Dpcket No. 50-271 November 9, 1993
]
LICENSEE: Vermont Yankee Nuclear Power Corporation FACILITY: Vermont Yankee Nuclear Power Station l
SUBJECT:
SUMMARY
OF OCTOBER 25, 1993, MEETING WITH REPRESENTATIVES OF VERMONT YANKEE NUCLEAR POWER CORPORATION On October 25, 1993, pursuant to notice, the NRC staff met with representatives of Vermont Yankee Nuclear Power Corporation (the licensee) at Bolton, Massachusetts, to discuss the status of open licensing issues regarding the Vermont Yankee Nuclear. Power Station. A list of attendees is provided as Enclosure 1.
The licensee's list of licensing issues, which was handed'out at the meeting, is provided as Enclosure 2.
t Regarding reactor vessel water level instrumentation, the licensee indicated l
that it had installed a reference leg backflush modification to the system during the recently completed refueling outage, and would provide a letter to j
the NRC staff to that effect in accordance with NRC Bulletin 93-03.
l The licensee has three proposed changes to the plant Technical Specifications-l (TS) under review by the NRC staff. These proposed changes are listed in The licensee noted that Proposed Change 170 references a site j
diagram in the Final Safety Analysis Report (FSAR).
The diagram will be updated to reflect site area boundaries as defined in the new 10 CFR Part 20 regulations.
The change to TS is intended to reference the new FSAR page which has not yet been entered. The staff requested that the licensee. provide a draft of the revised FSAR page on the docket as a supplement to Proposed Change-170. The staff will consider the draft FSAR page in its evaluation of the proposed TS change and address it, as appropriate, in the staff's safety evaluation.
The licensee also indicated that it is considering the need for three additional TS change proposals which are listed in Enclosure 2.
Original - signed by:
Daniel H. Dorman, Project Manager Project Directorate I-3 Division of Reactor Projects - I/II
Enclosures:
1.
List of Attendees 2.
Licensee's Handout cc w/ enclosures:
See next page 0FFICE PDI-BM PDI-3:PM PDI-3:D /
i) s NAME-~
Sliitle DDorman:[t WButler s
p ?E il /5 /93 1//4 /93 l)/6/93 L
OFFICIAL RECORD COPY DOCUMENT NAME: G:\\VYMMTGSUM.WP i
NRC FR.E CBmR COPY 9311170434 931109 I
PDR ADDCK 05000271 1'
P PDR I-g
i 4
l***%,
?t UMTED STATES
. [Ih j
i NUCLEAR REGULATORY COMMISSION 6
WASHINGTON D C. 20555-0001 54 O
%, [,,. #
November 9, 1993 Docket No. 50-271 LICENSEE: Vermont Yankee Nuclear Power Corporation FACILITY: Vermont Yankee Nuclear Power Station
SUBJECT:
SUMMARY
OF OCTOBER 25, 1993, MEETING WITH REPRESENTATIVES OF VERMONT YANKEE NUCLEAR POWER CORPORATION On October 25, 1993, pursuant to notice, the NRC staff niet with i
representatives of Vermont Yankee Nuclear Power Corporation (the licensee) at Bolton, Massachusetts, to discuss the status of open licensing issues regarding the Vermont Yankee Nuclear Power Station. A list of attendees is provided as Enclosure 1.
The licensee's list of licensing issues, which was handed out at the meeting, is provided as Enclosure 2.
Regarding reactor vessel water level instrumentation, the licensee indicated that it had installed a reference leg backflush modification to the system during the recently completed refueling outage, and would provide a letter to the NRC staff to that effect in accordance with NRC Bulletin 93-03.
The licensee has three proposed changes to the plant Technical Specifications (TS) under review by the NRC staff. These proposed changes are listed in.
The licensee noted that Proposed Change 170 references a m e diagram in the Final Safety Analysis Report (FSAR). The diagram will be updated to reflect site area boundaries as defined in the new 10 CFR Part 20 regulations. The change to TS is intended to reference the new FSAR page which has not yet been entered. The staff requested that the licensee provide a draft of the revised FSAR page on the docket as a supplement to Proposed Change 170.
The staff will consider the draft FSAR page in its evaluation of the proposed TS change and address it, as appropriate, in the staff's safety evaluation.
The licensee also indicated that it is considering the need for three additional TS change proposals which are listed in Enclosure 2.
) cQ,
~.
~
Daniel H. Dorman, Project Manager i
Project Directorate I-3 Division of Reactor Projects - I/II
Enclosures:
1.
List of Attendees i
2.
Licensee's Handout cc w/ enclosures:
See next page
Vermont Yankee Nuclear Power. Station t
cc:
Mr. Jay Thayer, Vice President G. Dana Bisbee, Esq.
Yankee Atomic Electric Company Office of the Attorney General 580 Main Street Environmental Protection Bureau Bolton, Massachusetts 01740-1398 State House Annex 25 Capitol Street Regional Administrator, Region I Concord, New Hampshire 03301-6937 U. S. Nuclear Regulatory Commission 475 Allendale Road Resident Inspector King of Prussia, Pennsylvania 19406 Vermont Yankee Nuclear Power Station U.S. Nuclear Regulatory Commission R. K. Gad, III P. O. Box 176 Ropes & Gray Vernon, Vermont 05354 One International Place Boston, Massachusetts 02110-2624 Chief, Safety Unit Office of the Attorney General Mr. Richard P. Sedano, Commissioner One Ashburton Place,19th Floor Vermont Department of Public Service Boston, Massachusetts 02108 120 State Street, 3rd Floor Montpelier, Vermont 05602 Mr. David Rodham, Director Massachusetts Civil Defense Agency Public Service Board 400 Worcester Rd.
State of Vermont P.O. Box 1496 120 State Street framingham, Massachusetts 01701-0317 i
Montpelier, Vermont 05602 ATTN: James Muckerheide Chairman, Board of Selectmen Mr. Raymond N. McCandless Town of Vernon Vermont Division of Occupational Post Office Box 116 and Radiological Health Vernon, Vermont 05354~0116 Administration Building Montpelier, Vermont 05602 Mr. J. P. Pelletier, Vice President Vermont Yankee Nuclear Power Mr. L. A. Tremblay Corporation Senior Licensing Engineer Ferry Road Vermont Yankee Nuclear Power Brattleboro, Vermont 05301 Corporation 580 Main Street Bolton, Massachusetts 01740-1398 Mr. Robert J. Wanczyk, Plant Manager Vermont Yankee Nuclear Power Station P.O. Box 15.
Sovernor Hunt Road Vernon, VT 65354 i
Mr. Donald A. I id, Vice President Operations Vermont Yankee Nuclear Power Corporation Ferry Road Brattleboro, Vermont 05301 4
l
, DISTRIBUTION:
(w/ enclosures)
< Docket; Film-NRC & Local PDRs PDI-3 Reading File JLinville,.RI DDorman DISTRIBUTION:
(w/o enclosure 2)
- 1. Murley/FHiraglia L. J. Callan S. Varga J. Calvo W. Butler D. Dorman S. Little OGC E. Jordon ACRS (10)
D. Wheeler, EDo R. Cooper, RI J. Linville, RI i
i L
I h
i 1
i
i i
LIST'0F ATTENDEES j
MEETING WITH VERMONT YANKEE NUCLEAR POWER CORPORATION i
J REGARDING VERMONT YANKEE NUCLEAR POWER STATION i
BOLTON. MASSACHUSETTS OCTOBER 25. 1993 u_
.~
NAME AFFILIATION TITLE
]
1 Dan Dorman NRC/NRR/PDI-3 Pioject Manager Len Tremblay Yankee Atomic Electric Senior Licensing Engineer Company - VY Project 4
Dean Porter Vermont Yankee Nuclear Engineering Project j
Power Corporation Supervisor l
I 1
i t
1 i
I
+
b OCTOBER 25.1993 NRC MEETING AT BOLTON l
VERMONT YANKEE LICENSING ISSUES i
GL 92-04 / Bull. 93-03 Reactor Water Level Instrumentation
- Proposed Change 168, EDG Fast Starts
- Proposed Change 170, New Part 20, Rad. Protection (incl. associated FSAR changes)
- Proposed Change 171, GL 88-01 Leakage in Containment
- Reload submittals (COLR / CPAR)
- Byproducts Material License renewal application 10CFR20.302 Application for Chem. Line Sink Drain
- SWSOPI Stability
- Reg. Guide 1.97 Neutron Monitoring (NEDO comparison and proposed TS change)
- Station Blackout / Vernon tie issues
- Generic Letter 89-10 MOV Program
- PC 147 ATWS SLC/ARI updated pages
- Jet pump surveillance proposed TS change
- Core spray sparger dp proposed TS change
- AOG isolation functional test proposed TS change k
b i
..