ML20236Q938

From kanterella
Revision as of 11:14, 20 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides Individual Exam Results for Applicants Who Took June 1998 Initial License Exam.Informs That Licenses Cannot Be Issued to Two Candidates Who Completed Exam Until Proven That Experience Requirements Have Been Met
ML20236Q938
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/15/1998
From: Leach M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Webb Patricia Walker
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 9807210135
Download: ML20236Q938 (2)


Text

__

July 15,1998 W. P. Walker Training Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, WI 54241 L) ear Mr. Wa?ker:

This letter is to provide you with individual examination results for your applicants who took the

' June 1998 initial license examination. In accordance with 10 CFR 2.790, this information is considered " proprietary." The enclosed information supplements and is in addition to the examination report which will be issued shortly.

The following information is enclosed with this letter:

Enclosure 1: Completed ES-501-2, Power Plant Examination Results Summary, which summarizes the examination results. All individuals passed the examination.

Enclosure 2: A copy of each individual's license or letter, as applicable.

Enclosure 3: Operator Licensing Examination Report, ES-303-1, and ES-303-2, if applicable. These reports provide individual examination rest:!!s for each applicant.

Enclosure 4: ES-401-7, written examination and answer sheets for each applicant.

Enclosures 3 and 4 provide information identified by the examiners for each irdvioual applicant.

Through your Systems Approach to Training (SAT) Program, we expecPf ou will review the results and provide appropriate remedial training for individuals independent of their overall pass status. Each applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398.

Licensos cannot be issued to two candidates who successfully completed the examination, including the individual who has requested an informal review of the denial of his senior reactor operator license application, until we receive documentation from Point Beach Nuclear Plant management that the candidates have met the experience requirements and successfully completed all Point Beach Nuclear Plant training program requirements for a senior reactor operator. A license cannot be issued to the individual who requested an informal review until we t/

have completed the review. lOj i

in addition, we understand that the candidate's will be enrolled in the Point Beach Nuclear Plant continuing (requalification) licensed operator training program and that they will be current and satisfactory in that program while they are completing the requirements for a senior reactor operatorlicense.

,; n G 9907210135 990715 PDR ADOCK 050002d4 V PDR

$Wh

I W. P. Walker 2 July 15,1998 If you have any questions pertaining to this information, please contact me at 630-829-9705.

Sincerely, Original signed by:

Melvyn N. Leach, Chief Operator Licensing Branch Docket No.: 50-266 Docket No.: 50-301

Enclosures:

As stated cc w/ enclosures 1 and 2 ONLY:

S. A. Patutski, Site Vice President Distribution:

Docket File w/o encls PUBLIC-lE42 w/o encls RHI Public Document Room w/o encls DOCUMENT NAME: P:\PTBCH. SUM To receive a eq w of this document. Indicate in the bor "C" = Co;y w/o attach /enci *E" = Copy with attach /enci"N" = No copy OFFICE Rlll:DRS l Al Rill:DRS C NAME RMBalley:mab/3V MNLeach Nu DATE 07/15/98 07/15/98 OFFICIAL RECORD COPY

_ _ _ .