i
8707130041 870623 I
PDR FOIA THOMAS 87-40 PDR
i l
i Horris Rosen future calculations were intended to show that CE still meets the required i
limits (e.g. 280 cal /gn) for this accident. N mew calculation invole new l analysis methods (models) and new input data and parameters. The extent of I,. the change is such that a whole new (extensive) submittal and evalestion (extensive) would be required for full acceptance. -The fellowing are some of the major new areas to be awa=f w along with some comments.
Model - The type of model is not changed, (i.e. adiabatic, point kenttics) just elaborated (e.g. 2D multigroup calculations, better data input). 2D-
- space-time calculation (e.g. TWICL) still are not done as cheeks. BHL thinks I such checks are necessary.
l l
Scram reactivity function - Emactivity insertion as a function of bank posi-i tion still must be input to the code. The shape that CE now uses, while improved over the previous linear function, BNL does not believe is correct or sufficiently conservative.
Scram time - CE is using a " measured" scram bank insertion time rather than l Isch Spec inscreion times. This in not considered to be satisfactory, i
- kod drop velocity - GE is now using drop velocities less than 3 ft/see rather than the previous 5 ft/sec. This is said to be justified by more recent tests
! than those given in the velocity limiter report. This has not been submitted
- as yet. Rasults are sensitive to this persmater.
- Rod reactivity worths - CE has calculated new and somewhat lower rod worths i
I for the various configurations of interest, e.g. the 3.8% af at 10% power rod worth has dropped to about 3.0.
I i
Based oc the hML work to date we believe that using the presently " justified"
{ input assumptions (e.g. 5'it/sec drop velocity, Tech Spec scram time, plus BNL scram function) the peak enthalpy for the 2.5a > sero power cases would i be in excess of 350 cal /sm and the 3.8op10: power (esse in excess of 500 cal /ga. It seems not unlikely that using the parameters CE would now like l to use (perhaps along with better use of voids in the calenlation) that re-L suits from " correct" calculat6 ens would be under 280 cal /sm. The timing on j the formal written presentation of this information and its evaluations is l ; at present, however, not evident. As of now there is no resolutions on how l
l 1
1 I
\ .
I 3i
- i Morris Rossa the Vermont Yankee situation is to be handled.
l Ori..D. i . -
l i H. J.1hcla n3; i
l Howard J. Richings Systema Performance Aranch Division of Imacter Standards j cc: E. C. Case DES i
S.11anauer. DR W. Minners, DEL !
l
- Distribution
i Suppl l DR Reading
- DRS Reading SPB Reading bec
- H. J. Richings I
t i
I l
l i 1
}
l t
DRS SPB ERICHINGS: pad 1/7/72
_ - - - _ _ _ - - - - _