Text
~
- g; y%
- top, C,
y UNITED STATES
}p j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066 4001 A ***** /
April 3, 1997 LICENSEE: Vermont Yankee Nuclear Power Corporation FACILITY: Vermont Yankee Nuclear Power Station
SUBJECT:
SUMMARY
OF MARCH 26, 1997, MEETING WITH REPRESENTATIVES OF VERMONT YANKEE h0 CLEAR POWER COMPANY On March 26, 1997,-pursuant to notice, the NRC staff met with representatives-of. Vermont Yankee Nuclear Power Corporation (the licensee) at NRC Headquarters in Rockville, Maryland. A list of attendees is provided in Enclosure 1.
Materials provided by the' licensee at the meeting are provided in Enclosures 2 and 3.
The licensee discussed the subjects in Enclosure 2.
Salient points included:
1.
An organization chart was provided for information. The relationship between the licensee's organization and Yankee Atomic Electric Co.
(YAEC) was discussed, including the use of YAEC for the QA function, and the use of Vermont Yankee employees for systems engineering.
2.
The licensee expects to submit Improved Technical Specifications sometime between September and the end of 1997.
3.
Corrective action processes were discussed.
Some needed corrections identified in the design basis verification effort are already being i
addressed.
4.
The licensee stated that they are encouraging employees to identify problems early, and in some cases using cash awards to provide encouragement.
5.
The licensee stated that uncertainties resulting from recent Vermont State legislature deregulation activities are expected to be resolved in the near future, possibly within the next month.
t 2!002g 9704210162 970403 F
PDR ADOCK 05000271 P
%W v
i April 3, 1997-6.
The energy situation in the northeast was described including projected capacity margins. (see Enclosure 3), and activities of the.New England Nuclear Futures Committee.
(Original Signed.by P. Milano for)
Vernon L. Rooney, Senior Project Manager Project Directorate I-3 i
Division of Reactor Projects - I/II 0ffice of Nuclear Reactor Regulation 1
c Docket No. 50-271
'~"
Enclosures:
1.
List of Attendees s
2.
Vermont Yankee (handouts) 3.
1997 Projected Capacity Margins cc w/encls:
See next page" Distribution HARD COPY W/ ENCLOSURES HARD'COPYW/0ENbl050RES Docket File OGC h
PUBLIC ACRS -
PDI-3 RF E-MAIL SCollins/FMiraglia VRooney RZimmerman ADe Agazio SVarga.
WDean JZwolinski PMilano Slittle Dross (e-mail SAM)
DOCUMENT NAME: 'G:\\R00NEY\\MTGSUM.326 Ta receive a copy of thle document. indicate in the beau 'C' = Copy without attachment / enclosure
'E" = Copy with attachment / enclosure "N* = No copy 0FFICE PM:PDI-3 sl4 LA:PDI-l n()
(A)D:RQI-3 l l
-l NAME VRooney
/ M1 SlittleW PMilaW5~
DATE 04/ct,/97 i e "
04/ GL/97 04/ 3 /97 0FFICIAL RECORD COPY
,. ", 6. -
The energy situation in the northeast was described including projected capacity margins (see Enclosure 3), and activities of the New England Nuclear Futures Committee.
.h Vernon L. Rooney, Senior Project Manager Project. Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosures:
1.
List of Attendees 2.
Vermont Yankee (handouts) 3.
1997 Projected Capacity Margins
.cc w/encls: See next page i
k 1
J
ee Vermont Yankee Nuclear Power Vermont Yankee Nuclear Power Station Corporation cc:
Mr. Peter LaPorte, Director Regional Administrator, Region I ATTN: James Muckerheide U. S. Nuclear Regulatory Commission Massachusetts Emergency Management 475 Allendale Road Agency King of Prussia, PA 19406 400 Worcester Rd.
P.O. Box 1496 i
R. K. Gad, III Framingham, MA 01701-0317 Ropes & Gray One International Place Mr. Raymond N. McCandless Boston, MA 02110-2624 Vermont Division of Occupational and Radiological Health Mr. Richard P. Sedano, Commissioner Administration Building Vermont Department of Public Service Montpelier, VT 05602 120 State Street, 3rd Floor Montpelier, VT 05602 Mr. J. J. Duffy Licensing Engineer Public Service Board Vermont Yankee Nuclear Power State of Vermont Corporation 120 State Street 580 Main Street Montpelier, VT 05602 Bolton, MA 01740-1398 Chairman, Board of Selectmen Mr. Robert J. Wanczyk Town of Vernon Director of Safety and Regulatory P.O. Box 116 Affairs Vernon, VT 05354-0116 Vermont Yankee Nuclear Power Corp.
Ferry Road Mr. Richard E. McCullough Brattleboro, VT 05301 Operating Experience Coordinator Vermont Yankee Nuclear Power Station Mr. Ross B. Barkhurst, President P.O. Box 157 Vermont Yankee Nuclear Power Governor Hunt Road Corporation Vernon, VT 05354 Ferry Road Brattleboro, VT 05301 G. Dana Bisbee, Esq.
Deputy Attorney General Mr. Gregory A. Maret, Plant Manager 33 Capitol Street Vermont Yankee Nuclear Power Station Concord, NH 03301-6937 P.O. Box 157 Governor Hunt Road Resident Inspector Vernon, VT 05354 Vermont Yankee Nuclear Power Station U.S. Nuclear Regulatory Commission Mr. Donald A. Reid P.O. Box 176 Vice President, Operations Vernon, VT 05354 Vermont Yankee Nuclear Power Corp.
g Ferry Road Chief, Safety Unit Brattleboro, VT 05301
- 0ffice of the Attorney General
-One Ashburton Place, 19th Floor Boston, MA 0210B
I' LIST OF ATTENDEES MEETING WITH VERMONT YANKEE NUCLEAR POWER CORPORATION ROCKVILLE. MARYLAND MARCH 26. 1997 ECLEB Roy Zimmerman, Assoc. Dir. for Projects John Zwolinski, Dep. Dir., Div. Reactor Projects - I/II Al De Agazio, Acting Proj. Dir, PDI-3 Vernon Rooney, Senior Project Manager yERMONT YANKEE NUCLEAR POWER CORPORATION Ross Barkhurst, Pres. and CEO Don Reid, Vice Pres. Operations Bob Wanczyk, Dir. Safety and Regulatory Affairs.
Edgar Lindamood, Dir. Engineering d
ENCLOSURE 1 e
~
'f ENCLOSURE 2 rt j
i.
Vermont Yankee
..n: p,y n_,ggggovy=121&.a,. ;. s._
l e Engineering e Improved Tech Specs e Corrective Action L
e Vermont Yankee Goals l
e Deregulation o Nuclear Futures Committee i
i i
Vermont Yankee
.-__..--_.__....m._
e w.
I SENIOR MANAGEMENT l
ORGANIZATIONAL CHANGES NOVEMBER-FEBRUARY-l ROSSBARKHURST l
PRESIDENT & CEO l DIRECTOROFSAFETY&
REGULATORY AFFAIRS ROSERTWANCZYM
.)
QUAUTY ASSURANCE UCENSING ISANAGER f
DIRECTOR
~
ROSERTSONCA YAEC f
6 VICE PRESIDENT OPERATIONS DONALD REIO E
i n
I TRAINING MANAGER l
PLANT DIRECTOR OF ENGINEERING BRIAN FINN MANAGER l
EDGAR LINDAMOOD g
}
oREo MARET
)
i NUCLEAR SERVICES htANAGER TECHNICAL SUPPORT MAINTENANCE YNSO SUPERINTENDENT SUPERINTENDENT FRANK NELIN 800CHAELWATSON N & MCTER DEMON j
ENOONEER$NO MANAGER i
YNSO OPERATION 3 SYSTEM ENGINEERING ISANAGER MECHANICAL DESIGN M MR KEVIN BRONSON ENGINEFRING BRANAGER DENNIS LEGERE YNSO SYSTEMS DESIGN E00GINEERING RAANAGER YA' SO
l-Engineering
~
l e Design Basis Documentation Process / Sc1edule l
l Open Items l
Program Maintenance l
Instrument Setpoints/FSAR i
e Vermont Yankee / Yankee Atomic Organization Ownership Integrated Organization /
Process Vermont Yankee e
1 L
i I
t i
1 i
j 4
System Engineering 3
- m. m,
i 1
e Mission / Focus 4
[
Proactive System Monitoring Maintenance Rule Inter-Dept Coordination e Status l
l Staffed - Qualified Personnel Review Procec ures, On-line Maintenance, Design Basis Documents o Successes Programs e
- v. - a..
i.
L Corrective Action
,.... gQf?(%%.id&g y ',?p-s.. w...
w:.
l j
e Sing e Process (Event Report) l since February,1995, used at plant and Engineering i
j e Dynamic Process - 5 Revisions in l
2 years e Initiatives Optimize Reviews Trending (Human Perf /
Procedures)
Operability Assessments and Timeliness Benchmarking Root Cause Vermont Yankee
D L
Vermont Yankee i'
i Goals - 1997 i
,n.w a n,. ~.
i o Emphasis on:
l Safety Performance o Encourage Problem e
Reporting i
i e Consistent Goals for All l
Personnel i
Vcrmont Yankee r
l j'
L j
Improved Tech Specs i
e Accomplishments 1
i 6 of 7 sections generatec; 4 l
reviewed l
e Validation Instrument Setpoints l
Equipment Design Bases e Reviews / Self Assessments l
Independent Assessment e Schedule
. Vermont Yankee
ENCLOSURE 3 f
,,9 o-a 1
1997 Projected Capacity Margins (Mair= var
- a % i.2.3 oos n on soo73 e
a 4.000 p
3 a.000 8
y a
2.000 i
i, 1.0o0 v
.C_
is E"
o
\\g 4 (1.000)
\\
AI 1
- **a
/ \\g a
s la 3
- a. (2.oo.3-]
V i
n.
k j
O (3,000) w
- a r
(4,000)
- E (s. coo) i
'iii!
i.i i.i.i.i.i.i,i.i.,
.a.
u.
u.
a u
u ggc E
c ss
===a nEou
$3$$$g2
--ex[32224IEI 3
(
-es e n:n l
.