Summary of 971103 Meeting W/Vynpc in Rockville,Md on Plans & Activities Re Submittal & Implementation of Improved TS at Plant.List of Attendees,Handout of Plant Presentation & W Beckners Comments Encl
ML20198Q521
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 11/05/1997
From: Jabbour K
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-M72490, NUDOCS 9711120235
Download: ML20198Q521 (14)


Text

-

, 37)-27/

pm Cf og t UNITED STATES

. s

,j NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. act M 0001 k.....,/ November 5, 1997 j LICENSEE: Vermont Yankee Nuclear Power Corporation FACILITY: Vermont Yankee Nuclear Power Station

SUBJECT:

SUMMARY

OF HOVEMBER 3. 1997. HEETING WITH VERMONT YANKEE POWER CORPORATION AND THEIR CONSULTANT REGARDING THE IMPROVED TECHNICAL SPECIFICATIONS - VERMONT YANKEE NUCLEAR POWER STATION (TAC NO.

M72490)

Introduction On November 3. 1997, the NRC staff met with Vermont Yankee Nuclear Power Corporation (VYNPC) representatives and their consultant from Excel Corporation at One White Flint North Rockville. Maryland. The purpose of the meeting was to discuss VYNPC plans and activities regarding the submittal and implementation of the improved technical specifications (ITSs) at the Vermont Yankee (VY) Nuclear Power Station. Enclosure 1 lists the meeting attendees Discussion.

Mr. B. Buteau. VYNPC discussed the status of the ITSs development program for VY. He stated that VY is currently developing a set of design basis documents which will be used to verify the final safety analysis report (FSAR) and the bases of VY ITSs. The current target time frame for the ITSs submittal is the last quarter of 1998 or beyond. VY is adhering to the guidance provided in NEl 96 06. " Improved Technical Specification Conversion Guidance." VY is relocating the technical specifications (TSs) screened out of their current TSs into a technical requirement inanual (TRM) which will become a section of the FSAR by iaference. The information in the TRM will be controlled in accordance with the requirements of 10 CFR 50.59. VY proposed to have a meeting with the staff after the submittal is made to discuss the ITSs layout, philosophies and significant issues. The handout used for VY's presentation is incl ded as Enclosure 2. {)(

Mr. W. Beckner NRC. stated that most of the significant problems on previous conversions occurred due to the proposed changes not being as accurate and succinct as desired to facilitate staff review. The handout containing his comments is included as Enclosure 3. \

NRCFRECURERddk

. ;u"R8au un83n p PDR ll ,1 llll l(ll,11,1ll

2 Conclusion The NRC staff and VY representatives agreed to meet periodically to review the progress made in the ITSs conversion process. VY will periodically inform the

- staff of their best estimate of the submittal time frame.

Original signed by Kahtan N. Jabbour, Senior Project Manager Project Directorate 1-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosures:

1. List of Attendees
2. Handout of VY's Presentation-
3. Handout of W. Beckner's Comments cc w/encls: See next page DISTRLBUTION - Encis. 1&2 only E-ma1' Hard Coov. A'l Enclosures S. Co' lins /F, Miraglia (SJC1)(FJM) Docket-Fi'e R. Zimmerman (RPZ) PUBLIC B. Boger (BAB2) PDI 3 Rdg R. Eaton (RBE1) OGC S. Little ACRS T. Martin (SLH3) K. Jabbour C. Hehl (CWH)

S. Dinsmore (SCD1)

G. Georgiev (GBG)

S. Ali (SAA3)

C. Smith (CXS1)

T. McLellan (TKM)

W. Beckner (WDB) i

. DOCUMENT NAME: G:\JABBOUR\MTGITS.suu - n Ta receive e copy of this slocument,inecote in the boa: 'C' = Cqpy without ettschment/s 'E' = Copy with ettschment/ enclosure 'N' = No copy

@l e OFFICE PDI 3/PM ffg l PDI*l/LA M L l (A)DbOI 3 l l IIAME KJethourCf fod $little F REston DATF 11/ $ /97 11/ 6 /97 11/ ( /97 0FFICIAL RELORD COPY

=

Vermont Yankee Nuclear Power Corporation CC:

Re Mr. Raymond N. McCandless U.gional Administrator.

S. Nuclear RegulatoryRegion 1 Commission Vermont Division of Occu)ational 475 Allendale Road and Radiological Healt1 King of Prussia. PA 19406 Administration Building Montpelier. VT 05602 Mr. David R. l.ewis Shaw Pittman. Potts & Trowbridge Mr. J. J. Duffy 2300 N Street. N.W. Licensing Engineer Washington, DC 20037-1128 Vermont Yankee Nuclear Power Corporation Mr. Richard P. Sedano Commissioner 580 Main Street Vermont Department of Public Service Bolton. MA 01740 1398 120 State Street. 3rd Floor Montpelier. VT 05602 Mr. Robert J. Wanczyk Director of Safety and Regulatory Public Service Board Affairs State of Vermont Vermont Yankee Nuclear Power Corp.

120 State Street 185 Old Ferr Montpelier. VT 05602 Brattleboro.y VT Road05301 Chairman. Board of Selectmen Mr. Ross B. Barkhurst. President Town of Vernon Vermont Yankee Nuclear Power P.O. Box 116 Corporation Vernon. VT 05354 0116 185 Old Ferr Brattleboro.y VT Road05301 Mr. Richard E. McCullough Operating Experience Coordinator Mr. Gregory A. Maret. Plant Manager Vermont Yankee Nuclear Power Station Vermont Yankee Nuclear Power Station P.O. Box 157 P.O. Box 157 Governor Hunt Road Governor Hunt Road Vernon. VT 05354 Vernon. VT 05354

-G. Dana Bisbee Esq. Mr. Donald A. Reid Deputy Attorney General Senior Vice President. Operations 33 Capitol Street Vermont Yankee Nuclear Power Concord. NH 03301 6937 Corporation 185 Old Ferr Resident inspector Brettleboro.y VT Road05301 Vermont Yankee Nuclear Power Station U.S. Nuclear Regulatory Comission Ms. Deborah B. Katz P.O._ Box 176 Box 83-Vernon..VT 05354 Shellburne Falls. MA 01370 Chief. Safety Unit Mr, Jonathan M. Block. Esq.

.0ffice of the Attorney General Miin Street One Ashburton Place. 19th Floor P.O. Box 566 Boston MA 02108 Putney. VT 05346 0566 Mr. Peter LaPorte. Director ATTN: James Muckerheide Massachusetts Emergency Management Agency 400 Worcester Rd, P.O.- Box 1496 Framingham MA 01701-0317 m _. a_-.m.___.m______.

NRC/VYNPC Meetina November 3, 1997 Ljst of Attendees EC VYNPC and Consultant K. Jabbour R. Wanczyk W. Beckner B. Buteau C. Smith J. Stanton (Excel)

ENCLOSURE 1

t 1

.i s i i

I I I I

i l  ?

l I

i

),

VERMONT YANKEE NUCLEAR POWER CORPORATION l

i t t 4

l lMPROVED TECHNICAL SPECIFICATION DEVELOPMENT PROGRAM STATUS i i  :

i l

I 4

i

! PRESENTED TO THE USNRC MONDAY NOVEMBER 3,1997

! t I

t t

f j

I f

t

. i l

r .

ENCLOSURE 2

I5 -

.]g ( }

1 I i

! i 1

IR

. l' i

'2 5

.F 8 3 i s s a I e I

B a e

6

Overview of VY ITS Package Development initiated work on the improved Tech Spec Project in June of 1996 with a team of 4 dedicated W staff members and 2 Excel Services Tech Spec experts.

Given that W has custom tech specs and has implemented very few line item improvements there are currently many M Docs and L Docs in the W submittal.

Additionally, the venfication of all statements and innets in the new ITS document has been very time consumeng and has required significant Engineering resources.

As a result of the 50.54(f) letter engineering resources were redirected away from ITS and onto design bases related issues. ,

W is currently developing a set of Design Basis documents which will be used to venfy our FSAR and will be used to verify the bases of our ITS.

To assure we benefit from the new DBDs the iTS project has been delayed from September 1997 to the last quarter of 1998.

To ensure that W is developing an ITS package that will be in line with NRC de-dres we have been adhenng to the guidance provided in NEI 96-06

Overview of VY iTS Package Development VY Philosophies When Building ITS:

Spec adoption: Adopt new ITS specs that don't impose significant additional burden Relocate specs screened out of CTS to a Technical Requirements Manual Provide enough infornation to simplify and expedite NRC review Avoid " beyonds" and "beyond beyonds"

m , - _. .

Overview of VY ITS Package Development Discussion of Significant ITS Issues:

W is making the TFiM e section of the FSAR, by reference, and is relocating CTS requirements to the TRM.

This information will be controlled in accordance with the requirements of 50.59.

- Main Steam Line Rad Monitor (Relocating to Tech Requirements Manual) '

W is covered by BWROG report NEDO-31400

- W is assuming that NUREG 1433 rev 2 will siriiply be the incorporatior of travelers.

Markup convention is that which was in place at the time the W ITS was stwted.

Can i:1 formation be relocated tu documents other than the FSAR?

G S. P

' Overview of VY ITS Package Development Removal of Fire Tech Specs from CTS

- Currently have a i-roposed Change submitted to remove the Fire Tech Specs frcm the CTS.

Pursue proposed change now or incorporate the change via ITS?

Reviewer Training

- W proposes ,nroviding training to the NRC review team on the W plant design and CTS & ITS Spec layout, philosophies and significant issues.

' - ' ~ ' ' ' ' " ' ' ' ' ' ' " ' '

U Overview of VY ITS Package Developmer t Questions for NRC:

Are there any philosophy changes W should keep in mind as the iTS package development continues?

l l -

What have been the most significant problem areas with the ITS packages reviev ad so far?

is theses one particular ITS package that has come through that stands out as a model for others to follow?

What can VY do to help with NRC's -aview of the ITS packege?

e

i Conversions to improved Standard Technical Specifications Meeting with Licensees

  • Review expectations for submittal o NEl 96-06, improved Technical Specifications Conversion Guidance o Attachment 1, NRC Recommended Conversion Application Guidelines o Current adjustments
  • Do not use unapproved TSTFs
  • Eliminate beyond scope issues

~

  • Realistic schedular expectations .
  • Amendment about a month prior to implementation: should know what ITS look like about three or more months before implementation Conversion Review Process
  • License Conditions a Curveillance Requirements

= Control of Relocated items

  • Screening Checklist
  • Ongoing communications o Primarily Project Manager (PM)

PM can coordinato other communications o Lead reviewer and section specific reviewers as appropriate o Technical branch reviewer if necessary

  • Example Safety Evaluation (SE) [ Robinson]

o Provide copy o Discuss need to submit tables tc support SE

  • Example of good conversion submittal o Susquehanna o Avellable in PDR
  • Listen to and address licensee comments y ENCLOSURE 3 m

. ~ .

. Conversion Screening Checklist Plant Name: Section: Section Lead:

j QUESTION YES NO COMMENTS I

,  ! 1. Does the submittel include a CTS markup and associated DOCS, an STS markup and associated JFDs, and a clean copy of the .

lj proposed ITS?

.i 2. Is the CTS markup legible, caerly marked, ~

) , and easy to follow?

3. Is the STS markup legible, clearly marked, j and easy to follow?
4. After reading a sampling of the administrative change DOCS, does it appear that the licensee has correctly categorized these changes as ad.ninistrative (i.e. fnere are no hidden technical changes!7
5. After reading a sampling of the less restrictive DOCS, does it appear that the licenses has provided adequate technical justification to support the less restrictive .

changes? l

6. After reading a sampling of the less restrictive DOCS, does it appear that the licensee has identified all of the major beyond scope changes in the submittal cover latter?
  • Desired response to all questions is "yes."

G:\ CONTRACT \ SCREEN.TBL 1

Conversion Screening Checklist QUESTION YES NO COMMENT

7. After reading a sampling of the more

. restrictive DOCS, does it appear that the

! licensee has provided a reason for adding I the new requirement, other than simply l stating that it is consistent with the STS?

8

8. After reading a sampling of the JFDs, does
it appear that the licensee has adequately l justified differences from the STS?
9. After reading a sampling of the JFDs, does it appear that the licensee has identified i pending TSTF travelers and potentially new ,

generic changes? __

l 4

l I .

  • Desired response to a5 questions is "yes." l G:\ CONTRACT \SC3EEN.TBL 2 ,