IR 05000458/2020412

From kanterella
Revision as of 01:17, 9 February 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Security Baseline Inspection Report 05000458/2020412
ML20272A287
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/28/2020
From: Ray Kellar
Plant Support Branch-1
To: Vercelli S
Entergy Operations
References
IR 2020412
Download: ML20272A287 (7)


Text

September 28, 2020

SUBJECT:

RIVER BEND STATION - SECURITY BASELINE INSPECTION REPORT 05000458/2020412

Dear Mr. Vercelli:

On April 17, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station. On September 16, 2020, the NRC inspectors discussed the results of this inspection with Mr. Bruce Chenard, Director of Engineering, and other members of your staff.

The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Digitally signed by Ray L. Kellar Ray L. Kellar Date: 2020.09.28 15:54:33 -05'00'

Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 05000458 License No. NPF-47

Enclosure:

As stated

Inspection Report

Docket Number: 05000458 License Number: NPF-47 Report Number: 05000458/2020412 Enterprise Identifier: I-2020-412-0000 Licensee: Entergy Operations, Inc.

Facility: River Bend Station Location: St. Francisville, Louisiana Inspection Dates: September 14, 2020 to September 16, 2020 Inspectors: R. Lanfear, Physical Security Specialist A. Meyen, Physical Security Inspector Approved By: Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at River Bend Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following

procedure elements: Protective Strategy Evaluation

(1)

  • Tier I: 02.01 all requirements completed except 02.01j 02.02 all requirements completed 02.03a completed 02.04a,b,c,e completed
  • Tier II: 02.05a complete 02.06 all requirements completed except 02.06b,c 02.07b,c,e completed
  • Tier III: 02.08 all requirements completed 02.09a,b completed 02.10a completed 02.11 all requirements completed

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 16, 2020, the inspectors presented the security baseline inspection results to Mr. Bruce Chenard, Director of Engineering, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71130.05 Corrective Action CR 2018-05785

Documents 2018-05786

2018-08834

2018-05884

2018-05164

2018-05950

2018-05573

2018-05593

2018-05779

2019-01163

2019-00618

2019-04024

2019-03790

2018-00027

2018-02352

20-03878

20-03879

2019-03793

LO-RLO 2019-00033 CA-4/5

LO-RLO 2018-00005

Miscellaneous Local Law

Enforcement

Agreement

Physical Security

Plan

Safeguards

Contingency Plan

Training and

Qualification Plan

Procedures EN-NS-215 Conduct of Security Force Exercises and Drills 21

EN-NS-215-1 Tactical Response Drills 0

SDI-08 RBS Protective Strategy Plan 25

Inspection Type Designation Description or Title Revision or

Procedure Date

Self-Assessments LO-RLO-2019- Self-Assessment/Formal Benchmark Report 12/12/2019

00033

QA-16-2018- Quality Assurance Audit Report 12/03/2018

RBS-1

Work Orders WTRBS 2018-27-CA-28/29

5