Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20196J4111999-06-30030 June 1999 Summary of 990524 Meeting with Util in Rockville,Md to Discuss Technical Issues Re Proposed Rerack of Spent Fuel Pool at Plants.List of Attendees & Handouts Encl ML20198G5501998-12-18018 December 1998 Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl ML20155H3931998-11-0202 November 1998 Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20151X0011998-09-10010 September 1998 Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl ML20237E0271998-08-25025 August 1998 Summary of 980625 Meeting W/Entergy Operations,Inc to Discuss Bulletin 96-003 Re Installation of ECCS Suction Strainer in Ninth Refueling Outage for Plant.List of Attendees & Licensee Handout ML20236M0501998-07-0808 July 1998 Summary of 980702 Meeting W/Entergy Operations,Inc to Discuss Review Status of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20236F8171998-06-24024 June 1998 Summary of 980331 Meeting W/Util to Brief NRC on Licensee Risk Mgt of Upcoming Ninth Refueling Outage.List of Attendees & Handouts Encl ML20217K5141998-04-24024 April 1998 Summary of 980416 Meeting W/Entergy Corp Re Standardization of site-specific Security Plans.List of Meeting Attendees & Agenda for Meeting Encl ML20217K3461998-04-24024 April 1998 Summary of 980401 Meeting W/Entergy Operations,Inc Re Licensing Issues & Regulatory Performance Efficiencies.List of Attendees & Agenda for Meeting Encl ML20217H8081998-03-31031 March 1998 Summary of 980306 Meeting W/Util in Rockville,Md Re Status of Licensing Issues for Byron Station,Units 1 & 2 & Braidwood Station,Units 1 & 2.List of Attendees Encl ML20217F4811998-03-26026 March 1998 Summary of 980319 Meeting W/Licensee to Discuss Status of Development of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20216C6471998-03-0505 March 1998 Summary of 980123 Meeting W/Entergy Operations,Inc Re EP Changes Being Considered by Licensee.List of Meeting Attendees,Meeting Agenda & Info Provided by Licensee at Meeting in Handout Encl ML20203B5741998-02-11011 February 1998 Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl ML20198A3731997-12-0404 December 1997 Summary of 971119 Meeting W/Westinghouse Owners Group Re Completion of WOG Topical Rept WCAP-14572,rev 1,conclusions from Results of Surry Pilot Plant Submittal & Schedule for Approving Surry Submittal & Associated WCAP ML20212G8521997-10-29029 October 1997 Summary of 971022 Meeting W/Entergy Svcs,Inc Re Development & Implementation of Common or Std QAP for All Sites.List of Meeting Attendees & Viewgraphs Encl ML20217E0131997-09-29029 September 1997 Trip Rept of 970825-26 Visit to Plant,Unit 1 for Interviews in Preparation of Salp.Agenda for Interviews Encl ML20211P3421997-09-23023 September 1997 Summary of 970904 Meeting W/Commonwealth Edison Co in Rockville,Md Re Methodology for Calculating Radiation Doses in Control Room & at Eab & LPZ in Event of Msb Outside Containment.List of Attendees & Licensee Presentation Encl ML20198R3481997-09-0404 September 1997 Trip Rept of 961121 Visit to GGNS to Discuss Implementation Methodologies Employed for Graded Aq in Procurement Area ML20210Q1281997-08-25025 August 1997 Summary of 970723 Meeting W/Util in Rockville,Md Re Util Assessment of Spring 1997 Eddy Current Insp of Plant SG Tubes.List of Attendees & Handouts Presented Encl ML20141H3661997-07-17017 July 1997 Summary of 970710 Meeting W/Util to Discuss Licensee Emergency Plan Change 28.001-95 & to Determine If Change Reduces Effectiveness of Emergency Plan for Plant,Unit 1. List of Attendees,Agenda & Info Provided by Licensee Encl ML20141F3641997-06-27027 June 1997 Summary of 970430 Meeting W/Licensee in Rockville,Md to Discuss Various Aspects of SG Eddy Current Insp Conducted at Plants During Spring 1997 Refueling Outage.List of Attendees & Licensee Handouts Encl ML20137U1331997-04-10010 April 1997 Summary of 970325 Meeting W/Util in Clariborne County,Ms to Discuss Entergy Operations,Inc MOV Thrust Methodology Used for GL 95-07 for Plant.List of Attendees & Info Provided by NRC Staff Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20138L0741997-02-18018 February 1997 Summary of 970123 Meeting W/Commonwealth Edison Co to Discuss Plant Amend Request to Convert Current TSs ML20134M3841997-02-13013 February 1997 Summary of 970128 Meeting W/Util to Discuss Program to Dispose of Weapons Grade Pu Through Use as Mixed Oxide Fuel. List of Attendees & Matl Used in Presentation Encl ML20134G7011997-02-0707 February 1997 Summary of 970122 Meeting W/Util Re Program for Replacement of SG at Licensee Facilities.List of Attendees & Matl Used in Presentation Encl ML20133J0641997-01-13013 January 1997 Summary of 960821 Meeting W/Comed to Discuss Status of SG Replacement Program W/Nrc Staff.List of Attendees & Util Presentation Encl ML20132D1421996-12-17017 December 1996 Summary of 960827 Meeting W/Util in Rockville,Md Re Graded Quality Assurance Initiative at Facility.W/Attendees List, Summary of Licensee Presentation & Licensee Expert Panel Guidance Document ML20149M3611996-12-11011 December 1996 Summary of 96111 Meeting W/Licensee in Rockville,Md to Discuss Comments Developed in Response to NRC Advance Notice of Proposed Rulemaking on Financial Assurance Requirements for Decommissioning Nuclear Reactors.List of Attendees Encl ML20149M3131996-12-10010 December 1996 Summary of 961114 Meeting W/Representives of CE in Rockville,Md to Discuss Status of Ongoing Braidwood,Unit 1, SG Tube Insp.List of Attendees & Slides Encl ML20134N5661996-11-21021 November 1996 Summary of 961003 Meeting W/Licensee in Rockville,Md to Discuss Licensee Upcoming Eighth Refueling Outage for Ggns,Unit 1 ML20134M6611996-11-21021 November 1996 Summary of 961114 Meeting W/Listed Licensees in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSARs for Four Nuclear Reactor Sites.List of Attendees & Licensee Handout Encl ML20129F9431996-10-25025 October 1996 Summary of 961004 Meeting W/Representatives of CE in Rockville,Md to Discuss Technical Basis for Licensee Pending Proposal to Delete Braidwood Unit 1 mid-cycle SG Eddy Current Insp.List of Attendees & Matls Discussed Encl ML20129G5261996-07-31031 July 1996 Summary of ACRS Plant Operations Subcommittee Meeting on 960521 to Review Proposed Rule on Shutdown Operations & Associated Reg Guide as Well as Studies on Shutdown Risk at Surry & Grand Gulf Nuclear Plants ML20129G8501996-07-0505 July 1996 Summary of ACRS Joint Subcommittee Matl & Metallurgy & Severe Accidents Meeting on 960603-04 to Gather Info on Status of Activities Associated W/Development of Proposed Rule Re SG Integrity ML20059C4041993-12-27027 December 1993 Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Licensee Proposed Changes to Security Plans for Plant,Units 1 & 2.List of Attendees Encl ML20058P4491993-12-15015 December 1993 Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md Re 931021 Submittal of Proposed Alternative to 10CFR50.55a(f) & (g),10-Year Inservice Insp & Inservice Testing Update. List of Attendees Encl ML20058K1301993-11-29029 November 1993 Summary of Operating Reactors Events Meeting 93-44 on 931124 ML20058G3081993-11-19019 November 1993 Summary of Operating Reactors Events Meeting 93-43 on 931117 ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056H5721993-08-0505 August 1993 Summary of Operating Reactors Events Meeting 93-28 on 930728 ML20056D8341993-05-26026 May 1993 Summary of Operator Reactors Event Meeting 93-18 on 930519 ML20059C7311993-01-30030 January 1993 Summary of 391st ACRS Meeting on 921105-07 in Bethesda,Md Re NRC Regulatory Analysis Guidelines & Reactor Operating Events & Occurrences,Shearon Harris Plant Loss of High Head SI & LaSalle Overfill Due to Failure of MFW Pumps to Trip ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20062H4811990-11-28028 November 1990 Summary of 901023 Meeting W/Util Re Control Room Emergency Filtration Sys.Proposed Change to TS 3/4.7.2 & Handout Encl ML20056B4161990-08-17017 August 1990 Summary of 900615 Meeting W/Licensee at Site to Discuss Licensing Activities.List of Attendees,Meeting Agenda, Handout & Licensee Comments on Draft Safety Evaluation of Fire Protection Program Encl ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E2961989-09-0808 September 1989 Summary of Operating Reactors Events Meeting 89-32 on 890906.One Significant Event for Input Into NRC Performance Indicator Program Identified.List of Attendees Encl 1999-08-04
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20196J4111999-06-30030 June 1999 Summary of 990524 Meeting with Util in Rockville,Md to Discuss Technical Issues Re Proposed Rerack of Spent Fuel Pool at Plants.List of Attendees & Handouts Encl ML20198G5501998-12-18018 December 1998 Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl ML20155H3931998-11-0202 November 1998 Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20151X0011998-09-10010 September 1998 Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl ML20237E0271998-08-25025 August 1998 Summary of 980625 Meeting W/Entergy Operations,Inc to Discuss Bulletin 96-003 Re Installation of ECCS Suction Strainer in Ninth Refueling Outage for Plant.List of Attendees & Licensee Handout ML20236M0501998-07-0808 July 1998 Summary of 980702 Meeting W/Entergy Operations,Inc to Discuss Review Status of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20236F8171998-06-24024 June 1998 Summary of 980331 Meeting W/Util to Brief NRC on Licensee Risk Mgt of Upcoming Ninth Refueling Outage.List of Attendees & Handouts Encl ML20217K5141998-04-24024 April 1998 Summary of 980416 Meeting W/Entergy Corp Re Standardization of site-specific Security Plans.List of Meeting Attendees & Agenda for Meeting Encl ML20217K3461998-04-24024 April 1998 Summary of 980401 Meeting W/Entergy Operations,Inc Re Licensing Issues & Regulatory Performance Efficiencies.List of Attendees & Agenda for Meeting Encl ML20217H8081998-03-31031 March 1998 Summary of 980306 Meeting W/Util in Rockville,Md Re Status of Licensing Issues for Byron Station,Units 1 & 2 & Braidwood Station,Units 1 & 2.List of Attendees Encl ML20217F4811998-03-26026 March 1998 Summary of 980319 Meeting W/Licensee to Discuss Status of Development of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20216C6471998-03-0505 March 1998 Summary of 980123 Meeting W/Entergy Operations,Inc Re EP Changes Being Considered by Licensee.List of Meeting Attendees,Meeting Agenda & Info Provided by Licensee at Meeting in Handout Encl ML20203B5741998-02-11011 February 1998 Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl ML20198A3731997-12-0404 December 1997 Summary of 971119 Meeting W/Westinghouse Owners Group Re Completion of WOG Topical Rept WCAP-14572,rev 1,conclusions from Results of Surry Pilot Plant Submittal & Schedule for Approving Surry Submittal & Associated WCAP ML20212G8521997-10-29029 October 1997 Summary of 971022 Meeting W/Entergy Svcs,Inc Re Development & Implementation of Common or Std QAP for All Sites.List of Meeting Attendees & Viewgraphs Encl ML20211P3421997-09-23023 September 1997 Summary of 970904 Meeting W/Commonwealth Edison Co in Rockville,Md Re Methodology for Calculating Radiation Doses in Control Room & at Eab & LPZ in Event of Msb Outside Containment.List of Attendees & Licensee Presentation Encl ML20210Q1281997-08-25025 August 1997 Summary of 970723 Meeting W/Util in Rockville,Md Re Util Assessment of Spring 1997 Eddy Current Insp of Plant SG Tubes.List of Attendees & Handouts Presented Encl ML20141H3661997-07-17017 July 1997 Summary of 970710 Meeting W/Util to Discuss Licensee Emergency Plan Change 28.001-95 & to Determine If Change Reduces Effectiveness of Emergency Plan for Plant,Unit 1. List of Attendees,Agenda & Info Provided by Licensee Encl ML20141F3641997-06-27027 June 1997 Summary of 970430 Meeting W/Licensee in Rockville,Md to Discuss Various Aspects of SG Eddy Current Insp Conducted at Plants During Spring 1997 Refueling Outage.List of Attendees & Licensee Handouts Encl ML20137U1331997-04-10010 April 1997 Summary of 970325 Meeting W/Util in Clariborne County,Ms to Discuss Entergy Operations,Inc MOV Thrust Methodology Used for GL 95-07 for Plant.List of Attendees & Info Provided by NRC Staff Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20138L0741997-02-18018 February 1997 Summary of 970123 Meeting W/Commonwealth Edison Co to Discuss Plant Amend Request to Convert Current TSs ML20134M3841997-02-13013 February 1997 Summary of 970128 Meeting W/Util to Discuss Program to Dispose of Weapons Grade Pu Through Use as Mixed Oxide Fuel. List of Attendees & Matl Used in Presentation Encl ML20134G7011997-02-0707 February 1997 Summary of 970122 Meeting W/Util Re Program for Replacement of SG at Licensee Facilities.List of Attendees & Matl Used in Presentation Encl ML20133J0641997-01-13013 January 1997 Summary of 960821 Meeting W/Comed to Discuss Status of SG Replacement Program W/Nrc Staff.List of Attendees & Util Presentation Encl ML20132D1421996-12-17017 December 1996 Summary of 960827 Meeting W/Util in Rockville,Md Re Graded Quality Assurance Initiative at Facility.W/Attendees List, Summary of Licensee Presentation & Licensee Expert Panel Guidance Document ML20149M3611996-12-11011 December 1996 Summary of 96111 Meeting W/Licensee in Rockville,Md to Discuss Comments Developed in Response to NRC Advance Notice of Proposed Rulemaking on Financial Assurance Requirements for Decommissioning Nuclear Reactors.List of Attendees Encl ML20149M3131996-12-10010 December 1996 Summary of 961114 Meeting W/Representives of CE in Rockville,Md to Discuss Status of Ongoing Braidwood,Unit 1, SG Tube Insp.List of Attendees & Slides Encl ML20134N5661996-11-21021 November 1996 Summary of 961003 Meeting W/Licensee in Rockville,Md to Discuss Licensee Upcoming Eighth Refueling Outage for Ggns,Unit 1 ML20134M6611996-11-21021 November 1996 Summary of 961114 Meeting W/Listed Licensees in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSARs for Four Nuclear Reactor Sites.List of Attendees & Licensee Handout Encl ML20129F9431996-10-25025 October 1996 Summary of 961004 Meeting W/Representatives of CE in Rockville,Md to Discuss Technical Basis for Licensee Pending Proposal to Delete Braidwood Unit 1 mid-cycle SG Eddy Current Insp.List of Attendees & Matls Discussed Encl ML20129G5261996-07-31031 July 1996 Summary of ACRS Plant Operations Subcommittee Meeting on 960521 to Review Proposed Rule on Shutdown Operations & Associated Reg Guide as Well as Studies on Shutdown Risk at Surry & Grand Gulf Nuclear Plants ML20129G8501996-07-0505 July 1996 Summary of ACRS Joint Subcommittee Matl & Metallurgy & Severe Accidents Meeting on 960603-04 to Gather Info on Status of Activities Associated W/Development of Proposed Rule Re SG Integrity ML20059C4041993-12-27027 December 1993 Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Licensee Proposed Changes to Security Plans for Plant,Units 1 & 2.List of Attendees Encl ML20058P4491993-12-15015 December 1993 Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md Re 931021 Submittal of Proposed Alternative to 10CFR50.55a(f) & (g),10-Year Inservice Insp & Inservice Testing Update. List of Attendees Encl ML20058K1301993-11-29029 November 1993 Summary of Operating Reactors Events Meeting 93-44 on 931124 ML20058G3081993-11-19019 November 1993 Summary of Operating Reactors Events Meeting 93-43 on 931117 ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056H5721993-08-0505 August 1993 Summary of Operating Reactors Events Meeting 93-28 on 930728 ML20056D8341993-05-26026 May 1993 Summary of Operator Reactors Event Meeting 93-18 on 930519 ML20059C7311993-01-30030 January 1993 Summary of 391st ACRS Meeting on 921105-07 in Bethesda,Md Re NRC Regulatory Analysis Guidelines & Reactor Operating Events & Occurrences,Shearon Harris Plant Loss of High Head SI & LaSalle Overfill Due to Failure of MFW Pumps to Trip ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20062H4811990-11-28028 November 1990 Summary of 901023 Meeting W/Util Re Control Room Emergency Filtration Sys.Proposed Change to TS 3/4.7.2 & Handout Encl ML20056B4161990-08-17017 August 1990 Summary of 900615 Meeting W/Licensee at Site to Discuss Licensing Activities.List of Attendees,Meeting Agenda, Handout & Licensee Comments on Draft Safety Evaluation of Fire Protection Program Encl ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E2961989-09-0808 September 1989 Summary of Operating Reactors Events Meeting 89-32 on 890906.One Significant Event for Input Into NRC Performance Indicator Program Identified.List of Attendees Encl ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified 1999-08-04
[Table view] |
Text
.
SEP aa upp
&S MEMORANDUM FOR:
Charles E. Rossi, Director Division of Operational Events Assessment FROM: Johns P. Jaudon, Acting Chief Events Assessment Branch Division of Operational Events Assessment SU9 JECT: THE OPERATING REACTORS EVENTS MEETING SEPTEMBER 27, 1988 MEETING 88-38 On September 27, 1988, an, Operating Reactors Events meeting (88 38) was held to- h brief senior managers from NRR, OSP, AE00, RES, Commission Staff, and Regional (
Offices on events which occurred since our last meeting on September 20, 1988. (
j The list of-attendees is included as Enclosure 1.
l
..' j The events discussed and the significant elements of these events are presented in Enclosure 2. Enclosure 3 presents a summary of reactor scrams. Four 'l significant events were identified for input to NRC's performance indicator program. One event was suggested for long-term followup.
h 'I'rY QD 'y t(OC rD - 4 91/ Johns P. Jaudon, Acting Chief N'M Events Assessment Branch 9 '4/ V Division of Operational Events Assessment
Enclosures:
As stated cc w/ Encl.:
See Next Page DISTRIBUTION
.sCentral File .
EAB Reading File '
Circulating Copy, EAB Staf f 4 MLReardon, EAB 00udinot, EAB } h) / 'iJr 8
K Igore, SECY g
/ Is / N
,l ph A: : : : : q q {,
OFC
.i. .....
,rcon :J Jau n : : :
NA
.. .:.....g......:............:............:............:............:............:...........
DATE :09/24/88 :09/ff/88 : : ,_
j _ l0FFICIAL~ RECORD' COPY, s
i ~,
I. B810070234 880928
%"PDR ORG NRRB i PNU
. . . __ - . _ _ . _ _ . _ m.-___ ._________.___._..__m __m ___ _ _ _ _ _ _ . _ _ _ _ _
H; y _
T. Murley, 12G-1B B. Buckley, 14B-20 F.'Miraglia,12G-1B E. Adensam, 14B-20 J. Sniezek, 12G-1B L. 01shan,13'J-1 E. Jordan, AE0D 0. Muller, 130-1 l,
J. Taylor,17G-13 R. Lo, 148-20 E. Beckjord, NL-007 L. Kintner J14B-20 W. Russell. R1 C. Patel, 14H-22 J. N.-Grace, Rll H. Berkow, 14H-22 B. Davis, R!l!
R. D. Martin, RIV J. B. Martin, RV W. Kane, R1 L. Reyes, Rll *-
E. Greenman, Rlli L. Callan, RIV
- 0. Kirsch,-RV' ~
S. Varga, 14E-4
- D. Crutchfield, 13A-2 B. Boger, 14A-2 G. Lainas, 14H-3 G. Holahan, 13H-4 L. Shao, 8E-2 ;
J. Partlow, 70-24 B. Grimes, 9A-2 F. Congel. 10E-4 E. Weiss, AE00 T. Martin, E00 J. Guttmann, SECY A. Thadani, 7E-4 S. Rubin, AE00 J. Forsyth, INPO R. Barrett 10E-2 M. Harper, MNBB 4210 W. Lanning, MhBB 3302 l
____._____m._ _ _ _ . _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ . _ _ _ _ _ _ . _ _ . _ _ _ _ . _ _ . _ _ . . _ _ _ . _ _
4 4
/ %, UNITED STATES g NUCLEAR REGULATORY COMMISSION
[r, wAsumTom, c. c. asses j
\..../
SEPna ng MEMORANDUM FOR:
Charles E. Rossi, Director Division of Operational Events Assessment FROM: Johns P. Jaudon, Acting Chief Events Assessment Branch Division of Operational Events Assessment
SUBJECT:
THE OPERATING REACTORS EVENTS MEETING September 27, 1988- MEETING 88-38 On September 27, 1988, an Operating Reactors Events meeting (88-38) was held to brief senior managers from NRR, OSP, AE00, RES, Conunission Staf f, and Regional Of fices on events which occurred since our last meeting on September 20, 1988.
The list of attendees is included as Enclosure 1.
The events discussed and the significant elements of these events are presented in Enclosure 2. Enclosure 3 presents a sursary of reactor scrams. Four l
significant events were identified for input to NRC's performance indicator program. One event was suggested for long-term followup.
f e , m
/Johs'.Jud . Acting h ief L Events Ass s nt Branch Division of Operational Events Assessment
Enclosures:
As stated cc w/ Encl.:
See hext Page l
1 i
o
. i!
ENCLOSURE 1 l
LIST OF ATTENDEES OPERATING REACTORS EVENTS BRIEFING (88-38)
September 27, 1988 ORGANIZATION NAME ORGANIZATION NAME C.E. Rossi NRR/00EA- S. Varga NRR/DRP J. Zwolinski NRR/DLPQ W. Minners RES/DRPS E. Adensam NRR/DRP L.L. Kintner NRR/P02-1
- v. Benaroya AEOD/DSP R. Auluck OSP B. Buckley NRR/DRPR W. Troskoski EDO D. Fischer NRR/DOEA A. Vietti-Cook OCM/LZ D.R. Muller NRR/PDill-2 L. Olshan NRR/PDl!!-2 J.W. Thompson NRR/DOEA T.B. Silko AE00 P.L. Eng NRR/00EA W. Lyon NRR/SXRB P. Baranowsky NRR/00EA C. Schulten NRR/00EA l
i
/
OPERATING REACTORS EVENTS BRIEFING 88-38 EVENTS ASSESSMENT BRANCH LOCATION: _12-B-ll WHITE FLINT TUESDAY, SEPTEMBER 27, 1988, 11:00 A.M.
I HARRIS LOSS OF RHR DUE 10 MAINTENANCE ERROR BYRON UNIT 1 IMPROPERLY MONITORED REACTOR VESSEL INVENTORY LOSS DURiNG REFUEllNG HARRIS AND ROBINSON ENVIRONMENTAL QUALIFICATION .
PROBLEMS OF TARGET ROCK VALVES l
TDI INTERCOOLER ADAPfER FAILURE
' GRAND GULF 1 ON DIESEL
-SURRY 2 1HINNING 0F MAIN FEE 0 WATER PIPING
88-38 HARRIS UNIT 1 LOSS.0F_RHR DUE TO MAINTENANCE ERROR SEPTEMBER 21, 1988
!LR0lLLM SUDDEN LOSS OF RHR WHEN THE "A" RHR PUMP LOST POWER DUE TO A MAINTENANCE ERROR, THE *A" EDG WAS OUT-0F-SERVICE AND THE
- B" TRAIN OF RHR WAS OPERABLE, CAUSE THE "A" TRAIN ELECTRICAL DISTRIBUTION WAS INADVERTENTLY DEENERGl2ED (LOST ST ARTUP TRANSFORMER "A") DURING RELAY CREW MAINTENANCE SIGNIFICANCE LOSS OF BOTH TRAINS OF RHR (THE "A" TRAIN EMERGENCY POWER SUPPLY WAS ;
l TAGGED OUT) FOR APPR0XIMATELY ONE HOUR COULD HAVE RESULTED IN BOILING lN THE VESSEL IF ALTERNATE HEAT REMOVAL WERE NOT AVAILABLE.
DISCUSSION o RHR TRAIN "A" WAS LOST DUE TO THE ELECTRICAL DISTRIBUTION FOR' TRAIN "A" INADVERTENTLY DEENERGl2ED o RHR TRAIN "B" START TOOK 12 MIN TO BRING UP TO ONLINE TEMPERATURE (NORMAL) o THE "A" EDG WAS TAGGED OUT-0F-SERVICE o Rx VESSEL HEATUP WAS 10' F FROM (96* TO 106*F) o THE LICENSEE HAD PERFORMED D/G MAINTENANCE ON BOTH DIESELS WHILE IN MODE 5 ( WITH LOOP NOT FILLED) TRAIN "B" EDG ON 9/20; TRAIN "A" EDG ON 9/21 FOLLOWUP o THE FORTHCOMING GL ON LOSS OF RHR PROBABLY WOULD NOT HAVE PREVENTED THIS EVENT FROM OCCURRING o THE R1, REGION, AND EAB ARE FOLLOWING THIS EVENT TO UNDERSTAND T/S COMPLl ANCE FOR COLD SHUTDOWN WITH LOOPS NOT FILLED o POSSIBLE GENERIC MISUNDERSTANDING 0F T/S OPERABILITY STATEMENT WITH REGARD TO SAFETY-RELATED EQUIPMENT WITH A LOSS OF THE EMERGENCY POWER SUPPLY CONTACT: J. THOMPSON (301) 492-1175
REFERENCE:
50,72 #13505 l I
88-38 BYRON UNIT 1 IMPROPERLY MONITORED REACTOR VESSEL INVENTORY LOSS DURING REFUEllNG SEPTEMBER 19, 1988 PROBLEM LOSS OF SHUTDOWN COOLING TO UNIT 1 FOR APPR0XIMATELY 15 MINUTES, CAUSE OPERATORS COMMENCED VESSEL DRAIN DOWN ACTIVITIES WITHOUT QUANTITATIVE REACTOR VESSEL WATER LEVEL INSTRUMENT ATION, VISUAL INDICATION OF VESSEL LEVEL WAS NOT INDICATIVE OF ACTUAL LEVELS. ,
SAFETY SIGNIFICANCE UNMONITORED REACTOR VESSEL DRAIN DOWN CAN RESULT IN CAVITATION OF RHR PUMPS THEREBY REMOVING CORE DECAY HEAT REMOVAL CAPABILITY, DISCUSSION o 1A RHR PUMP PROVIDING SHUTDOWN COOLING AT APPROX 3000 GPM.
l O LICENSEE COMMENCED CAVITY DRAIN DOWN USING THE IB RHR PUMP TO PERFORM MINOR MAINT.ENANCE ON REACTOR VESSEL FLANGE, o LICENSEE THOUGHT TYGON TUBING LEVEL INDICATION UNREllABLE AND OPTED TO HAVE AN EQUIPMENT ATTENDANT VISUALLY MONITOR WATER LEVEL FROM REFUELING FLOOR, (Rx VESSEL HEAD REMOVED.)
o EA OBSERVED MINIMAL LEVEL CHANGE: HOWEVER, ACTUAL WATER LEVEL l ESTIMATED TO HAVE DROPPED TO MID-PLANE OF HOT LEG.
0 1A RHR PUMP EXHIBITED CURRENT AND FLOW OSCILLATIONS, AND WAS DECLARED IN0PERABLE, o LICENSEE REFLOODED VESSEL BY GRAVITY FEED FROM RWST THROUGH THE IB RHR PIPING TO COLD LEGS, o SHUTDOWN COOLING RESTORED USING IB RHR PUMP WITHIN 15 MINUTES, CORRECTIVE ACTIONS o LICENSEE INITIATED TRAIN'ING SESSION ON EVENT, o DRAINDOWN PROCEDURE REVISED TO REDUCE DRAIN RATE.
O LICENSEE TO ADD VESSEL LEVEL INDICATIONS IN CONTROL ROOM, i
CONTACT: P. ENG
REFERENCES:
MORNING REPORT 09/20/88
. . ~ .. ,
F0ll0WUP-o EVENTS ASSESSMENT BRANCH IS CONSIDERING ISSUANCE OF AN l ' INFORMATION NOTICE:
o REACTOR SYSTEMS BRANCH PREPARING TEMPORARY INSTRUCTION,
.0 REGION 111 PREPARING ESCAL ATED ENFORCEMENT PACKAGE.
l l
I e
L -___m__._.___.m_____ ..-..___.._.
g l .to , sat x
. _, >% s.. o.te n s'4-
, \
i
\x
.; :n ,
% JC ,
1
'L jj g Aw wearsaa Top Hat Ponion of a'a'nT2*ea Upper Intemals gg Flow NW Holes Boot Seal Lower k
Internals Reactor Vessel Detail BYRONUNIT1 REACTOR YESSEL SCfe% TIC
. ...-..-.mm. i
?'.
88-38 7
HARRIS UNIT 1 ROBINSON UNIT 2 ENVIRONMENTAL QUALIFICATION PROBLEMS WITH l TARGET ROCK SOLEN 010 OPERATED VALVES PRQg[b CRACKS WERE DISCOVERED IN THE WIRE INSULAfl0N AND TERMINAL BLOCKS OF ENVIRONMENTALLY QUAllFIED TARGET ROCK S0LEN0ID VALVES j l
C!\&L THE CRACKING 0F THE INSULATION APPEARS TO RESULT FROM CHEMICAL INCOMPATIBILITY BETWEEN THE SILICONE RUBBER INSULATION AND THE .;
POTTING COMP 0UND THE TERMINAL BLOCK CRACKING MAY RESULT FROM OVERT 0RQUE OF THE LEAD i
WlRE SCREWS EITHER BY THE MANUFACTURER OR THE LICENSEE SAFETY SIGNIFICANCE THERE IS A POSSIBILITY THAT THESE CRACKS COULD CAUSE FAILURE OF THE VALVE. THESE VALVES ARE USED IN VARIOUS SAFETY RELATED APPLICATIONS INCLUDING THE REACTOR HEAD VENT, ElSCUSSION o CRACKS IN THE LEAD WIRE INSutATION AND TERMINAL BLOCKS WERE DISCOVERED IN TARGET ROCK S0LEN010 VALVES BOTH AT HARRIS AND ROBINSON o THE LICENSEE ORDERED ENVIRONMENTALLY QUALIFIED PRODUCTS, o CRACKS WERE FOUND ON "0LDER" (NSTALLED UNITS AND ON "NEW" UNITS IN SPARES INVENTORY o THE VALVE MAY HAVE UNDERGONE ENVIRONMENTAL QUALIFICATION (E0)
TESTING WITH CRACKED LEAD WIRE INSULATION, o SEVERAL UNITS USE TERMINAL BLOCKS OF A DlFFERENT BRAND THAN THE CNE USED IN THE EQ TESTED UNIT, CONTACT: R. KARSCH (301) 492-1178
REFERENCE:
9/19/88, MORNING REPORT 9/20/88 i
88-38 2
o TARGET ROCK HAS NO RECORD OF CHANGING TERMINAL BLOCK SUPPtIER.
o AS PART OF THElR INVESTIGATION OF THESE EVENTS.THE LICENSEE VISITED TARGET ROCK AND INSPECTED THEIR RECORDS, o QUALIFICATION CERTIFICATION HAD BEEN PROVIDED F01 ALL OF THE UNITS.
o EQ CERTIFICATION IS AVAILABLE FOR UNITS WITH KAPTON INSULATED LEAD WIRES. THESE 00 NOT EXHIBli CRACKING.
CgRRECTIVE ACTION THE LICENSEE HAS ORDERED REPLACEMENT LEAD WIRES WITH KAPTON INSULATION AND WILL UPDATE THEIR EQ FILES AS NECESSARY FOLLOWUP THE VENDOR BRANCH WILL FOLLOWUP ON THIS PROBLEM TO DETERMINE IF IT IS SAFETY SIGNIFICANT, IF IT IS GENERIC 10 ALL TARGET ROCK VALVES SUPPLIED TO THE INDUSTRY AND IF AN INFORMATION NOTICE IS NEEDED.
88-38 GRAND GULF UNIT 1 TDI INTERCOOLER ADAPTER F AILURE SEPTEMBER 15, 20, 1988 PROBLEM INTERhAL DIFFUSER PLATE (GUIDE VANE) 0F THE DIVISION 2 EMERGENCY DIESEL GENERATOR DROPPED ONTO THE INTERCOOLER CAUSING IT TO LEAK.
THE DIVISION 1 INTERNAL DIFFUSER PLATE HAS CRACK INDICATIONS, CAUSE CAUSE IS UNDER INVESTIGATION, BUT IT IS BEllEVED TO BE RELATED TO FATIGUE FAILURE AT THE HEAT AFFECTED ZONE OF THE FLANGE WELD CAUSED BY ,
EXCESSIVE VIBRATION SAFETY SIGNIFICANCE THIS POTENTI AL DESIGN DEFICIENCY COULD DERATE THE EDGs OR RESULT IN MECHANICAL BINDING RENDERING THEM INOPERABLE DISCUSSION o ON SEPTEMBER 15, 1988 THE LICENSEE WAS CONDUCTING AN INVESTIGATION TO DETERMINE THE CAUSE OF JACKET WATER LEAKAGE FROM THE DIVISION 2 EDG INTAKE MANIFOLD VENT LINE o IT WAS DISCOVERED THAT AN INTERNAL GUIDE VANE OF THE LEFT BANK INTERCOOLER HAD BROKEN LOOSE FROM THE ADAPTER SHELL AND DROPPED ONTO THE INTERCOOLER TUBE BUNDLE.
o ENGINE VIBRATION CAUSED THIS PIECE TO CUT INTO THE ALUMINUM FINS AND BRASS TUBES OF THE INTERCOOLER o DISPOSITION ON DIVISION 2 WAS TO MECHANICALLY REMOVE THE PART AND MAKE WELD REPAlRS TO ADD ADDITIONAL CONNECTION SURFACE FOR THE GUIDE VANE AND TO REDUCE THE AMOUNT OF FREE STANDING VANE THAT WOULD BE SUSCEPTIBLE TO MOVEMENT o FINAL DISPOSITION ON DIVISION 1 REASONED THAT SINCE ITS LEFT BANK ADAPTER WAS REPAIRED (FEB 1984) FOR AN IDENTICAL CONDITION IT CAN PERFORM ITS REQUIRED FUNCTIONS o DIVISIONS 1. 3 EDG WERE SUCCESSFULLY STARTED AND RUN PER TECH SPECS.
88-38
[
2 o ON SEPTEMBER 20, 1988 REPORTED THEIR SPECIAL INSPECTION OF THE DIVISION 1 INTERCOOLER DIFFUSER IDENTIFIED A CRACK ON THE INLET ADAPTER GUIDE VANE OF THE LEFT BANK INTERCOOLER E0LLOWUP o V-TYPE TDI DIESELS WITH DUAL TURBOCHARGER, COULD POTENTIALLY HAVE THIS PROBLEM: CATAWBA, PERRY, RANCHO SECO, RIVER BEND, SAN ONOFRE, SHEARON HARRIS, SHOREHAM, AND V0GTLE o THE LICENSEE IS CONSIDERING ISSUING A PART 21 REPORT, THE TDI OWNER'S GROUP HAS BEEN INFORMED o DIESEL INTERCOOLER LEAKS HAVE OCCURRED BEFORE, BUT TO OUR KNOWLEDGE THE PROBLEM HAS NOT BEEN STUDIED FOR GENERIC IMPACT o EAB RECOMMENDS TRANSFER OF LONG-TERM FOLLOWUP TO PLANT SYSTEMS BRANCH TO ASSESS THE GENERIC SAFETY SIGNIFICANCE CONTACT: C. SCHULTEN (301) 492-1192
REFERENCE:
EN 13497, 13502
q y
.$ .Q
{-
[A%C7%%iC7
' 1-^
f.'$R li' k i
I l g l }. l g
( ,4 I I I h. ;!.r.
4 l
4 w in E
I I
i a w i .
a m
l tsi a l ,
,! E
-h' 1
i o eea m_r_.t s o p_ _;r a
#u 3 _;
i ,
,, }~l~~ ~ _' rib 3 7 '
/ /E j, ea b h p f I
l l')8 i
I-w.-n-mw. i
.m I
, l
/~--%~l7
, -e th 7
;c;-
wmu+ m, wir .,... , .
~
bWavah%h*-Mer r# it--4. .
, . . . /
- - .J q l
Q 4-
)
l x
~ ~- , C ' .U$"
l
.', . /,4,g
~
- " X
-S
, s._
- l. l -
.h 1'. _\L P,S ,
t 1
(p- xI.3' ..
' 1
..~~
c e
y.
u r ---,
/ / =._gi
. , '" ' "O I. g 9
a g' ,e ~
t
$ e,
_.x j
(- .
4 y ,.
s.
y ' , ,
~
N fy !
Q $?p" % > L y$ @@
l, ..
gp p\ i f
1 , 1 .
ly" \ . ,. .
g
;,__,B :ji=,-=p W;;I l
l
_fm -
Ex. 9 J jj ,
t "i j
~-"
u- -
2:
y ..
1 v py -
I F
i
-M
^ ?Yh '$51 F _
.',i. / fl
ht,ILV CD/$6/DV d *d d 3 %# 320 76.* ** . C J
$ 'd l
4 i 3
k k
; A mL 1 4 M W :
isig. a S
.i ! si I5i I
6 a
w p j
)
iM1 e EI i n!E'N A
=
b se== =====""""'""f."~**~~]
.. - - - -_.,. ,,, _ .; y
- l g o
/;- .,m :,i .
6, ,
_ _ _ _ _ . ._- r t ) ,
\y \ I r r .
q ='~; . j:r . / " '
i 3
1 -
8 N .. -
g w C u @S - _
g 7
_-{ I, q ,
- c
.,, 5, l g5 a
# CL s
.I ,C a0 S el
/ .
1 i
p.,
4 *b . c1 r._ -.
y t e- s i
% 1 4
\* Y ;ut
\
g
## i I
A I
- $lj
?
S 4 6, ,1 b h l w //
= ___ x I
e e
4 *d GC840 88/12/60 SNDO 340 539 DGN WOdd
. .. ._.N I.*t W E9 i
! t
'l N d II r e,9 [ h
(= .,
f m',
N 4
.N/
H o+
r-
\ $
/# i d [s e
'~
yb e
g .g w
;b w a .. s Og *
,N 9"
3{
R
(-
gee F
$)
89 ? '%z ,
9= n '
r Ek .
r/n a
I c' 3 5
hj!!
I l
5 1, W ha s-elg-s se a ! 0:f I
.4 VI j i
J A
88-36 l ,
SURRY 2 THINNING OF MAIN FEEDWATER PIPING SEPTEMBER 26, 1988 PBQEL{f THE MAIN FEEDWATER PIPE NEAR A STEAM GENERATOR N0ZZLE IS THINNED TO LESS THAT THE MINIMUM ALLOWABLE THlCKNESS CAUSE EROSION / CORROSION SIGNIFICANCE FAILURE OF THE PIPE WOULD CAUSE HIGH ENERGY LINE BREAK INSIDE CONTAINMENT AND LOSS OF AUXILI ARY FEEDWATER TO THE STEAM GENERATOR DISCUSSION o ON SEPTEMBER 26, 1988. THE REGION ISSUED A PN STATING THAT ON CR ABOUT THAT DATE THINNING WAS DETECTED DURING AN INSPECTION o THE PIPE HAD BEEN INSPECTED DURING THE PREVIOUS OUTAGE o ONE SIMILAR PIPE WAS INSPECTED ON UNIT 1 LAST SPRING AND N0 UNEXPECTED THINNING WAS FOUND o ON SEPTEMBER 16, 1988, THINNING WAS FOUND ON THE SUCTION SIDE OF A MFW PUMP AT UNIT 2 o THE WALL WAS NOT LESS THAN MINIMUM ALLOWABLE BUT THINNING WAS GREATER THAN EXPECTED o EROSl0N/ CORROSION OF UNIT 2 MFW PIPING ON TliE SUCTION SIDE OF A MFW PUMP CAUSED THE CATASTROPHIC ACCIDENT OF DECEMBER 9, 1986 E0LLOWUP OEAB IS F0ll0 WING CONTACT: R. WOODRUFF (301) 492-1180
REFERENCE:
PNO-II-88-61. 9/26/88 e
0 hh
%. gj$6* co~3 34 /* u MFP sa
;*- o 'i-f r
I o5L g
AF HDRS q.
csr M
AP'P y 9
m l oF 3 e
50R?d 2.
9/u/BS
suef0t scia smalf ER EDIN H/!i/M
!. FLaff SFIClfic NTA Nft $178 HlfPostill81&LC&llt COEPL1- mm m CatlNS &I0ft HLW fMAL 151 lit H/ll/H llilM00D ! !& MilPflft 90 8 4 II H/!I/06IliftiTALLif ! lH & Oftlt 10 4 1 4 19/20/88$&lifLOCll 1 IM & FitSMIL 90 3 0 3 H/24/II19D1&lP0!ff ! 11 I ISIIPIttf TIS 1 ! 3 H/25/88SEQO0 fit i 1& Fits 00Ith 10 0 1 1 S M &tf N C0EPLIC&fl0IS lift N!! COEPLIC&flNs IBIH P0!ff 2 MilN EHAL Mffl005 TO LOC &ft lifACID N$T LiftL FLott FOR N67 II LO LiftL ALAN, Mit HS B&HALLY fi!PFil if 111705tt. ALL ION lllitfil IWifti. IIllfMAL IN PollflN IDIC&flN FOR 900 f H llMil21ITIFS NT Nt f0 ILIC CitClif H lff 4
II. COMPARISON OF WEEKLY STATISTICS WITH INDUSTRY AVERAGES SCRAMS FOR WEEK ENDING 09/25/88 SCRAM CAUSE POWER NUMBER 1988 1987 1986 1985 0F WEEKLY WEEKLY WEEKLY WEEKLY SCRAMS (5) AVERAGE AVERAGE AVERAGE AVERAGE YTD (3)(4) (8)(9) o POWER >15%
EQUIP. RELATED >15% 0 3.1 3.9 4.3 5.4 PERS. BELATED (6) >154 1 1.0 1.3 1.8 2.0 OTHER(7) >15% 1 0.7 1.2 0.4 0.6 o Subtotal **
2 4.8 6.4 6.5 8.0 0 POWER <15%
EQUIP RELATED <15% 2 0.7 1.2 1.4 1.3 PERS. RELATED <15% 1 0.5 0.6 0.8 0.9 DTHER <15% 0 0.2 0.3 0.2 0.2 c Subtotal **
3 1.4 2.1 2.4 2.4 co Total ***
5 6.2 8.5 8.9 10.4 MANUAL VS AUTO SCRAMS TYPE NUMBER 1988 1987 1986 1985 CF WEEKLY WEEKLY WEEKLY WEEKLY SCRAMS AVERAGE AVER 4GE AVERAGE AVERAGE YTD MANUAL SCRAMS 1 1.0 1.4 1.0 1.0 AUTOMATIC SCRAMS 4 5.1 7.0 7.9 9.4 i
1 1
)
I
_____-__________-________L
E
+
P &*
5 5
= -
3 I s B-
****E I W 85 EE E-EE8I l s-sN.
s E s !m!E s en 3 2626 g . -
O
= 5 E G W 5
- Sm w 5 Es E -e
=
E E Ymn-E GES E
Eds
**I E =
h W_aB
~
@ E !
=
a
=_g
- e
.- w m.
E
= m w=
E E REE a a
=w 3 3 -
Es ss n=s I
.EsC 3
e I9 -
f 4 ) ) ) ) ) )
NOTES
- 1. PLANT SPECIFIC DATA BASED ON INITIAL REVIEW OF-50.72 REPORTS FOR THE WEEK OF INTEREST. PERIOD 15 MIONIGHT SUNDAY THROUGH MIDNIGHT SUNDAY. SCRAMS ARE DEFINED AS REACTdR PROTECTIVE i ACTUATIONS WHICH RESULT IN R00 MOTION. AND EXCLUDE PLANNED
< TESTS OR SCRAMS AS PART OF PLANNED SHUT 00WN IN ACCORDANCE
! WITH A PLANT PROCEDURE. THERE ARE 109 REACTORS HOLDING AN OPERATING LICENSE.
- 2. COMPLICATIONS: RECOVERY COMPLICATED BY EQUlPMENT FAILURES OR PERSONNEL ERRORS UNRELATED TO CAUSE OF SCRAM.
- 3. PERSONNEL RELATED PROBLEMS INCLUDE HUMAN ERROR, PROCEDURAL DEFICIENCIES, AND MANUAL STEAM GENERATOR LEVEL CONTROL PROBLEMS.
- 4. "0THER" INCLUDES AUTOMATIC SCRAMS ATTRIBUTED TO ENVIRONMENTAL CAUSES (LIGHTNING), SYSTEM DESIGN, OR UNKNOWN CAUSE.
1